建造
East Glisan Street Update: NE 102nd to 162nd Avenues
Transportation
Under Construction
Construction in phases Spring 2018 to Summer 2024
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.
Brentwood-Darlington Multimodal Improvements
Transportation
Under Construction
Construction 2024-2025
A Portland Bureau of Transportation (PBOT) project improving access to several Title 1 schools. Includes new sidewalks and crosswalks on SE Duke and Flavel streets, a neighborhood greenway on Knapp/Ogden streets, and a new signalized crossing of SE 82nd Avenue.
Greenleaf Tank 3
Capital Improvement Project
In Planning
November 2023 to February 2025
As part of the Water Bureau's efforts to increase the amount of water available on Portland's west side for firefighting and earthquake preparedness, we will construct a new 175,000-gallon water storage tank in Forest Park.
Sidewalk Infill: SE Washington St: 80th-82nd
Transportation
Engineering And Design
Construction scheduled for late summer/early fall 2024.
The Portland Bureau of Transportation (PBOT) is infilling sidewalk along the south side of SE Washington St from SE 80th Ave to 82nd Ave and closure of several driveways. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).
2022 Traffic Signals Superbundle
Transportation
Under Construction
Construction begins spring 2023
New traffic signals at: SW Naito Parkway & SW Whitaker St, SE 52nd Ave & SE Woodstock St, NE MLK Blvd & NE Going St, E Burnside St & SE 16th Ave, SE Washington St & SE 86th Ave, SE 148th Ave & SE Main St, NE Glisan St & NE 113th Ave, plus street lighting on NE Glisan St from NE 82nd-162nd
Energy Savings Performance Contract
Parks
Active
Ongoing
On September 4, 2019 City Council heard a Report from Procurement on the Regular Agenda to accept the Guaranteed Maximum Price of $978,978 from McKinstry to implement Phase 1 of the ESPC and enter into the Design-Build Contract for Phase 1 work.
Parklane Park Project
Parks
Closed While Under Construction
Expected opening date: Winter 2024/25
Thanks to funding from System Development Charges, Parklane Park will be expanded from 5 acres to 25 acres.
Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
Multimodal Missing Links
Transportation
Active
The Portland Bureau of Transportation (PBOT) is building immediate connections and safety improvements in Portland's pedestrian, bicycle, transit, and traffic calming networks.
Cedar Commons
Rental
Open
Summer 2021
Cedar Commons, a new development by Related Northwest and Central City Concern in the Powellhurst-Gilibert neighborhood, provides 60 affordable units targeted to people exiting homelessness.
NE Tillamook-Hancock Neighborhood Greenway Enhancement Project (Phase II): NE 28th to NE 62nd avenues
Transportation
Engineering And Design
Construction in phases beginning in 2021
The Portland Bureau of Transportation (PBOT) is constructing a series of design changes on the Tillamook-Hancock Neighborhood Greenway between NE 28th and NE 62nd avenues. Phase 1 from N Flint to NE 28th was completed in 2019.
NE 60th Avenue and Halsey Street Area Improvement Project
Transportation
Engineering And Design
Construction late 2024
Crews and contractors with the Portland Bureau of Transportation (PBOT) will repave, add traffic signals and turn lanes, widen sidewalks, and build bike improvements along NE 60th Avenue and Halsey Street. This will improve traffic flow and make it safer for pedestrians and people biking or driving.
NW/SW 20th Ave Neighborhood Greenway: Raleigh to Jefferson
Transportation
Under Construction
Phase 2 construction completion awaiting building construction to finish.
This project will improve conditions pedestrians and people biking by reducing vehicle speeding, reducing auto traffic volumes, upgrading crossings of busy streets, and creating new connections to existing bicycle and pedestrian infrastructure on or near SW and NW 20th Ave.
70s Greenway: Cully Connector
Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Jade and Montavilla Multimodal Improvements Project
Transportation
Engineering And Design
Construction 2024
The Portland Bureau of Transportation (PBOT) will construct improvements on key pedestrian and bicycle routes in the Jade District and Montavilla neighborhood, connecting various neighborhood hubs in Southeast Portland.
122nd Avenue Plan: Safety, Access, Transit
Transportation
In Planning
The122nd Avenue Plan identifies improvements to increase safety and improve access for all. Plan recommendations include changes to the street cross-section, additional enhanced crossings, lighting, signal changes, and more.
NE 97th Avenue and Couch/Davis Street Local Improvement District
Transportation
Engineering And Design
Fall 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.
SE Foster-Woodstock Couplet
Transportation
Engineering And Design
Construction 2024
This project comprises Phase Two of the Lents Town Center Improvements. It will address long-deferred roadway maintenance needs as well as provide safety improvements for all modes of transportation.
The Henry
Rental
Open
Summer 2020
The Henry in Downtown Portland is a 173-unit development owned by Central City Concern that serves some of the city’s most vulnerable residents.
在这个页面上看到我们可以改进的地方吗?给网站反馈。