Sự thi công
SE Stark & Washington Street Safety Project
Transportation
In Planning
–
A safety improvement project including travel lane reconfiguration, ADA upgrades, crossing enhancements, and enhanced bike lanes on Stark and Washington between 92nd and 106th. Design should occur in 2024 with construction in 2025-2026.
Water Main Flushing
Water Main Flushing
Active
Spring/Summer 2024
Hydrant flushing is how Portland cleans the inside of its drinking water pipes and maintains excellent drinking water quality.
Water Main Flushing - SW Portland
Water Main Flushing
Active
Summer/Fall 2024
Hydrant flushing is how Portland cleans the interior of its drinking water pipes to maintain excellent drinking water quality.
Water Main Flushing - SE Portland
Water Main Flushing
Active
Spring/Summer 2024
Hydrant flushing is how Portland cleans the interior of its drinking water pipes to maintain excellent drinking water quality.
Old Town Skatepark Project
Parks
In Planning
Anticipated completion: Fall 2029
The future Old Town Skatepark will be the signature skate facility in the Portland Parks & Recreation system, and is expected to boost Downtown Portland recreation opportunities, and strengthen the local economy.
Water Main Flushing
Water Main Flushing
Active
Spring and Summer 2024
Hydrant flushing is how Portland cleans the inside of its drinking water pipes and maintains excellent drinking water quality.
Foster Rd & 111th: Crossing & Signal, SE
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on SE Foster Road at 111th Avenue/Drive.
NW Thurman Street Bridge Project Painting
Transportation
Upcoming
Complete Fall 2024
Given its age and condition, the Balch Gulch Bridge was in critical need of modernization and rehabilitation. Uneven wooden sidewalks caused pedestrians to trip and slip during soggy Portland days.
Jamii Court
Rental
In Planning
Summer 2026
Community Partners for Affordable Housing (CPAH) will redevelop the Portland Value Inn, located in the West Portland Park neighborhood, to create a 96-unit multifamily redevelopment targeting families.
NE Killingsworth Street Lighting
Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on NE Killingsworth Street from 42nd to NE Lombard Street.
NE 131st Place and Prescott Drive: Traffic Calming and Placemaking
Transportation
Engineering And Design
Summer 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of traffic calming speed bumps on NE 131st Place between NE Shaver and Prescott Drive and a traffic circle at the intersection of Prescott Drive. Community-inspired street paintings will be installed along the project area.
Beech Trunk Sewer Project
Sewer and Stormwater
Active
Construction is expected to start in Summer, 2024
Environmental Services is designing a project to repair large-diameter trunk sewer pipes near Interstate-5 and N Interstate Ave. This project will reduce the risks of basement sewer backups, flooding, and emergency repairs in the future.
SW 45th Flower Pl. to Vermont St. Pavement Project
Transportation
Engineering And Design
Construction from August 2024 to December 2024
PBOT will place new Aspalt Concrete along SW 4th. Ave. from SW Vermont St. to SW Cameron Rd. This project will also include new pedestrian crossings, multi-use paths, ADA Ramps, roadway striping and new sidewalks.
NE Glisan Street and 80th Avenue Crossing Improvements
Transportation
Engineering And Design
In Design - 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make pedestrian crossing improvements at NE Glisan Street and 80th Avenue.
N Willis Sidewalk Infill: N Newman Avenue to Chautauqua Boulevard
Transportation
Engineering And Design
Construction expected in 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of new concrete sidewalk and ADA curb ramps on the south side of N Willis Boulevard between N Newman Avenue and N Chautauqua Boulevard, an essential connection for students, families and neighbors in the Portsmouth neighborhood.
NW Johnson & Kearney Street Extension Project
Transportation
Engineering And Design
–
A project building new streets which extend NW Kearney and NW Johnson Streets through the USPS Redevelopment site.
Portland Safety Projects - All Roads Transportation Safety
Transportation
Engineering And Design
Construction begins Fall 2024
This project will design and construct traffic signal safety improvements at locations along SE Holgate Blvd, SE Milwaukie Ave, SE Division St, SE Foster Rd., Sandy Blvd., W. Burnside, NW Glisan St., NE Glisan St., SW Beaverton Hillsdale Highway, Broadway/Weidler, SE 102nd, Broadway St.
N Winchell and Watts St. Sewer Extension Project
Sewer and Stormwater
Active
The project is in the design phase. Construction is expected to begin in April 2025.
Bureau of Environmental Services (BES) is designing a project to extend the public sewer system in N Winchell and N Watts Streets east of Fenwick Avenue. This work is part of the City’s ongoing effort to provide a way to directly and independently connect to the public sewer system.
Carey Boulevard
Home Ownership
In Planning
Spring 2029
Habitat for Humanity will develop 50 newly constructed homes in the University Park neighborhood, intended for home ownership to N/NE Preference Policy homebuyers.
Bạn thấy điều gì đó mà chúng tôi có thể cải thiện trên trang này? Cung cấp phản hồi cho trang web .