important alert
State closes I-5 southbound at Rose Quarter for 5 weeks starting Sept. 11

Plan for major delays. More at i5rosequarter.org. Visit Shift Your Trip to keep Portland moving.

informational alert
Portland is a Sanctuary City

Completed construction

Safe Routes to School Construction menu
18 projects found

NE Glisan Street and 80th Avenue Crossing Improvements

Label: Transportation
Label: Completed
Construction completed 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make pedestrian crossing improvements at NE Glisan Street and 80th Avenue.

SE Cooper Street and SE 62nd Avenue Safe Routes to School Project

Label: Transportation
Label: Engineering and design
Construction to be complete by summer 2026
This project will fill the existing sidewalk gap on the north side of SE Cooper Street, pave SE Cooper Street from SE 62nd Avenue to existing pavement, install a new sedimentation-sump maintenance hole, and install 3 new curb ramps.
Project to be constructed in late winter/spring 2026
This project will update all curb ramps at the intersection, build a new island on the east side of 74th Ave, stripe two crosswalks on NE Sandy Blvd, and install a Rapid Flashing Beacon.

Filters

Filter by neighborhood

Filter by year complete

Back to top