Construction
Signalized School Route Crossings
Transportation
Upcoming
Construction begins Spring 2023
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
SE 92nd and Lincoln Crossing Improvements
Transportation
Engineering And Design
Winter 2022 - Spring 2023
As part of the SE 92nd and Lincoln intersection project, PBOT crews will improve pedestrian access and visibility for people crossing. They will also separate bicycle travel lanes from automobile travel lanes through the intersection.
NE 113th Ave Sidewalk Project: NE Couch Ct to Glisan St
Transportation
Engineering And Design
Spring 2023
PBOT construction crews will fill sidewalk gaps and build or upgrade corners and curb ramps to improve walking access between NE Couch Ct and NE Glisan along 113th Avenue.

Intersection Improvement Projects: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.

SE 174th Ave Sidewalk Infill: SE Main to Stark St
Transportation
Engineering And Design
Summer 2023
Construction crews will build a 10-foot concrete sidewalk with space for people walking and biking on the west side of SE 174th Ave between SE Stark St and Main St. New curb ramps and marked crosswalks will be installed, and street trees planted between the sidewalk and street.

NE Shaver Sidewalk Project: NE 115th to Parkrose Middle School
Transportation
Upcoming
Construction expected Summer 2023
Once designs are complete, contractors will build sidewalk on the south side of NE Shaver between NE 115th Avenue and Parkrose Middle School campus.

SW 35th Ave Sidewalk Infill and Crossing Project
Transportation
Engineering And Design
Summer 2023
PBOT crews will fill sidewalk gaps and improve pedestrian access at two locations along SW 35th Ave.

N Willis Sidewalk Project: N Newman to Chautauqua Blvd
Transportation
Engineering And Design
Construction expected Summer/Fall 2023
Once designs are complete, contractors will build new sidewalk and ADA curb ramps on the south side of N Willis Blvd between N Newman Ave and N Chautauqua Blvd, an essential connection for students, families and neighbors in the Portsmouth neighborhood.

SE 117th Ave Traffic Calming Project
Transportation
Engineering And Design
Summer 2023
Construction crews will install traffic calming speed bumps on SE 117th Ave between E Burnside St and SE Market St in the Mill Park and Hazelwood neighborhoods.

See something we could improve on this page? Give website feedback.