The Portland Bureau of Transportation is constructing the Blumenauer Bridge (originally called Sullivan's Crossing) to serve as a vital connection for pedestrians and people biking between two of Portland’s fastest growing neighborhoods—Lloyd and the Central Eastside—and beyond.

Construction 2019-2021
On this Page

What’s happening now?

Construction began in December 2019. 

During construction, the contractor will construct a bridge foundation on the south edge of Sullivan’s Gulch and two foundations on the north side. A temporary tower will be constructed between the I-84 freeway and railroad tracks to aid with erecting the bridge. The bridge itself will be assembled on NE Seventh Avenue at Flanders Street on the south side of the freeway. 

In November 2020, the bridge will be moved into place across the freeway and onto the temporary tower. This installation will require a full closure of I-84 in both directions for one weekend. Following this, crews will connect the bridge to the north landing. 

The news page below will be updated as information becomes available.

Construction news and project updates

Project Background

The Blumenauer Bridge will serve as a vital connection for pedestrians and people biking between two of Portland’s fastest growing neighborhoods—Lloyd and the Central Eastside—and beyond. In the future it will also serve as an important link in Portland’s Green Loop.

This new bridge will be 475-feet long and 24-feet wide, spanning over seven lanes of I-84 traffic, two active railroad lines, and Sullivan’s Gulch. The completed bridge will have a 10-foot wide pedestrian path and a 14-foot wide path for two-way bicycle traffic. 

The bridge will be seismically resilient and serve as a backup route for emergency vehicles over I-84 in the event of an earthquake. In addition to the bridge, the project includes two new public plazas and landings on the north and south sides of the bridge.

The bridge will be located along the NE 7th Avenue alignment to best serve the geographic centers of both districts, link to existing and planned bike routes, and reduce conflicts with truck traffic. The nearest existing connections, on NE Grand Avenue and NE 12th Avenue, are substandard for pedestrian and bicycle use and have significant conflicts with freight and automobile traffic.

Blumenauer Bridge Rendering from the Lloyd District

Originally called “Sullivan’s Crossing” during its design and development, the bridge was officially named the Congressman Earl Blumenauer Bicycle and Pedestrian Bridge by Transportation Commissioner Chloe Eudaly in May 2019 to honor the congressman’s steadfast, decades-long advocacy for cycling and pedestrian issues in Portland and across the country. 

Project Funding

The estimated construction cost is $13.7 million. Funding for the project comes from the Oregon Convention Center Urban Renewal Area and from Transportation System Development Charges (TSDCs), which are fees paid by development to mitigate the impact of new users of the transportation system.

Other funding sources include a commitment from the nonprofit transportation management association Go Lloyd and the Central Eastside Industrial Council.

In January 2019, PBOT retained HP Civil Inc., an Oregon-based construction company, as general contractor for the project. The project includes 32% participation from Disadvantaged, Minority-Owned, Women-Owned, Emerging Small Businesses, or Service Disabled Veterans Business Enterprises (D/M/W/ESB/SDVBE) including an equity partner, West Side Iron, a minority-owned Oregon business responsible for delivering and assembling the bridge structure.