Construction
Under construction
Construction of Phase 2 -in Summer 2020
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
Construction
Completed
Complete June 2018
The Portland Bureau of Transportation (PBOT) closed critical gaps in sidewalks along SE Flavel Street, NE 102nd Avenue, and SE 112th Avenue and added 16 new ADA-compliant curb ramps. The project was funded by the FIxing Our Streets gas tax.
Construction
Engineering and design
Construction planned for late 2020
This Local Improvement District (LID) will make street, sidewalk and stormwater improvements to SE 102nd Avenue and to SE Woodstock Boulevard.
Construction
Completed
Completed June 2018
The Portland Bureau of Transportation (PBOT) constructed new sidewalks on SE 112th to improve walking connections along a large north-south corridor and connect destinations like Kelly Butte Natural Area, Floyd Light Middle School, and Mall 205.
Construction
Completed
Complete 2016
The Portland Bureau of Transportation (PBOT) built a replacement bridge after the 122nd Avenue Bridge was damaged by heavy rains during winter storms in December 2015.
Construction
Completed
Complete 2016
The Portland Bureau of Transportation (PBOT) installed three new rapid flashing beacon crossings and filled in sidewalk gaps in areas along 122nd Avenue between SE Foster Road and NE Sandy Boulevard to improve safety for travelers.
Construction
In planning
Construction will begin in 2021
The Portland Bureau of Transportation (PBOT) will construct signalized crossings at SE Davis Street and SE Clinton Street on SE 122nd Avenue.
Construction
Under construction
Construction summer 2020 - summer 2021
The Portland Bureau of Transportation (PBOT) is paving the street and constructing new sidewalks, protected bike lanes, and street lighting on SE 136th Avenue between SE Division Street and SE Foster Road.
Construction
Engineering and design
Construction planned for Spring 2021
The Portland Bureau of Transportation (PBOT) will be improving safety for people walking, taking transit, biking, and driving on SE 162nd Ave between SE Stark/Alder St and SE Powell Blvd. The safe crossings are being constructed as part of a partnership between TriMet and the City of Portland.
Construction
Closeout
Complete Spring 2020
This project reconnected the Slabtown neighborhood and NW Portland by extending NW 20th Avenue and NW Thurman Street. This created a new intersection and a new, more efficient route for drivers and pedestrians in this growing area.
Construction
Engineering and design
Construction Spring 2021
The Portland Bureau of Transportation (PBOT) is constructing bike lanes on SW 35th Avenue by reorganizing the road. The project is funded by Fixing Our Streets and is identified in the Southwest in Motion plan.
Construction
Engineering and design
Construction Fall-Winter 2021
The Portland Bureau of Transportation is constructing a new earthquake-ready bridge to fill the gap between the Holman Neighborhood Greenway and the upcoming 47th Ave protected bikeway, while providing better access for freight, walking, and biking.
Construction
Completed
Construction January 2019 to June 2020
The Portland Bureau of Transportation (PBOT) repaved, improved speed deterrence systems, and updated curb ramps along NE 42nd Avenue between NE Wistaria Drive and NE Knott Street.
Construction
Completed
Complete 2019
The Portland Bureau of Transportation (PBOT) reorganized the road to provide a bike lane between the Hayhurst neighborhood and the Southwest Community Center, Gabriel Park, and SW Vermont bike lanes. The project was funded by Fixing Our Streets.
Construction
Under construction
Construction Fall 2019 to Fall 2020
NE 47th Avenue from north of Columbia Boulevard to south of Cornfoot Road was one of Portland’s most deteriorated road segments. The Portland Bureau of Transportation (PBOT) is completely reconstructing the road, adding multiuse paths on both sides of the street for pedestrians and people biking.
Construction
Engineering and design
Construction in 2020
This Local Improvement District (LID) project includes improvements to SW 47th Avenue from SW Luradel Street north to the deadend.
Construction
Engineering and design
Construction 2020
The Cully segment of the 50s Greenway (part of Cully north/south connections) will improve walking and biking conditions between NE Mason Street and NE Portland Highway.
Construction
Completed
Complete November 2018
The Portland Bureau of Transportation paved SE 50th Avenue from SE Division to SE Hawthorne streets. All corners that did not meet ADA standards were updated. These two actions will prevent further pavement deterioration and will improve overall street accessibility.
Construction
Engineering and design
Construction Spring 2021 (tentative)
This project will install a new traffic signal on SE 52nd Avenue at SE Woodstock Street.
Construction
Engineering and design
Construction Fall 2020
The Portland Bureau of Transportation (PBOT) will make improvements to NE 55th and NE 57th Avenues and NE Killingsworth Street through this Local Improvement District.