On July 1, 2025, Portland’s Bureau of Transportation will implement a revised rate schedule for various right-of-way use and construction permits. 

Among the permits slated for rate adjustments are those for utility construction and vertical infrastructure (VI) in the public right-of-way. The following are the fees (full City cost recovery) for the fiscal year 2025-2026: 

 

Main Line, Duct, Conduit, Subway, property service laterals, etc.  Sewer Connection more than 100 feet in length; lineal foot  

$7.22 per ln ft.  

$722.00 min.  

Property Service or Lateral (2” or less) not constructed in conjunction with above and plan review not required. (Does not include large meter vaults, hydrants or mainline work).  Each  

  

$401.00 per connection  

Miscellaneous Utility Excavations Per square foot 

$7.22 per sq. ft.  

$722.00 min.  

Excavation for construction of utility vaults & manhole chambers  Each  $2,887.00 ea.  
Pole or Private street light – placement, replacement, relocation, or removal  Each  $502.00 ea.  
 Above-Ground Unit (AGU)  Large Above Ground Equipment (i.e. Temporary Pad Mount Transformer)  

  

$2,887.00 ea.  

Above Ground Structures (AGS)  Small above ground equipment (i.e. gas meters, blow-off assembly, Water Quality Sampling Stations, etc.)  

  

$722.00 ea.  

Test Boring (TB) & Pavement Test Coring  Each (Any number per 100 lineal feet)  $657.24 ea.  
Monitoring Well (MW) Installation  Each  $657.24 ea.  
Underground Storage Tank (UST) Removal  Each  $1015.00 ea.  
Sewer Maintenance Cuts  Each  $161.00 ea.  
Utility Locate of City Assets (SSL)  Each (per 100 linear feet of length)    $143.80 ea.  
Surface Stormwater Facility  Each location  $2,673.09 ea.  
Cabinet  Each Unit  $1,336.55 ea.  
EV Charger – Pole Mounted  Each Unit  $2,124.81 
EV Charger – Ground Mounted  Each Unit  $2,458.95 
  Insurance Processing Fee  Fee associated with Environmental Assessment program (MW/TB/UST). Not applicable to Street Opening Permits  $54.00  
Bond Processing Fee Fee associated with Environmental Assessment program (MW/TB/UST). Not applicable to Street Opening Permits  $54.00 
Permit Cancellation Inspection  Fee associated with the inspection of a cancelled permit  $219.17 
ADA Design & Inspection (ADI)  Fee associated with the design review and inspection of ramp infrastructure.  $2,027.93 ea.  
Site Walk (VI)  Each  $2,615.65 ea.  
Make-Ready Pre-Design Meeting (VI)  Each  $1,763.72 ea.  
Application Fee (VI)  Each  $400.00 ea.  
Pole Reservation – City Asset (VI)  Each  $2,000.00 ea.  
Wireless Cell Site – Small Cell or Macro (VI)  Each  $4,009.64 ea.  
Make-Ready Review (VI)  Deposit; billed hourly at cost  $10,000.00 deposit  
Make-Ready Inspection (VI)  Hourly  Varies 