Updated Utility Management fee updates for fiscal year 2024-2025

Label: News article
Published
Updated

On July 1, 2024, Portland’s Bureau of Transportation will implement a revised rate schedule for various right-of-way use and construction permits issued by Right-of-Way Management and Services. 

Among the permits slated for rate adjustments are those for utility construction and vertical infrastructure (VI) in the public right-of-way. The following are the fees (full City cost recovery) for the fiscal year 2024-2025: 

Permit TypeDescriptionFee

Main Line, Duct, Conduit, Subway, property service laterals, etc. 

Sewer Connection more than 100 feet in length; lineal foot 

$7.39 per ln ft. 

$739.00 min. 

Property Service or Lateral (2” or less) not constructed in conjunction with above and plan review not required. (Does not include large meter vaults, hydrants or mainline work). 

 

 

Each 

 

$411.00 per connection 

Miscellaneous Utility Excavations 

Per square foot 

$7.39 per sq. ft. 

$739.00 min. 

Excavation for construction of utility vaults & manhole chambers 

Each 

$2,953.00 ea. 

Pole or Private street light – placement, replacement, relocation, or removal 

Each 

$513.00 ea. 

 

 

Above-Ground Unit (AGU) 

Large Above Ground Equipment (i.e. Temporary Pad Mount Transformer) 

 

 

$2,953.00 ea. 

 

 

Above Ground Structures (AGS) 

Small above ground equipment (i.e. gas meters, blow-off assembly, Water Quality Sampling Stations, etc.) 

 

 

$739.00 ea. 

Test Boring (TB) & Pavement Test Coring 

Each (Any number per 100 lineal feet) 

$739.00 ea. 

Monitoring Well (MW) Installation 

Each 

$739.00 ea. 

Underground Storage Tank (UST) Removal 

Each 

$1088.00 ea. 

Sewer Maintenance Cuts 

Each 

$141.00 ea. 

 

Utility Locate of City Assets (SSL) 

Each (per 100 linear feet of length) 

 

$140.40 ea. 

Surface Stormwater Facility 

Each location 

$1106.49 ea. 

Cabinet 

Each Unit 

$1,367.06 ea. 

EV Charger – Pole Mounted 

Each Unit 

$1,841.97 

EV Charger – Ground Mounted 

Each Unit 

$2,183.73 

 

Insurance & Bond Processing Fee 

Fee associated with Environmental Assessment program (MW/TB/UST). Not applicable to Street Opening Permits 

$55.00

 

ADA Design & Inspection (ADI) 

Fee associated with the design review and inspection of ramp infrastructure. 

 

$1841.93 ea. 

Site Walk (VI) 

Each 

$1,500.00 ea. 

Make-Ready Pre-Design Meeting (VI) 

Each 

$1,500.00 ea. 

Application Fee (VI) 

Each 

$400.00 ea. 

Coordination Fee (VI) 

Each 

$500.00 ea. 

Pole Reservation – City Asset (VI) 

Each 

$2,000.00 ea. 

Wireless Cell Site – Small Cell or Macro (VI) 

Each 

$2,000.00 ea. 

Make-Ready Review (VI) 

Deposit; billed hourly at cost 

$10,000.00 deposit 

Make-Ready Inspection (VI) 

Hourly 

Varies 

Thank you, 

Kalise Rucker

Utility Management

pbotutilitypermits@portlandoreg…