information
Remember to vote

Voice your opinions by Tuesday, Nov. 3. Get information about voting in Multnomah, Clackamas or Washington counties.

Insurance and bond requirements for permits in the public right-of-way

This section covers Portland Bureau of Transportation's (PBOT) insurance and bond requirements for temporary street-use permits, street-opening permits, sewer connection permits, minor construction, sidewalk cafes and vending, community events, and utility installation in the public right-of-way.

On this page

Insurance and bond documents are processed by the Utility, Construction & Inspection Insurance & Bond Group, and must be approved by the city attorney prior to issuance of any permits.  Please see below for general requirements and sample additional insured endorsements.

Please allow 5-7 business days for processing once documents meeting requirements are received.


Insurance requirements for street and sidewalk use permits: The City of Portland requires the a certificate of liability insurance AND an additional insured endorsement for Street and Sidewalk Use Permits. The certificate and endorsement must be approved by the City Attorney before a permit can be issued. Please allow 5-7 business days for processing. Documents that contain missing or incorrect information will require a longer processing period.

1. A Standard certificate of liability insurance: The insurance certificate is intended to protect the city from any liability it may incur as a result of granting the requested permit. Certificate shall contain the following:

  • City of Portland – Utilities, Construction & Inspection (UCI) named as the Certificate Holder:

     City of Portland
     Portland Bureau of Transportation
     Attn: UCI        
     1120 SW 5th Ave – Suite 1331
     Portland OR 97204
  • Minimum coverage requirements for liability insurance:
    • Per Occurrence coverage not less than $1,000,000 (one million dollars) per occurrence.
    • General Aggregate coverage not less than $2,000,000 (two million dollars).
  • In the “DESCRIPTION OF OPERATIONS...” section of the certificate:
    • Indicate the type of permit requested (Healthy Businesses, Street/Lane/Sidewalk Closure, Street Opening, Sewer Connection, Banner, Sidewalk Café, Vending Cart, Community Event, Block Party, etc).
    • If the insured requests permits for varying locations and dates, indicate “All Operations”. Do not list each permitted location/date. If you do, a new certificate and endorsement will be required for each permit. For sidewalk Cafes and Vending Carts, please list the premise location(s).
  • Notification of cancellation: The City of Portland requires 30 (thirty) days written notice from the insurance company prior to cancellation of the policy.

2. An additional insured endorsement form: The City of Portland accepts endorsements referring to permits and state or political subdivisions


Insurance documents (PDF Format)

Street opening bond documents (PDF Format)