Documents
Displaying 61 - 80 of 512
Printable Information
Details about why PBOT removed the traffic signal at N Lombard Street and N Philadelphia Ave.
Posted
Printable Information
PBOT’s “SW Capitol Highway Rose Lane Project: Initial Traffic Monitoring Data Report” documents three-month post-construction traffic monitoring data for the pilot project, which was designed to help buses bypass traffic congestion on SW Capitol Highway.
Posted
Concept design depicting intersection improvement at SE 52nd Avenue and SE Center and Gladstone Streets.
Posted
Printable Information
Posted
Printable Information
Posted
Printable Information
Posted
A complete list of streets receiving preservation treatment in 2023
Posted
Printable form
A map of the proposed Division-Midway improvements
Posted
Plan view showing signing, striping, and planter locations for median island at the intersection of NW 24th and Vaughn.
Posted
Posted
White rectangles identify the on-street parking on 162nd Ave between Stark to Powell
Posted
Printable Information
Posted
Printable Information
March 2023 draft concept design for the 82nd Avenue Critical Fixes: Major Maintenance Project.
Comments close
Posted
Printable Information
Posted
Printable Information
Posted
Presentation
Slides from presentation to the Beaumont Wilshire Neighborhood Association on February 13, 2023.
Posted
Download PDF fileSW Bertha Blvd.596.93 KB
Download PDF fileSW Bertha Blvd.596.93 KB
Posted
See something we could improve on this page? Give website feedback.