Lair Hill Neighborhood Traffic Access Management Project

Transportation
Engineering And Design
Implementation Test Winter 2019 to Summer 2020
This nine-month pilot project reduced cut-through traffic in the Lair Hill area south of downtown, keeping regional car traffic heading east on the Ross Island Bridge on safer routes. The project limited through-traffic on narrow residential streets from Dec. 16, 2019 through Sept. 1, 2020.

Cully Neighborhood Street Improvement Project

Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
Construction: Spring 2025
SW Galeburn Street Improvement Project will include paving gravel streets, installing stormwater facilities, and adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
Construction completed Spring 2024
The Portland Bureau of Transportation (PBOT) updated the street design of NE 148th Avenue from NE 146th Drive to NE Halsey Street. PBOT modified how space is allocated on NE 148th Avenue to reduce speeding and improve the street crossing at NE Sacramento Street.

SW Capitol Highway Street Lighting

Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on SW Capitol Highway and 49th from SW Barbur to Stephenson.

SE Holgate Blvd. Crossing Improvements

Transportation
Engineering And Design
Construction Summer 2024
PBOT will be making crossing improvements along SE Holgate Boulevard at 62nd, 87th, 115th and 125th.

SE Holgate Blvd. Crossings: 103rd, 108th & 112-117th

Transportation
Engineering And Design
Construction Fall 2023
PBOT will be making crossing improvements along SE Holgate Boulevard at SE 103rd and 108th Pl, and sidewalk infill along the south side of Holgate from 112th-117th.

NE 42nd Ave Infill: Killingsworth to Holman

Transportation
Engineering And Design
Construction late summer of fall of 2024
PBOT will be constructing sidewalks and ADA ramps on the east side of 42nd Avenue between NE Killingsworth Street and Holman Street.
Construction will begin in summer of 2024
The Portland Bureau of Transportation (PBOT) will build new crossings with signals along NE 122nd Avenue near the intersections with Davis and Clinton streets.

Flanders Connector at NW Naito and Glisan

Transportation
Engineering And Design
Project schedule under development
The Flanders Connector at NW Naito and Glisan seeks to provide a new crossing for pedestrians and people biking at Naito Parkway, connecting Waterfront Park to the Flanders Greenway.

Killingsworth Street Repaving and Safety Improvements

Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard