Construction

87 projects found
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.

70s Greenway: Cully Connector

Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.