Construction
NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2025
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.
Brentwood-Darlington Multimodal Improvements
Transportation
Under Construction
Construction 2024-2025
A Portland Bureau of Transportation (PBOT) project improving access to several Title 1 schools. Includes new sidewalks and crosswalks on SE Duke and Flavel streets, a neighborhood greenway on Knapp/Ogden streets, and a new signalized crossing of SE 82nd Avenue.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
NE 60th Avenue and Halsey Street Area Improvement Project
Transportation
Engineering And Design
Construction late 2024
Crews and contractors with the Portland Bureau of Transportation (PBOT) will repave, add traffic signals and turn lanes, widen sidewalks, and build bike improvements along NE 60th Avenue and Halsey Street. This will improve traffic flow and make it safer for pedestrians and people biking or driving.
70s Greenway: Cully Connector
Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
NE 97th Avenue and Couch/Davis Street Local Improvement District
Transportation
Engineering And Design
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.
Cully Neighborhood Street Improvement Project
Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
Tryon-Stephens Neighborhood Street Improvement Project- SW Capitol Hill Rd
Transportation
Engineering And Design
Construction: Late Winter/Early Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland as part of SW Tryon Stephens Transportation Infrastructure Charge (LTIC) by paving gravel streets, adding sidewalks or walkways, or a combination.
SW Galeburn: SW Capitol Highway to SW 41st Ave Street Improvement Project
Transportation
Engineering And Design
Construction: Spring 2025
SW Galeburn Street Improvement Project will include paving gravel streets, installing stormwater facilities, and adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
NE 46th Avenue & Bryant Street Local Improvement District
Transportation
Partially Open While Under Construction
2024-25
The Portland Bureau of Transportation (PBOT) is constructing Local Improvement District street improvements on NE 42nd Avenue, 46th Avenue, & Bryant Street. Phase 1 includes a new traffic signal, curb ramps, crosswalks, sidewalks, street lighting, and trees. Phase 2 includes additional improvements.
W Burnside Street at St. Clair Avenue Pedestrian Crossing
Transportation
Engineering And Design
Spring 2025
This project will add a pedestrian crossing with a signal on W Burnside Street at St. Clair Avenue.
Safer intersections for pedestrians
Transportation
Engineering And Design
Fall 2022 to 2025
Work by the Portland Bureau of Transportation (PBOT) that improves pedestrian safety at intersections with traffic signals. Project work funded through the voter-approved 10-cent gas tax known as Fixing Our Streets.
NW Reed Drive Local Improvement District
Transportation
Engineering And Design
Summer 2024
This Local Improvement District (LID) will construct street improvements on NW Reed Drive west of NW 83rd Place to the western terminus of the right-of-way.
Brentwood-Darlington Crossroads Safety Project: SE Flavel Street at SE 72nd Avenue
Transportation
Engineering And Design
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.
NE Killingsworth Safer Crossings Project
Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.
NE Shaver Sidewalk Infill: NE 102nd to NE 115th avenues
Transportation
In Planning
Summer 2025
Construction crews will build sidewalk and new ADA curb ramps on the south side of NE Shaver Street to connect this key school route for Parkrose Middle and High School students.
Rosa Parks & Greeley: Crossing & Signal, N
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.
SW Broadway Bike Improvements Project
Transportation
Under Construction
Concrete platforms under construction - February 2024
The Portland Bureau of Transportation brought a host of improvements to SW Broadway in 2022, making it safer for all travelers. Additional improvements are coming to this high crash corridor in 2024.
Foster Rd & 111th: Crossing & Signal, SE
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on SE Foster Road at 111th Avenue/Drive.
Portland Safety Projects - All Roads Transportation Safety
Transportation
Engineering And Design
Construction begins Fall 2024
This project will design and construct traffic signal safety improvements at locations along SE Holgate Blvd, SE Milwaukie Ave, SE Division St, SE Foster Rd., Sandy Blvd., W. Burnside, NW Glisan St., NE Glisan St., SW Beaverton Hillsdale Highway, Broadway/Weidler, SE 102nd, Broadway St.