Red Electric Trail Project

Construction type
Transportation
Project status
Engineering and design

The Portland Bureau of Transportation is constructing a pedestrian and bicycle bridge between Beaverton-Hillsdale Highway and SW Capitol Highway, a critical segment of the Red Electric Trail system,

Construction Late 2020/Early 2021
On this Page

What’s happening now? 

The project was advertised for construction on September 28, 2020. Bids will be opened in late October. Construction is planned to begin in early 2021.

Project Background

This segment will include a 10-foot wide trail from the intersection of SW Bertha Boulevard and Beaverton-Hillsdale Highway, travelling south over a ravine on a 12-foot-wide bridge where it will intersect with SW Capitol Highway.

Project Components

Additional project elements include:

  • Lighting
  • Guardrail work along Beaverton-Hillsdale Highway
  • Sidewalk curb ramps
  • Pedestrian and bicycle crosswalk striping
  • Grading and drainage
  • Retaining walls
  • Vegetated stormwater facility
  • Tree mitigation plantings
  • Restoration plantings

Sign up for email updates

Get the latest updates on this project.

Contact

Neighborhood

News and notices

Published

Red Electric Bridge Schedule Update