Neighborhood Greenway Gateways

Label: Transportation
Label: Engineering and design
PBOT is replacing temporary traffic calming installations with permanent infrastructure. Improvements may include poured concrete islands, speed bumps, pavement markings, and signage and will vary depending on intersection conditions and engineering analysis.
Construction expected in Winter 2027
Location description
Multiple intersections

Project Description

Installing permanent improvements at the following neighborhood greenway intersections  

  • NE 112th Street & NE Fremont Court
    • Poured concrete islands and pavement markings
  • NE 92nd Avenue & NE Tillamook Street
    • Poured concrete islands and pavement markings
  • NE 52nd Avenue & NE Alberta Street
    • Poured concrete islands
  • SW Illinois Street & SW 45th Avenue 
    • Poured concrete islands and pavement markings
  • NE 53rd Avenue & NE Irving Street
    • Poured concrete islands
  • N Concord Avenue & N Killingsworth Street
    • Poured concrete islands

Completed improvements:

  • SE Salmon Street at 11th Avenue, 12th Avenue, SE 20th and 30th Avenue 
    • SE 11th Avenue: crosswalks and cross bikes
    • SE 12th Avenue: crosswalks and cross bikes, concrete separators
    • SE 20th Avenue: parking setback, left-turn calming rubber bumps
    • SE 30th Avenue: crosswalks, cross bikes, and parking setbacks. Installing speed bumps on SE 30th Avenue in each direction of SE Salmon Street.

Project Goals

  • Replace temporary infrastructure with more resilient permanent materials.
  • Increase awareness for people entering a neighborhood greenway from a busier street.
  • Improve crossing opportunities for people walking and rolling on select neighborhood greenways.

What's Happening Now

Updated 11/10/26

  • Final designs for remaining locations have been signed and PBOT is working to procure a contractor. Concept designs are shown below. 
  • Onboarding contractor to install additional speed cushions on SE 30th between SE Belmont and SE Hawthorne to support safer operations of the SE Salmon neighborhood greenway crossing.
  • Left turn calming devices on SE Salmon at the SE 30th and SE 20th intersections are awaiting construction by PBOT Maintenance Operations staff.

NE 112th Street and & NE Fremont Court Preliminary Design

NE 92nd Avenue & NE Tillamook Street Preliminary Design

NE 52nd Avenue & NE Alberta Street Preliminary Design

SW Illinois Street at SW 45th Avenue

NE 53rd Avenue & NE Irving Street Preliminary Design

N Concord Avenue & Killingsworth Street Draft Concept

Design example of three concrete median islands planned for the N Concord and Killingsworth crossing. The middle island will be 18 x 6 feet. The two exterior islands will be 3 x 6 feet. Yellow reflective vertical markers will be placed on the edges for visibility.

Project Background

From 2020 to 2024, PBOT's "Slow Streets" program adding temporary traffic calming infrastructure along the neighborhood greenway network. The Fixing Our Streets program includes funding to replace temporary materials with permanent infrastructure. 

Temporary infrastructure at SE 12th Ave and SE Salmon Street. At this location, permanent improvements include concrete traffic separators, marked crosswalks, cross bikes and parking visibility setbacks.

Project Timeline

Summer 2025: Design

Fall 2025:  Public Outreach - Letters sent to residents, businesses, and property owners in vicinity of improvements

Fall 2025:  Construction SE Salmon Street at SE 11th, 12th, and 20th, and 30th Avenues 

Fall 2026/Winter 2027: Construction at remaining locations


Public Outreach and Involvement

Fall/Winter 2025


Project Funding

This project is funded by the Fixing Our Streets program.

Map

SE Salmon Street at 11th Avenue, 12th Avenue, SE 20th and 30th Avenue
NE 112th Street and & NE Fremont Court
NE 92nd Avenue & NE Tillamook Street
SE 52nd Avenue & SE Alberta Street
SW Illinois Street at SW 45th Avenue
NE 53rd Avenue & NE Irving Street
Back to top