NE Halsey Street (80th to 92nd avenues) - Safety and Access to Transit Project

Label: Transportation
Label: Under construction
The Portland Bureau of Transportation (PBOT) is improving safety and access along NE Halsey Street from NE 80th to NE 92nd avenues. We'll add new sidewalks, upgraded crossings, bike lanes, improved curb ramps and more. These changes will make it easier and safer for everyone to travel on NE Halsey.
Construction July 2025 - October 2026

 

What's Happening Now?

  • NE 88th and Halsey rapid flashing beacon activation 
    PBOT is currently waiting for the utility provider to energize the new rapid‑flashing beacon crossing. This process can take several weeks to months, and PBOT has very limited control over the timeline.
  • NE Halsey 84th to 91st Avenues Ongoing street signage, fence construction, and final planting. 
  • NE Halsey overpass over I‑84 protective fencing October 2026 (not yet scheduled). Will require temporary lane closures. Will take place after ODOT's I-5 Rose Quarter Improvement Project closure work is complete. 

View the construction schedule

Improvements at a Glance

  • New sidewalks with 20+ trees on the north side of NE Halsey Street between 85th and 92nd avenues.
  • Two-way bike lanes on the south side of NE Halsey Street between Jonesmore Street and 92nd Avenue, allowing people to ride in both directions on one side of the street, with concrete protection separating bikes from car traffic to improve rider safety.
  • Mini roundabout small, circular intersection at NE 81st Avenue will slow vehicle speeds without stopping the flow of traffic.
  • Crossings to help people walking get to places of interest more safely.

NE Halsey at NE Jonesmore Street area

At NE Halsey and NE Jonesmore, a new traffic signal and intersection configuration will allow for more places to cross the street, a new two-way bicycle facility, and improved safety for all travelers.

NE Halsey and NE 81st area

A mountable roundabout at NE Halsey and NE 81st will promote safer vehicle speeds without impacting travel time, and connect NE Halsey between NE 81st and NE 84th by bike lane for the first time.

Why a mini-roundabout?  

The mini-roundabout at NE 80th Avenue and NE Halsey Street will help calm traffic and make it easier for everyone to move safely through the intersection. Did you know that mini-roundabouts…

  • Reduce crashes and improve safety by lowering vehicle speeds and cutting the number of conflict points.
  • Improve traffic flow and reduce delays compared to traditional stop signs or traffic lights.
  • Lower maintenance and energy costs since roundabouts don't rely on traffic signals or electrical equipment.
  • Are designed to accommodate large vehicles, such as TriMet buses, allowing them to safely drive over the center island curb when turning through the intersection.

Background and Project Funding

The goal of this project is to make it easier and safer for people to walk, bike and roll to and from the NE 82nd Avenue MAX Station. The project is the result of the 2009 Eastside MAX Station Area Communities Report and the 2016 Growing Transit Communities Plan. Between 2017 and 2021, NE Halsey Street was among Portland's deadliest corridors for traffic crashes and is now part of the city's High Crash Network. 

View the project's Public Feedback Summary:

The total budget for this project is $7.7 million dollars. Sources include a Metro/Federal Regional Flexible Fund grant ($2.4 million), a federal American Rescue Plan Act grant ($2.58 million), a federal earmark grant ($1 million), an additional Metro grant ($900,000), ODOT bridge funds ($412,000), PBOT General Transportation Revenue ($180,000), Fixing Our Streets ($250,000). 

Sign up for email updates

Sign up for email updates

View past project news updates sent by email

Map

Project is in construction on NE Halsey between NE 80th and NE 92nd avenues.