Brentwood-Darlington Mutlimodal Improvements

Construction type
Transportation
Project status
Engineering and design

This project will provide safe routes to several Title 1 schools and access to transit in a neighborhood with very poor sidewalk coverage by adding sidewalk and constructing a greenway.

Construction planned for 2022
On this Page

What’s happening now?

This project is currently in design.

Project Components

Sidewalk infill will be constructed on both sides of SE Duke St from 52nd to 82nd Aves and on both sides of SE Flavel St from 52nd to 82nd Aves.

A low-stress neighborhood greenway with traffic calming, wayfinding, and improved crossings (including at 82nd Ave) will be constructed on Knapp and Ogden Streets from 52nd to 87th, connecting the 50s and 80s Neighborhood Greenways.

Download the project map here:

Sign up for email updates

Get the latest updates on this project

Project Funding

$5,350,000