Overview
Throughout the year, Portland Bureau of Transportation (PBOT) crews and contractors handle all types of basic road maintenance projects to preserve pavement conditions, so it lasts longer. These are projects bigger than a single pothole or utility cut, and not part of any capital improvement project.
Typical schedule
- January – April: Gravel Street service, some base repair
- April – September: Grind-and-pave work, base repair
- May – September: Sealing work such as micro-surfacing, slurry seal, crack seal etc.
- October – December: Gravel Street service, base repairs
Timing
Much of this work is weather-dependent and scheduled 1-2 months in advance based on numerous factors including road conditions and crew availability. Projects typically take anywhere from half a day to a full work week. Typical hours of work are 6 a.m. - 4 p.m.
What to expect
As with all construction projects, expect some dust and noise from heavy equipment, as well as minor disruptions to traffic.
Obey work zones
Always travel cautiously around work zones, observe all lane closures and directions by reader boards and flaggers. Expect 20-minute delays and detour. Use alternate routes if possible.
November 2026
- NE Prescott Street (from 501 feet east of 92nd Avenue to 102nd Avenue). Grind and repave. Scheduled October 19, 2026-November 3, 2026
- SE 112th Avenue (between SE Knapp Street and SE Lexington Street). Targeted base repair. Scheduled November 2026
- SE 54th Avenue and SE Reedway Street Paving work to backfill gaps after separate ADA curb ramp work. Estimate: ~3 days to complete.
- SE Pardee Street and SE 58th Avenue Paving work to backfill gaps after separate ADA curb ramp work. Estimate: ~3 days to complete.
- SW Montgomery Street and SW 16th Avenue Paving work to backfill gaps after separate ADA curb ramp work. Estimate: ~3 days to complete.
Additional scheduled
Projects listed in planned order of operations with links to project pages, if any. Dates subject to change.
Postponed maintenance
- NE 36th Avenue (1900 block). Base Repair- Paving work to remove cavity in the street.
- NE 53rd Avenue and Hoyt Street. Base Repair- Paving work to remove cavity in the street
- SE 11th Avenue and SE Madison Street. Paving work to backfill gaps after separate ADA curb ramp work.
- NW Alpine Terrace (500 block). Base Repair to remove cavity in the street.
- NW Lovejoy Street (15th to 19th avenues). Grind and repave.
- NE Knott Street and NE 21st Avenue Targeted base repair.
- NE Merges Drive and NE 36th Avenue Targeted base repair.
- NE Schuyler (2000 block). Base Repair to remove cavity in the street.
- NE 21st and Knott (2800 block). Base Repair to remove cavity in the street.
- NW 30th and NW Davis. Base Repair to remove cavity in the street.
- W Burnside Street (from I-405 to 20th Avenue). Targeted base repair.
Completed projects FY 2026-27
Projects listed here will have been completed during fiscal year 2026-2027 (July 1, 2026 – June 30, 2027). Work listed by quadrant, then alphabetically by street segment.
North Portland
- N Church Street and N Maryland Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed October 27, 2026.
- N Fremont St and N Vancouver Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed August 24, 2026.
- N Killingsworth Street (Borthwick to Williams avenues). Grind and repave. Completed July 14, 2026.
Northeast Portland
- NE 12th Avenue and NE Davis Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 27, 2026.
- NE 12th Avenue and NE Flanders Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 25, 2026.
- NE 42nd Avenue (between NE Stanton Street and NE Brazee Street). Targeted base repair. Completed September 17, 2026
- NE 84th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 4, 2026.
- NE 85th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 4, 2026.
- NE 86th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 8, 2026.
- NE 89th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 10, 2026.
- NE 90th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 16, 2026.
- NE 91st Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 3, 2026.
- NE 92nd Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 3, 2026.
- NE 122nd Avenue (Glisan to Holladay streets). Grind and repave. Completed September 29, 2026
- NE 122nd Avenue (Holladay to Halsey streets). Grind and repave. Completed September 29, 2026
- NE 122nd Avenue (Halsey Street to Broadway). Grind and repave. Completed October 15, 2026
- NE 122nd Avenue and NE Holladay Street Paving work to backfill gaps after separate ADA curb ramp work. Completed September 9,2026.
- NE Brazee Street and NE 61st Avenue Targeted base repair. Completed October 6, 2026.
- NE Couch Street and NE 41st Avenue Targeted base repair. Completed October 2, 2026
- NE Glisan Street (82nd to 92nd avenues). Grind and repave. Completed September 8, 2026
- NE Halsey Street and NE 126th Avenue Targeted base repair. Completed October 7, 2026.
- NE Prescott Street and NE 95th Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed October 7,2026.
- NE Prescott Street and NE 96th Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed October 7,2026.
- NE Prescott Street and NE 97th Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed October 7, 2026.
- NE Regents Drive and NE Bryce Street Paving work to backfill gaps after separate ADA curb ramp work. Completed October 7, 2026.
- NE Regents Drive and NE Dunkley Street Paving work to backfill gaps after separate ADA curb ramp work. Completed September 29, 2026.
- NE Sacramento Street (132nd to 148th avenues). Grind and repave. Completed August 13, 2026
Northwest Portland
- NW 23rd Avenue and NW Marshall Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 13, 2026.
- NW 23rd Avenue and NW Lovejoy Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 18, 2026.
Southeast Portland
- SE 7th Avenue and SE Madison Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 24, 2026.
- SE 17th Avenue and SE Clinton Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 28,2026.
- SE 17th Avenue and SE Taggart Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 20, 2026.
- SE 17th Avenue and SE Woodward Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 28, 2026.
- SE 58th Avenue and SE Mitchell Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 16, 2026.
- SE 58th Avenue and SE Raymond Street Paving work to backfill gaps after separate ADA curb ramp work. Completed September 17, 2026.
- SE 58th Avenue and SE Schiller Street Paving work to backfill gaps after separate ADA curb ramp work. Completed September 29, 2026.
- SE 62nd Avenue and SE Holgate Boulevard Paving work to backfill gaps after separate ADA curb ramp work. Completed September 15, 2026.
- SE 104th Drive (SE 103rd Drive to SE Division Street) Crack seal preventative maintenance of road surface. Completed July 20, 2026.
- SE 104th Drive (SE Stephens Street to SE Harrison Street) Crack seal preventative maintenance of road surface. Completed August 3, 2026.
- SE Harrison Street (SE 50th to SE 39th avenues) Crack seal preventative maintenance of road surface. Completed August 17, 2026.
- SE Stephens Street and SE 76th Ave Targeted base repair. Completed September 23, 2026
- SE Stephens Street (SE 101st to SE 104th avenues) Crack seal preventative maintenance of road surface. Completed August 3, 2026.
- SE Woodstock Boulevard and SE 32nd Avenue Targeted base repair. Completed October 8, 2026.
Southwest Portland
- SW Dosch Road (from 100 feet east of Patton Road to Hamilton Street). Base repair and overlay. Completed August 4,2026
- SW Sam Jackson Park Road (SW Marquam Street to Campus Drive). Grind and repave. Completed July 12, 2026.
Archived project list
PBOT began publishing routine pavement project lists in fall 2024.