Overview
Throughout the year, Portland Bureau of Transportation (PBOT) crews and contractors handle all types of basic road maintenance projects to preserve pavement conditions, so it lasts longer. These are projects bigger than a single pothole or utility cut, and not part of any capital improvement project.
Typical schedule
- January – April: Gravel Street service, some base repair
- April – September: Grind-and-pave work, base repair
- May – September: Sealing work such as micro-surfacing, slurry seal, crack seal etc.
- October – December: Gravel Street service, base repairs
Timing
Much of this work is weather-dependent and scheduled 1-2 months in advance based on numerous factors including road conditions and crew availability. Projects typically take anywhere from half a day to a full work week. Typical hours of work are 6 a.m. - 4 p.m.
What to expect
As with all construction projects, expect some dust and noise from heavy equipment, as well as minor disruptions to traffic.
Obey work zones
Always travel cautiously around work zones, observe all lane closures and directions by reader boards and flaggers. Expect 20-minute delays and detour. Use alternate routes if possible.
September 2026
- NE 122nd Avenue (Glisan to Holladay streets). Grind and repave. Scheduled September 3, 2026-September 22, 2026
- NE 122nd Avenue (Holladay to Halsey streets). Grind and repave. Scheduled September 23, 2026-October 6, 2026
- SE 58th Avenue and SE Raymond Street Paving work to backfill gaps after separate ADA curb ramp work. Estimate: ~3 days to complete.
- SE 58th Avenue and SE Schiller Street Paving work to backfill gaps after separate ADA curb ramp work. Estimate: ~3 days to complete.
Additional scheduled
Projects listed in planned order of operations with links to project pages, if any. Dates subject to change.
- NE 122nd Avenue (Halsey Street to Broadway). Grind and repave. Scheduled October 12, 2026-October 15, 2026
- NE Prescott Street (from 501 feet east of 92nd Avenue to 102nd Avenue). Grind and repave. Scheduled October 19, 2026-October 27, 2026
- W Burnside Street (from I-405 to 20th Avenue). Targeted base repair. Scheduled October 2026
Postponed maintenance
- NE 36th Avenue (1900 block). Base Repair- Paving work to remove cavity in the street.
- NE 53rd Avenue and Hoyt Street. Base Repair- Paving work to remove cavity in the street
- SE 11th Avenue and SE Madison Street. Paving work to backfill gaps after separate ADA curb ramp work.
- NW Alpine Terrace (500 block). Base Repair to remove cavity in the street.
- NW Lovejoy Street (15th to 19th avenues). Grind and repave.
- NE Schuyler (2000 block). Base Repair to remove cavity in the street.
- NE 21st and Knott (2800 block). Base Repair to remove cavity in the street.
- NW 30th and NW Davis. Base Repair to remove cavity in the street.
Completed projects FY 2026-27
Projects listed here will have been completed during fiscal year 2026-2027 (July 1, 2026 – June 30, 2027). Work listed by quadrant, then alphabetically by street segment.
North Portland
- N Fremont St and N Vancouver Avenue Paving work to backfill gaps after separate ADA curb ramp work. Completed August 24, 2026.
- N Killingsworth Street (Borthwick to Williams avenues). Grind and repave. Completed July 14, 2026.
Northeast Portland
- NE 12th Avenue and NE Davis Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 27, 2026.
- NE 12th Avenue and NE Flanders Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 25, 2026.
- NE 84th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 4, 2026.
- NE 85th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 4, 2026.
- NE 86th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 8, 2026.
- NE 89th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 10, 2026.
- NE 90th Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 16, 2026.
- NE 91st Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 3, 2026.
- NE 92nd Avenue and NE Glisan Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 3, 2026.
- NE Glisan Street (82nd to 92nd avenues). Grind and repave. Completed September 8, 2026
- NE Sacramento Street (132nd to 148th avenues). Grind and repave. Completed August 13, 2026
Northwest Portland
- NW 23rd Avenue and NW Marshall Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 13, 2026.
- NW 23rd Avenue and NW Lovejoy Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 18, 2026.
Southeast Portland
- SE 7th Avenue and SE Madison Street Paving work to backfill gaps after separate ADA curb ramp work. Completed August 24, 2026.
- SE 17th Avenue and SE Clinton Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 28,2026.
- SE 17th Avenue and SE Taggart Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 20, 2026.
- SE 17th Avenue and SE Woodward Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 28, 2026.
- SE 58th Avenue and SE Mitchell Street Paving work to backfill gaps after separate ADA curb ramp work. Completed July 16, 2026.
- SE 104th Drive (SE 103rd Drive to SE Division Street) Crack seal preventative maintenance of road surface. Completed July 20, 2026.
- SE 104th Drive (SE Stephens Street to SE Harrison Street) Crack seal preventative maintenance of road surface. Completed August 3, 2026.
- SE Harrison Street (SE 50th to SE 39th avenues) Crack seal preventative maintenance of road surface. Completed August 17, 2026.
- SE Stephens Street (SE 101st to SE 104th avenues) Crack seal preventative maintenance of road surface. Completed August 3, 2026.
Southwest Portland
- SW Dosch Road (from 100 feet east of Patton Road to Hamilton Street). Base repair and overlay. Completed August 4,2026
- SW Sam Jackson Park Road (SW Marquam Street to Campus Drive). Grind and repave. Completed July 12, 2026.
Archived project list
PBOT began publishing routine pavement project lists in fall 2024.