Basic road maintenance schedule

Information
N Schmeer Rd grind and pave crew 2024
Schedule of basic road maintenance from the Portland Bureau of Transportation (PBOT). Includes gravel street service, grind-and-pave, base repair, crack sealing, micro-surfacing, and other work to preserve pavement conditions. Work typically takes less than a week, with minor traffic disruption.
On this page

Overview

Throughout the year, Portland Bureau of Transportation (PBOT) crews and contractors handle all types of basic road maintenance projects to preserve pavement conditions, so it lasts longer. These are projects bigger than a single pothole or utility cut, and not part of any capital improvement project. 

Typical schedule

  • January – April: Gravel Street service, some base repair
  • April – September: Grind-and-pave work, base repair
  • May – September: Sealing work such as micro-surfacing, slurry seal, crack seal etc.
  • October – December: Gravel Street service, base repairs

Timing

Much of this work is weather-dependent and scheduled 1-2 months in advance based on numerous factors including road conditions and crew availability. Projects typically take anywhere from half a day to a full work week. 

What to expect

As with all construction projects, expect some dust and noise from heavy equipment, as well as minor disruptions to traffic. 

Obey work zones

Always travel cautiously around work zones, observe all lane closures and directions by reader boards and flaggers. Use alternate routes if possible.


March 2025

Mar. 3 - 4

Mar. 4 - 5

Mar. 4 - 5

Mar. 6- 7

Mar. 10- 11

Mar. 10 - 11

  • Location: NE Cesar E Chavez Blvd: Hassalo Street to Laddington Street (center lanes)
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Completed

Mar. 10 - 11

Mar. 12 - 17

Mar. 17

  • Location: SE Cesar E Chavez Blvd: Lincoln Street to Division Street (southbound curb lane)
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Completed

Mar. 17 - 20

Mar. 18 - 19

Mar. 18 - 20

  • Location: SW Broadway: SW College St to I-405 Bridge
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Completed

Mar. 20 - 21

Mar. 22

  • Location: S Hood Ave (300 block)
  • Description: Paving travel lane for Water Bureau
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Mar. 24 - 25

  • Location: SE Cesar E Chavez Blvd: Brooklyn Street to Franklin Street (southbound and northbound curb lanes)
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Mar. 24 - 25

Mar. 26 - 27

  • Location: N Portland Rd and N Columbia Blvd
  • Description: Paving work fix dip in travel lane.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Mar. 26 - 27

Mar. 27 - Apr 1

  • Location: SE Foster Rd (14300 block) (travel lane only)
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

April 2025

Apr. 2

  • Location: SE 52nd Avenue and SE Foster Road
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Apr. 3 - 7

  • Location: SW Greenway Avenue and SW Patton Rd
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Apr. 8 - 9

  • Location: SW Talbot Avenue and SW Fairmount Blvd
  • Description: Paving work to eliminate potholes.
  • Hours of work: 6 a.m. - 4 p.m.
  • Traffic impacts: Watch and obey traffic flaggers. Expect 20-minute delays.
  • Status: Scheduled

Apr. 18 - 19


Completed projects for Fiscal Year 2024-2025 (by quadrant)

North Portland

  • N Boston Avenue (5600 block). Remove tree roots to improve drainage. Completed Feb. 10-11, 2025.
  • N Denver Avenue and Kilpatrick Street. Paving work to repair concrete panels. Completed Jan. 22, 2025
  • N Denver Avenue and Schofield Street. Paving work to repair concrete panels. Completed Jan. 22–23, 2025.
  • N Houghton Street and Fortune Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 29 - Nov 4, 2024.
  • N Houghton Street and Kimball Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 24 - 28, 2024.
  • N Houghton Street and Superior Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 28, 2024.
  • N Houghton Street and Wall Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 21 - 22, 2024.
  • N Houghton Street and Westanna Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 18 – 19.
  • N Kalmar St (Swenson Street to dead end). Pavement repairs to eliminate potholes. Completed Sept. 4 - 5, 2024.
  • N Killingsworth and Borthwick streets. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 9-10, 2025.
  • N Lombard Street (1900 block). Street grind and repave to ODOT standards for Water Bureau. Completed Oct. 8, 2024.
  • N Mohawk Avenue (7900 block). Paving work to remove potholes. Completed Jan. 29, 2025.
  • N Pierce Avenue (N Willamette Boulevard to dead end). Pavement repairs to eliminate potholes. Completed Sept. 3 - 4, 2024.
  • N Schmeer Road (Vancouver Avenue to Amazon facility). Street grind and repave travel lanes to eliminate potholes. Completed Sept. 23 - 24, 2024.
  • N Willamette Boulevard (Carey Boulevard to Portsmouth Avenue). Street grind and repave. Completed Aug. 8 – 15, 2024.

Northeast Portland

  • NE 3rd Avenue (Wasco to Clackamas streets). Base Repair sunken area in street. Completed Oct. 1, 2024.
  • NE 9th Avenue (2100 block). Paving work to repair broken concrete. Completed Feb. 18, 2025.
  • NE 9th Avenue (3100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 6, 2025.
  • NE 10th Avenue and Shaver Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 9 - 10, 2024.
  • NE 12th Avenue (Davis to Flanders streets). Grind and repave potholes. Completed Oct. 28 - 29, 2024.
  • NE 17th Avenue (3100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 18 - 20, 2025.
  • NE 18th Avenue (2200 block). Paving work to remove potholes. Completed Jan. 16, 2025.
  • NE 18th Avenue (2500 block). Remove tree roots to improve drainage on street. Completed Jan. 20, 2025.
  • NE 22nd Avenue (2700 block). Repair street at curb due to tree removal. Completed Nov. 1, 2024.
  • NE 26th Avenue and Knott Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 2-5, 2024.
  • NE 26th Avenue and Schuyler Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 3, 2024.
  • NE 26th Avenue and Thompson Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5 – 7.
  • NE 26th Avenue and Tillamook Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 2, 2024.
  • NE 31st Avenue and Brazee Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 21 – 22, 2024.
  • NE 33rd Avenue (Broadway to Lombard Street). Preventive maintenance - crack seal curb line to extend the life of the street. Completed Aug. 21 - 31, 2024.
  • NE 33rd Ave and Broadway. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 15, 2025.
  • NE 33rd Avenue and Sandy Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 14, 2025.
  • NE 38th Avenue (5500 block). Repair street at driveway apron. Completed Nov. 1, 2024.
  • NE 76th Avenue (Stanton to Morris). Water Main pave back and base repair street. Completed Aug. 23 - 27, 2024.
  • NE 122nd Avenue (500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 8, 2024.
  • NE 122nd Avenue (800 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 9, 2024.
  • NE 122nd Avenue and Holladay Place. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 10, 2024.
  • NE 122nd Avenue and Multnomah Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 14, 2024.
  • NE 122nd Avenue and Oregon Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 7, 2024.
  • NE 131st Place (Sandy Boulevard to Shaver Street). Installing speed bumps. Completed Sept. 6, 2024.
  • NE Alberta Street (52nd Avenue to Cully Boulevard). Street grind and repave - remove 2 inches of asphalt and replace with new (Completed Sept. 12 - 19, 2024); Reinstall speed bumps (Completed Oct. 11 - 12, 2024).
  • NE Beech Street (82nd to 85th avenues). Installing speed bumps. Completed Sept. 16 - 17, 2024.
  • NE Dekum Street and Mallory Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5 – 6, 2024.
  • NE Fremont Street (NE 57th Avenue to N Williams Avenue). Preventive maintenance - crack seal curb line to extend the life of the street. Completed Sept. 3 - 13, 2024.
  • NE Hancock Street (1700 block). Paving work to remove potholes. Completed Feb. 21, 2025.
  • NE Hassalo Street (3400 block). Remove tree roots to improve drainage on street. Completed Jan. 24, 2025.
  • NE Killingsworth Street and Kerby Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 24, 2025.
  • NE Milton Street (82nd to 85th avenues). Installing speed bumps. Completed Sept. 16 - 17, 2024.
  • NE Morris Street (76th Avenue to dead end). Water Main pave back and base repair street. Completed Aug. 23 - 27, 2024.
  • NE Pacific Street (2200 block). Paving work to repair depression in street. Completed Jan. 15 – 16, 2025.
  • NE Prescott Street at105th, 110th, 111th, and 112th avenues. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 2-9, 2024.
  • NE Shaver Street (4600 block). Remove tree roots to improve drainage on street. Completed Jan. 27, 2025.
  • NE Siskiyou Street (14300 block). Remove tree roots to improve drainage. Completed Feb. 10, 2025.
  • NE Weidler Street and 17th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 18 - 23, 2024.
  • NE Weidler Street and 19th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 11 - 12, 2024.
  • NE Weidler Street and 22nd Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 24 - 25, 2024.
  • NE Weidler Street (Victoria to 3rd Avenues). Base repairs to remove potholes and risk claims. Completed Oct. 22 - 24, 2024.
  • NE Wygant Street (1500 block). Remove tree roots to improve drainage. Completed Feb. 19 - 20, 2025.
  • NE Killingsworth Street & Haight Ave. Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb 21 - 24, 2025.
  • NE Killingsworth Street (700 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb 25 - 27, 2025.

Northwest Portland

  • NW Lovejoy Street (15th to 19th avenues). Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 8 – 20, 2024.

Southeast Portland

  • Gravel Street Service in the Lents, Powellhurst-Gilbert, Centennial, Pleasant Valley, Mt. Tabor, and Brentwood-Darlington neighborhoods. Work December 2024 - February 2025 (and ongoing).
  • SE 2nd Avenue and Mill Street. Paving work to remove potholes. Completed Dec. 4, 2024.
  • SE 7th Avenue (900 block). Paving work to remove potholes. Completed Jan. 17, 2025.
  • SE 7th Avenue (2100 block). Paving work to remove potholes Completed Jan. 7-8, 2025.
  • SE 7th Avenue (Harrison to Grant streets). Street grind and repave to eliminate potholes. Completed Oct. 10, 2024.
  • SE 7th Avenue (Taylor to Salmon streets). Street grind and repave to eliminate potholes. Completed Oct. 8 - 9, 2024.
  • SE 12th Avenue (Mill to Clay). Pavement repairs to eliminate potholes. Completed Aug. 28, 2024.
  • SE 36th Avenue (4700 block). Paving work to remove potholes. Completed Jan. 9, 2025.
  • SE 36th Avenue and Center Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5, 2024.
  • SE 49th Avenue and Carlton Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 6 – 7, 2024.
  • SE 49th Avenue and Henry Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 14 – 15, 2024.
  • SE 49th Avenue and Martins Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 12 – 13, 2024.
  • SE 49th Avenue and Tolman Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 4 – 6, 2024.
  • SE 87th Avenue and Holgate Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 8, 2024.
  • SE 89th Avenue and Holgate Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 6, 2024.
  • SE Alder Court and Morrison Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 25, 2024.
  • SE César E. Chávez Boulevard (1900 block). Street grind and repave travel lane to eliminate potholes. Completed Sept. 13, 2024.
  • SE Flavel Street (117th to 120th avenues). Street grind and repave travel lanes to eliminate potholes. Completed Sept. 13, 2024.
  • SE Milwaukie Avenue (4700 block). Paving work to remove potholes. Completed Feb. 11, 2025.
  • SE Mt Scott Boulevard (92nd to 112th avenues). Street grind and repave travel lanes to eliminate potholes. In progress Sept. 26 - Oct. 3, 2024.
  • SE Ogden Street and 60th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 22, 2024.
  • SE Spruce Avenue (2200 block). Paving work to remove potholes. Completed Jan. 29, 2025.
  • SE Stark Street (86th to 90th avenues). Street grind and repave. Completed Sept. 9 - 12, 2024.
  • SE Stephens Street (38th Avenue to César E Chávez Boulevard). Street repairs to eliminate poor drainage. Completed Sept. 13, 2024.
  • SE Taylor Street and 90th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 2, 2024.
  • SE Stark Street (7200 block) Paving work to remove potholes.  Completed Feb. 26 - 27, 2025.
  • SE 101st Avenue (6100 block) Paving work to remove potholes.  Completed Feb. 27, 2025.

Southwest Portland

  • Gravel Street Service in Arlington Heights, Ashcreek, Crestwood, Hayhurst, Hillsdale, Homestead, Multnomah, Maplewood, South Portland, Southwest Hills, and Sylvan-Highlands neighborhoods. Completed October - November 2024.
  • SW 34th Avenue and Stephenson Street. Move and reinstall speed bump, drainage issues. Completed Oct. 21 - 29, 2024.
  • SW 45th Avenue and Alice Street. Base Repair soft section of street. Completed Oct. 1, 2024.
  • SW 50th Avenue and Mill Street. Paving work to remove potholes. Completed Dec. 5, 2024.
  • SW Capitol Highway and Dickenson Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 13, 2025.
  • SW Hamilton Street (300 block). Paving work to remove cavity in the street. Completed Jan. 9-10, 2025.
  • SW Miles Street (2000 block). Paving work to repair utility patch. Completed Jan. 10, 2025.
  • SW Multnomah Boulevard (64th Avenue to Garden Home Road). Street grind and repave to eliminate potholes. Completed Oct. 9-18, 2024.
  • SW Patton Court (2500 block). Paving work to remove potholes. Completed Jan. 13 – 14, 2025.
  • SW View Point Terrace (Alice to Brugger streets). Street grind and repave to eliminate potholes. Completed Oct. 7, 2024.
  • SW Westwood View (Mitchell Street to Westwood Drive). Base repair to eliminate potholes. Completed Aug. 19 – 22, 2024.

Postponed maintenance

  • N Jantzen Drive (Hayden Island to Tomahawk Island drives). Street grind and repave to eliminate potholes. Originally scheduled Oct. 17-18, 2024. Postponed due to weather, new dates TBD.
  • NE Alberta Street (42nd to 52nd avenues). Install speed bumps. Originally scheduled Oct. 17-18, 2024. Postponed due to weather, rescheduled for spring 2025
  • NE Killingsworth Street and Williams Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Postponed due to inclement weather, dates TBD.
  • NE Martin Luther King Jr Boulevard (2700 block). Paving work to remove potholes. Postponed to February due to inclement weather.
  • NE Prescott Street (92nd to 102nd avenues) - westbound lanes only.Street grind and repave - remove 2 inches of asphalt and replace with new. Postponed until 2025, dates TBD.
  • NW 24th Avenue and Irving Street. Paving work to backfill gaps after separate ADA curb ramp work. Postponed until March 2025
  • NW 24th Avenue and Johnson Street. Paving work to backfill gaps after separate ADA curb ramp work. Postponed until March 2025
  • NW 24th Avenue and Vaughn Street. Paving work to backfill gaps after separate ADA curb ramp work. Postponed to February 2025.
  • NW Alpine Terrace (500 block). Paving work to remove potholes. Postponed to February due to inclement weather.
     

Contact

PBOT Customer Service (by PDX 311)

phone number311Information and Customer Service
phone number503-823-4000Every day, 7 a.m. to 8 p.m. (excluding federal holidays) Interpretation available | Interpretación disponible | Phiên dịch có sẵn | 提供口译服务 | Доступна интерпретация | Tafsiir la heli karo | Доступний переклад
Oregon Relay Service711Oregon Relay Service

Follow on Social Media

Back to top