Road maintenance work for FY 2024-25

Transportation
Completed
Ongoing basic road maintenance work performed by the Maintenance Operations group of the Portland Bureau of Transportation (PBOT). All projects completed during fiscal year 2024-2025. Work listed by quadrant, then alphabetically by street segment.

Overview

Throughout the year, Portland Bureau of Transportation (PBOT) crews and contractors handle all types of basic road maintenance projects to preserve pavement conditions, so it lasts longer. These are projects bigger than a single pothole or utility cut, and not part of any capital improvement project. 

For upcoming projects, visit:

Basic road maintenance schedule

All projects listed below were completed during fiscal year 2024-2025 (July 1, 2024 – June 30, 2025). Work listed by quadrant, then alphabetically by street segment.


North Portland

  • N Boston Avenue (5600 block). Remove tree roots to improve drainage. Completed Feb. 10-11, 2025.
  • N Central Ave (8000 block). Paving work to repair low spot at intersection. Completed March 18-19, 2025.
  • N Denver Avenue and Kilpatrick Street. Paving work to repair concrete panels. Completed Jan. 22, 2025
  • N Denver Avenue and Schofield Street. Paving work to repair concrete panels. Completed Jan. 22–23, 2025.
  • N Edison Street (7000 block). Paving work to eliminate potholes. Completed June 11, 2025.
  • N Haight Avenue (300 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 6-7, 2025.
  • N Haight Avenue (300 Block). Paving work to repair depression in street. Completed June 9, 2025.
  • N Houghton Street and Fortune Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 29 – Nov. 4, 2024.
  • N Houghton Street and Kimball Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 24 - 28, 2024.
  • N Houghton Street and Superior Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 28, 2024.
  • N Houghton Street and Wall Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 21 - 22, 2024.
  • N Houghton Street and Westanna Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 18 – 19.
  • N Humboldt Street (4800 block). Remove tree roots to improve drainage. Completed March 26, 2025.
  • N Ivy Avenue (500 block). Pave back for Environmental Services division. Completed June 23 – 24, 2025.
  • N Kalmar St (Swenson Street to dead end). Pavement repairs to eliminate potholes. Completed Sept. 4 - 5, 2024.
  • N Killingsworth and Borthwick streets. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 9-10, 2025.
  • N Killingsworth Street and Williams Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed May 20, 2025.
  • N Kilpatrick Street (Delaware to Denver avenues).Street grind and repave. Completed June 2 – 10, 2025.
  • N Lombard Street (1900 block). Street grind and repave to ODOT standards for Water Bureau. Completed Oct. 8, 2024.
  • N Martin Luther King Jr Blvd ramp and Vancouver Way. Paving work to eliminate potholes. Completed March 1, 2025.
  • N Mohawk Avenue (7900 block). Paving work to eliminate potholes. Completed Jan. 29, 2025.
  • N Pierce Avenue (Willamette Boulevard to dead end). Pavement repairs to eliminate potholes. Completed Sept. 3 - 4, 2024.
  • N Portland Road and Columbia Boulevard. Paving work to fix depression in travel lane. Completed April 17-21, 2025
  • N Schmeer Road (Vancouver Avenue to Amazon facility). Street grind and repave travel lanes to eliminate potholes. Completed Sept. 23 - 24, 2024.
  • N Webster Street and Basin Avenue. Paving work to eliminate potholes. Completed March 20, 2025.
  • N Willamette Boulevard (7000 block). Paving work to eliminate potholes. Completed June 9, 2025.
  • N Willamette Boulevard (9500 block). Remove tree roots to improve drainage. Completed March 27, 2025.
  • N Willamette Boulevard (Carey Boulevard to Portsmouth Avenue). Street grind and repave. Completed Aug. 8 – 15, 2024.

Northeast Portland

  • NE 152nd Avenue (15100 block). Paving work to eliminate potholes. Completed June 26 - 30, 2025.
  • E Burnside Street (8200 block). Paving work to eliminate potholes. Completed June 10, 2025.
  • NE 3rd Avenue (Wasco to Clackamas streets). Base Repair sunken area in street. Completed Oct. 1, 2024.
  • NE 9th Avenue (2100 block). Paving work to repair broken concrete. Completed Feb. 18, 2025.
  • NE 9th Avenue (3100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 6, 2025.
  • NE 10th Avenue and Shaver Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 9 - 10, 2024.
  • NE 11th Avenue (2800 block). Paving work to backfill gaps after separate sidewalk curb work. Completed May 5, 2025.
  • NE 12th Avenue (3100 block). Paving work to backfill gaps after separate sidewalk curb work. Completed May 5, 2025.
  • NE 12th Avenue (Davis to Flanders streets). Grind and repave potholes. Completed Oct. 28 - 29, 2024.
  • NE 17th Avenue (3100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 18 - 20, 2025.
  • NE 18th Avenue (2200 block). Paving work to remove potholes. Completed Jan. 16, 2025.
  • NE 18th Avenue (2500 block). Remove tree roots to improve drainage on street. Completed Jan. 20, 2025.
  • NE 22nd Avenue (2700 block). Repair street at curb due to tree removal. Completed Nov. 1, 2024.
  • NE 26th Avenue and Knott Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 2-5, 2024.
  • NE 26th Avenue and Schuyler Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 3, 2024.
  • NE 26th Avenue and Thompson Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5 – 7.
  • NE 26th Avenue and Tillamook Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 2, 2024.
  • NE 31st Avenue and Brazee Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 21 – 22, 2024.
  • NE 33rd Avenue and Broadway. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 15, 2025.
  • NE 33rd Avenue (Broadway to Lombard Street). Preventive maintenance - crack seal curb line to extend the life of the street. Completed Aug. 21 - 31, 2024.
  • NE 33rd Avenue and Sandy Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 14, 2025.
  • NE 37th Avenue (2600 block). Paving work to eliminate potholes. Completed May 14, 2025.
  • NE 38th Avenue (5500 block). Repair street at driveway apron. Completed Nov. 1, 2024.
  • NE 76th Avenue (Stanton to Morris). Water Main pave back and base repair street. Completed Aug. 23 - 27, 2024.
  • NE 77th Avenue (3300 block). Emergency dig, road sinking at intersection. Completed June 10 - 25, 2025. Referred to Environmental Services division for manhole repairs.
  • NE 90th Avenue (1 block). Paving work to eliminate potholes. Completed June 9, 2025.
  • NE 122nd Avenue (500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 8, 2024.
  • NE 122nd Avenue (800 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 9, 2024.
  • NE 122nd Avenue and Holladay Place. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 10, 2024.
  • NE 122nd Avenue and Multnomah Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 14, 2024.
  • NE 122nd Avenue and Oregon Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Oct. 7, 2024.
  • NE 131st Place (Sandy Boulevard to Shaver Street). Installing speed bumps. Completed Sept. 6, 2024.
  • NE Alberta Street (4900 block). Install speed bumps. Completed June 12 - 16, 2025.
  • NE Alberta Street (52nd Avenue to Cully Boulevard). Street grind and repave - remove 2 inches of asphalt and replace with new (Completed Sept. 12 - 19, 2024). Reinstall speed bumps (Completed Oct. 11 - 12, 2024).
  • NE Beech Street (82nd to 85th avenues). Installing speed bumps. Completed Sept. 16 - 17, 2024.
  • NE Broadway (1100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed June 2 – 3, 2025.
  • NE Broadway (1200 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed June 4 – 5, 2025.
  • NE Broadway (1400 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed June 6 - 12, 2025.
  • NE Broadway (1700 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed June 20, 2025.
  • NE Broadway (1900 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed June 16 - 18, 2025.
  • NE Broadway (4100 block). Pave back water main. Completed June 18, 2025.
  • NE César E Chávez Boulevard and Hassalo Street. Paving work to eliminate potholes. Completed March 10-11, 2025.
  • NE Dekum Street and Mallory Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5 – 6, 2024.
  • NE Eugene Street (8600 block). Paving work to eliminate potholes. Completed May 15-June 2, 2025.
  • NE Fremont Street (NE 57th Avenue to N Williams Avenue). Preventive maintenance - crack seal curb line to extend the life of the street. Completed Sept. 3 - 13, 2024.
  • NE Going Street (2900 block). Paving work to repair broken concrete. Completed March 31, 2025.
  • NE Hancock Street (1700 block). Paving work to eliminate potholes. Completed Feb. 21, 2025.
  • NE Hassalo Street (3400 block). Remove tree roots to improve drainage on street. Completed Jan. 24, 2025.
  • NE Holladay Street (6100 block). Paving work to eliminate potholes. Completed June 4, 2025.
  • NE Killingsworth Street (700 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 25 - 27, 2025.
  • NE Killingsworth Street (2500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed May 14, 2025.
  • NE Killingsworth Street and Haight Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Feb. 21 - 24, 2025.
  • NE Killingsworth Street and Kerby Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 24, 2025.
  • NE Klickitat Street (6200 block). Reinstall speed bump removed by BES. Completed May 28, 2025.
  • NE Knott Street (3800 block). Paving work to eliminate potholes. Completed May 14, 2025.
  • NE Mason Street (6700 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 6-7, 2025.
  • NE Milton Street (82nd to 85th avenues). Installing speed bumps. Completed Sept. 16 - 17, 2024.
  • NE Morris Street (76th Avenue to dead end). Water Main pave back and base repair street. Completed Aug. 23 - 27, 2024.
  • NE Pacific Street (2200 block). Paving work to repair depression in street. Completed Jan. 15 – 16, 2025.
  • NE Prescott Street at 105th, 110th, 111th, and 112th avenues. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 2-9, 2024.
  • NE Prescott Street (105th to 115th avenues). Street grind and repave. Completed June 16 - 27, 2025.
  • NE Shaver Street (4600 block). Remove tree roots to improve drainage on street. Completed Jan. 27, 2025.
  • NE Siskiyou Street (700 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 8-9, 2025.
  • NE Siskiyou Street (900 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 10-11, 2025.
  • NE Siskiyou Street (1000 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 4-7, 2025.
  • NE Siskiyou Street (1100 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed May 19-28, 2025.
  • NE Siskiyou Street (1200 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 17-20, 2025.
  • NE Siskiyou Street (1200 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 2-3, 2025.
  • NE Siskiyou Street (1300 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 30-May 1, 2025.
  • NE Siskiyou Street (1400 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 28-29, 2025.
  • NE Siskiyou Street (1500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed April 23-24, 2025.
  • NE Siskiyou Street (1600 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 4-5, 2025.
  • NE Siskiyou Street (14300 block). Remove tree roots to improve drainage. Completed Feb. 10, 2025.
  • NE Skidmore Street (4200 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed March 20-21, 2025.
  • NE Weidler Street (1500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed May 13, 2025.
  • NE Weidler Street (1600 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed May 14-19, 2025.
  • NE Weidler Street and 17th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 18 - 23, 2024.
  • NE Weidler Street and 19th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 11 - 12, 2024.
  • NE Weidler Street (2200 block). Paving work to repair low spot at intersection. Completed March 4-5, 2025.
  • NE Weidler Street and 22nd Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Sept. 24 - 25, 2024.
  • NE Weidler Street (Victoria to 3rd avenues). Base repairs to remove potholes and risk claims. Completed Oct. 22 - 24, 2024.
  • NE Wygant Street (1500 block). Remove tree roots to improve drainage. Completed Feb. 19 - 20, 2025.

Northwest Portland

  • NW York Street (2300 block). Paving work to eliminate potholes. Completed June 11, 2025.
  • NW Cornell Road (Skyline Boulevard to Miller Road). Paving work to eliminate potholes. Completed April 22-28, 2025
  • NW Lovejoy Street (15th to 19th avenues). Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 8–20, 2024.

South Portland

  • S Hood Avenue (300 block). Grind and pave to restore street to code for Water Bureau. Completed Apr 16, 2025.

Southeast Portland

  • Gravel Street Service in the Lents, Powellhurst-Gilbert, Centennial, Pleasant Valley, Mt. Tabor, and Brentwood-Darlington neighborhoods. Work December 2024 - February 2025.
  • SE 2nd Avenue and Mill Street. Paving work to remove potholes. Completed Dec. 4, 2024.
  • SE 7th Avenue (900 block). Paving work to remove potholes. Completed Jan. 17, 2025.
  • SE 7th Avenue (2100 block). Paving work to remove potholes Completed Jan. 7-8, 2025.
  • SE 7th Avenue (Harrison to Grant streets). Street grind and repave to eliminate potholes. Completed Oct. 10, 2024.
  • SE 7th Avenue (Taylor to Salmon streets). Street grind and repave to eliminate potholes. Completed Oct. 8 - 9, 2024.
  • SE 12th Avenue (Mill to Clay streets). Pavement repairs to eliminate potholes. Completed Aug. 28, 2024.
  • SE 32nd Place and Grant Street. Paving work to repair low spot at the intersection. Completed March 4, 2025.
  • SE 36th Avenue (4700 block). Paving work to remove potholes. Completed Jan. 9, 2025.
  • SE 36th Avenue and Center Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 5, 2024.
  • SE 49th Avenue and Carlton Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 6 – 7, 2024.
  • SE 49th Avenue and Henry Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 14 – 15, 2024.
  • SE 49th Avenue and Martins Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 12 – 13, 2024.
  • SE 49th Avenue and Tolman Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 4 – 6, 2024.
  • SE 52nd Avenue and SE Foster Road. Paving work to eliminate potholes. Completed April 7-15, 2025.
  • SE 54th Avenue (2100 Block). Paving work to repair concrete panels. Completed May 14, 2025.
  • SE 87th Avenue and Holgate Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 8, 2024.
  • SE 88th Avenue (8700 block). Paving work to eliminate potholes. Completed May 9, 2025.
  • SE 89th Avenue and Holgate Boulevard. Paving work to backfill gaps after separate ADA curb ramp work. Completed Dec. 6, 2024.
  • SE 94th Avenue (1100 block). Emergency dig, road sinking at intersection. Completed June 10 - 26, 2025.
  • SE 101st Avenue (6100 block) Paving work to remove potholes. Completed Feb. 27, 2025.
  • SE 140th Drive (8000 block). Paving work to repair depression in street. Completed May 13, 2025.
  • SE Alder Court and Morrison Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Nov. 25, 2024.
  • SE César E. Chávez Boulevard (1900 block). Street grind and repave travel lane to eliminate potholes. Completed Sept. 13, 2024.
  • SE César E Chávez Boulevard and Brooklyn Street. Paving work to eliminate potholes. Completed March 24-25, 2025
  • SE César E Chávez Boulevard and Lincoln Street. Paving work to eliminate potholes. Completed March 17, 2025.
  • SE Division Street (6300 block). Paving work to eliminate potholes. Completed April 1-2, 2025.
  • SE Flavel Street (11100 block). Paving work to eliminate potholes. Completed June 17, 2025.
  • SE Flavel Street (117th to 120th avenues). Street grind and repave travel lanes to eliminate potholes. Completed Sept. 13, 2024.
  • SE Foster Road (14300 block). Paving work to eliminate potholes. Completed April 3-4, 2025.
  • SE Franklin Street (1000 block). Paving work to eliminate potholes. Completed April 25, 2025.
  • SE Milwaukie Avenue (4700 block). Paving work to remove potholes. Completed Feb. 11, 2025.
  • SE Mt Scott Boulevard (92nd to 112th avenues). Street grind and repave travel lanes to eliminate potholes. In progress Sept. 26 - Oct. 3, 2024.
  • SE Ogden Street and 60th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 22, 2024.
  • SE Rex Street (3100 block). Paving work to eliminate potholes. Completed April 25, 2025.
  • SE Spruce Avenue (2200 block). Paving work to remove potholes. Completed Jan. 29, 2025.
  • SE Stark Street (7200 block) Paving work to remove potholes. Completed Feb. 26 - 27, 2025.
  • SE Stark Street (86th to 90th avenues). Street grind and repave. Completed Sept. 9 - 12, 2024.
  • SE Stark Street (108th to 122nd avenues). Street grind and repave. Completed May 5-30, 2025.
  • SE Stephens Street (38th Avenue to César E Chávez Boulevard). Street repairs to eliminate poor drainage. Completed Sept. 13, 2024.
  • SE Taylor Street and 90th Avenue. Paving work to backfill gaps after separate ADA curb ramp work. Completed Aug. 2, 2024.
  • SE Tenino Street (4500 block). Paving work to backfill gaps after separate ADA curb ramp work. Completed May 21, 2025.
  • SE Woodward Street (1800 block) Paving work to backfill gaps after separate ADA curb ramp work. Completed March 16-17, 2025.

Southwest Portland

  • Gravel Street Service in Arlington Heights, Ashcreek, Crestwood, Hayhurst, Hillsdale, Homestead, Multnomah, Maplewood, South Portland, Southwest Hills, and Sylvan-Highlands neighborhoods. Completed October - November 2024.
  • SW 34th Avenue and Stephenson Street. Move and reinstall speed bump, drainage issues. Completed Oct. 21 - 29, 2024.
  • SW 45th Avenue and Alice Street. Base Repair soft section of street. Completed Oct. 1, 2024.
  • SW 50th Avenue and Mill Street. Paving work to remove potholes. Completed Dec. 5, 2024.
  • SW Arnold Road and 28th Avenue. Paving work to eliminate potholes. Completed June 11, 2025.
  • SW Arthur Street (100 block). Emergency dig, road sinking at intersection. Completed April 16-19, 2025
  • SW Boones Ferry Road (800 Block). Paving work to eliminate potholes. Completed April 29-30, 2025.
  • SW Broadway (College Street to I-405 bridge). Paving work to eliminate potholes. Completed March 18-20, 2025.
  • SW Capitol Highway and Dickenson Street. Paving work to backfill gaps after separate ADA curb ramp work. Completed Jan. 13, 2025.
  • SW Chesapeake Avenue (4000 block). Skin patch Water Bureau cut. Completed May 5, 2025.
  • SW Freeman Street (3100 Block). Repair gravel shoulders, drainage issues and street paving. Completed May 6 - June 4, 2025.
  • SW Greenway Avenue and Patton Road. Paving work to eliminate potholes. Completed April 9-14, 2025.
  • SW Hamilton Street (300 block). Paving work to remove cavity in the street. Completed Jan. 9-10, 2025.
  • SW Miles Street (2000 block). Paving work to repair utility patch. Completed Jan. 10, 2025.
  • SW Multnomah Boulevard (64th Avenue to Garden Home Road). Street grind and repave to eliminate potholes. Completed Oct. 9-18, 2024.
  • SW Patton Court (2500 block). Paving work to eliminate potholes. Completed Jan. 13–14, 2025.
  • SW Pendleton Street (5500 Block). Paving work to repair depression in street. Completed May 5, 2025.
  • SW Talbot Road and Fairmount Boulevard. Paving work to eliminate potholes. Completed June 10, 2025.
  • SW View Point Terrace (Alice to Brugger streets). Street grind and repave to eliminate potholes. Completed Oct. 7, 2024.
  • SW Westwood View (Mitchell Street to Westwood Drive). Base repair to eliminate potholes. Completed Aug. 19 – 22, 2024.

Contact

PBOT Customer Service (by PDX 311)

phone number311Information and Customer Service
phone number503-823-4000Every day, 7 a.m. to 8 p.m. (excluding federal holidays) Interpretation available | Interpretación disponible | Phiên dịch có sẵn | 提供口译服务 | Доступна интерпретация | Tafsiir la heli karo | Доступний переклад
Oregon Relay Service711Oregon Relay Service

Follow on Social Media

Back to top