danger
COVID-19 Risk Level for Multnomah County: High Risk

Construction

Displaying 1 - 6 of 6
Construction begins Summer 2021
Engineering and design
Safer Shoulders is a new program for providing interim pedestrian facilities throughout the city where sidewalk construction is not financially possible.
Construction begins Summer 2021
Engineering and design
This project will build five new pedestrian traffic signals and provide streetlighting on both sides of NE Glisan between NE 82nd to NE 162nd avenues.
Summer 2021
Engineering and design
NE 138th Place Paving: Halsey Street to Sacramento Street is a Fixing Our Streets paving project that will resurface NE 138th between Halsey and Sacramento. The project will also include ADA ramp and crossing improvements.
Summer 2021
Engineering and design
SW Bertha Boulevard Paving: Vermont Street to Beaverton-Hillsdale Highway is a Fixing Our Streets paving project that will resurface SW Bertha Boulevard between SW Vermont Street and Beaverton-Hillsdale Highway. The project will also include traffic calming elements and ADA ramp improvements.
Summer 2021
Engineering and design
N Ida Ave: Lombard to Smith is a Fixing Our Streets paving project that will resurface N Ida Avenue between N Lombard Street and N Smith Street. The project will also upgrade ADA ramps, improve crossings, and complete a small section of sidewalk infill.

Filter by Status

Filter by Year Complete