Construction
Brentwood-Darlington Multimodal Improvements
Transportation
Under Construction
Construction 2024-2025
A Portland Bureau of Transportation (PBOT) project improving access to several Title 1 schools. Includes new sidewalks and crosswalks on SE Duke and Flavel streets, a neighborhood greenway on Knapp/Ogden streets, and a new signalized crossing of SE 82nd Avenue.
NE Cornfoot Road Corridor Improvements (47th Avenue to Alderwood Road)
Transportation
Engineering And Design
Construction will begin in spring of 2024
The Portland Bureau of Transportation (PBOT) will be repaving NE Cornfoot Road from Airtrans Way to Alderwood Road. Upgrade streetlights and install guardrails. A second project phase in 2026 will add a multi-use path on the north side for people walking and biking.
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction in fall of 2024
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
2022 Traffic Signals Superbundle
Transportation
Under Construction
Construction begins spring 2023
New traffic signals at: SW Naito Parkway & SW Whitaker St, SE 52nd Ave & SE Woodstock St, NE MLK Blvd & NE Going St, E Burnside St & SE 16th Ave, SE Washington St & SE 86th Ave, SE 148th Ave & SE Main St, NE Glisan St & NE 113th Ave, plus street lighting on NE Glisan St from NE 82nd-162nd
NE 60th Avenue and Halsey Street Area Improvement Project
Transportation
Engineering And Design
Construction late 2024
Crews and contractors with the Portland Bureau of Transportation (PBOT) will repave, add traffic signals and turn lanes, widen sidewalks, and build bike improvements along NE 60th Avenue and Halsey Street. This will improve traffic flow and make it safer for pedestrians and people biking or driving.
SW Fourth Avenue Improvement Project
Transportation
Engineering And Design
Construction 2024-2025
Crews and contractors with the Portland Bureau of Transportation (PBOT) will reconstruct and repave SW Fourth Avenue between Lincoln and W Burnside streets. Includes safer crosswalks, upgraded ADA curb ramps, new protected bikeway, better street lighting, and a business access and transit lane.
Killingsworth Street Repaving and Safety Improvements
Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Mejoras de seguridad y repavimentación de la calle Killingsworth
Transportación
Ingeniería Y Diseño
–
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard
SE 174th Avenue Sidewalk Infill (Main to Stark streets)
Transportation
Under Construction
In construction
The Portland Bureau of Transportation (PBOT) will oversee construction of a 10-foot concrete sidewalk for pedestrians and people biking on the west side of SE 174th Avenue between Stark and Main streets. Project includes new ADA-compliant curb ramps, marked crosswalks, and street trees.
Brentwood-Darlington Crossroads Safety Project: SE Flavel Street at SE 72nd Avenue
Transportation
Engineering And Design
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.
NE Killingsworth Safer Crossings Project
Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.
Portland Safety Projects - All Roads Transportation Safety
Transportation
Engineering And Design
Construction begins Fall 2024
This project will design and construct traffic signal safety improvements at locations along SE Holgate Blvd, SE Milwaukie Ave, SE Division St, SE Foster Rd., Sandy Blvd., W. Burnside, NW Glisan St., NE Glisan St., SW Beaverton Hillsdale Highway, Broadway/Weidler, SE 102nd, Broadway St.