Construction

Transportation Construction Menu
12 projects found

Killingsworth Street Repaving and Safety Improvements

Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.

NE Killingsworth Safer Crossings Project

Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.