SW Capitol Highway Street Lighting

Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on SW Capitol Highway and 49th from SW Barbur to Stephenson.

NE 105th and Marx Pump Station Project

Sewer and Stormwater
Active
The project is in the design phase. Construction is anticipated to begin in fall 2025 and it will take about 18 months to complete.
Environmental Services is designing a project to upgrade and expand the aging pump station located at NE Marx Street and 105th Avenue in the Parkrose neighborhood. The project will modernize equipment, increase system capacity, and help protect public health and the environment.

SE Holgate Blvd. Crossing Improvements

Transportation
Engineering And Design
Construction Summer 2024
PBOT will be making crossing improvements along SE Holgate Boulevard at 62nd, 87th, 115th and 125th.

NE 42nd Ave Infill: Killingsworth to Holman

Transportation
Engineering And Design
Construction fall of 2023
PBOT will be constructing sidewalks and ADA ramps on the east side of 42nd Avenue between NE Killingsworth Street and Holman Street.

SE Holgate Blvd. Crossings: 103rd, 108th & 112-117th

Transportation
Engineering And Design
Construction Fall 2023
PBOT will be making crossing improvements along SE Holgate Boulevard at SE 103rd and 108th Pl, and sidewalk infill along the south side of Holgate from 112th-117th.

Citywide Sump Repair and Replacement

Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.

North Slabtown Sewer Project

Sewer and Stormwater
Active
Construction is anticipated to begin in Fall 2024 and take up to a year to complete.
Environmental Services is beginning the design stage of the North Slabtown Sewer Project. This project will repair or replace approximately 3,569 feet of aging public sewer pipes throughout your neighborhood. Taking these actions now will help protect public health and the environment.

Hillsdale North Sewer Project

Sewer and Stormwater
Active
Construction is anticipated to begin in March 2025 and may take a year to complete.
Environmental Services is designing a project to repair approximately 8,571 feet (or 1.62 linear miles) of aging public sewer pipes throughout the Hillsdale neighborhood in Southwest Portland. Taking these actions now will help protect public health and the environment.
Construction will begin in summer of 2024
The Portland Bureau of Transportation (PBOT) will build new crossings with signals along NE 122nd Avenue near the intersections with Davis and Clinton streets.
Project design continues. Construction is anticipated to begin in June of 2024 and take up to six months to complete.
Environmental Services is designing a project in the Laurelhurst and North Tabor neighborhoods to repair sewer pipes and construct green street planters to manage stormwater runoff from streets and roofs. This project will relieve basement sewer backup risk and reduce street flooding in the area.
Study completion expected Spring 2024
A feasibility study is underway which will produce market, financial, and operational analyses to determine a sustainable operating plan for IFCC – a plan that is in alignment with the community’s vision.

SE Ivon Street Sewer Extension

Sewer and Stormwater
Active
Construction is anticipated to begin in March of 2024 and take up to five months to complete.
Environmental Services is designing a project to extend the public sewer 180 feet into SE Ivon Street between SE 12th and SE 14th avenues. This will resolve nonconforming sewer connections and provide properties independent connections to the public sewer.

Flanders Connector at NW Naito and Glisan

Transportation
Engineering And Design
Project schedule under development
The Flanders Connector at NW Naito and Glisan seeks to provide a new crossing for pedestrians and people biking at Naito Parkway, connecting Waterfront Park to the Flanders Greenway.

Elk Rock Pump Station Project

Sewer and Stormwater
Active
Design will continue for two years. Construction is anticipated to begin in the spring of 2025.
Environmental Service is designing a project to upgrade the 40-year-old Elk Rock Pump Station, located at the end of S Riverwood Road. Increased pumping capacity will accommodate future demands on the sewer system. Improved reliability and safety will protect public health and the environment.