information
Portland is a Sanctuary City

Find sanctuary city resources from the City of Portland's Immigrant & Refugee Program, including free legal services and state resources for reporting hate crimes, bias incidents, discrimination, and violations of Oregon's sanctuary laws.

Schedule Inspections in Development Hub PDX (DevHub)

Information
This guide outlines steps to schedule inspections in Development Hub PDX (DevHub), the online permitting system for the City of Portland.
On this page

Once your permit is issued, you can use DevHub to:

Use your IVR or your permit number to schedule inspections and get results

Permits are tracked and inspections scheduled in the system using an assigned Interactive Voice Response (IVR) number. Your IVR number is distinct from your permit number. The fastest way to schedule an inspection is to use this IVR number, listed in the lower left-hand corner of your permit. If you are unsure of your IVR number, you can still use your permit number to schedule inspections. 

Viewing, selecting and scheduling an inspection

Sign into DevHub to schedule your inspection. For guidance on how to sign in and access your DevHub user account, please review the DevHub Sign In Quick Step Guide.

Follow these steps to schedule an inspection in DevHub:

  1. Select the Inspections option from the DevHub PDX menu.
This is an image of the entry screen to Development Hub PDX, the City of Portland's online permitting portal, with the "Inspections" button on the left side highlighted.
  1. Search using your IVR number, located at the bottom left corner of your permit.
  2. Verify that the result is the correct permit and click the Select button.
  3. Scroll down to and click the Schedule button next to the inspection you want.
  4. Verify the information entered from your profile.
  5. Choose the inspection date and click Schedule.

Please verify that the information provided is correct and make changes as needed. If you have a lockbox, enter the code in each box. Enter the location of the lockbox and any additional relevant comments in the Message field (for example: dog on-premise).

Once your inspection is scheduled, a confirmation number will be provided.
 

View inspection results

Once an inspector has completed your inspection(s), the results are uploaded and available on DevHub.

Results can be viewed by clicking the Results button. A new tab will open and the inspection report will be generated. View or save the report.
 

Cancel a scheduled inspection

If you wish to cancel a scheduled inspection, open the Inspections Scheduling & Results page, select the Cancel button for the inspection, then confirm the cancellation.

DevHub is available 24 hours a day, seven days a week, except for a small amount of time on first Friday evenings for maintenance. If you have difficulty scheduling an inspection through DevHub, you may also schedule an inspection through the Interactive Voice Response (IVR) system. Staff members can also be contacted during business hours for assistance.

Log into DevHub to schedule an inspection

Contact

General Inquiries

Portland Permitting & Development
phone number503-823-7300The phone is answered Monday through Friday from 8 a.m. to 5 p.m. Please leave a message if you call outside of those hours.
Oregon Relay Service711Oregon Relay Service

Recent news

Back to top