When a W-6 form is needed
This form is required for projects that will involve public water system work and are not paid for through a building permit. The Water Bureau will prepare a fee statement that identifies our cost to provide water service to or perform water work at the site. The fee statement is based on our current water fee schedule.
Steps to complete before submitting your W-6 form
Before submitting the W-6 form, complete the following steps for the type of permit you have. Note: The W-6 form will not be accepted when the associated building permit has not been issued or when the public works permit has not achieved final plan review (90%) approval from all bureaus.
- Building permits
- Verify if your building permit is issued.
- Verify that building permit revisions with changes or impacts to water or fire services are issued.
- Verify that the site utility plan matches the public works permit when applicable.
- If you have a fire line, irrigation service, or a 2" or larger service, verify that your permit has been reviewed for backflow concerns.
- Public works permits
- Verify that your public works permit has final plan approval (90%) from all bureaus.
- Verify the public works permit matches the building permit site utility plan when applicable.
- Land use review
- Verify that you were provided the Water Bureau conditions of approval.
When is additional material required?
If you would like a new water meter, irrigation meter, or new fire service, and you don't have a building permit or your permit didn't need to be reviewed by the Water Available group, then additional material will be required.
- Meter sizing worksheet. Water Available must review and approve proper meter sizing. Complete and submit a W-3, small meter sizing worksheet for 5/8″, 3/4″, and 1″ meters or a W-4, large meter sizing worksheet for 1.5″ meters and larger.
- Site utility plan. Water Available must review and approve the proposed location of water services. Your site utility plan must be scalable and legible, showing all existing and proposed utilities and features, properly labeled, in the right-of-way. Show the whole street (curb to opposite curb) running along the entire length of the property frontage. Include easements, right-of-way lines, property lines, and curb lines (on both sides of the street). Show utilities serving both sides of the street.
- Commercial sample site plan
- Separation requirements
- Water quality backflow review. If you have a fire line, irrigation service, or 2" or larger service, a water quality backflow review will be required.
Note: A missing or incomplete meter sizing worksheet or site utility plan will delay the fee statement request process.
Completing the W-6 form
- Enter the applicant/contact name, contact information, property address and any associated permit number.
- Check the appropriate box or boxes for meter or water service work being requested.
- If you have a fire or irrigation system, enter your system's design flow demand in gallons per minute (gpm). The gpm is required to complete a fee statement for these services. The gpm is determined by your fire or irrigation system designer. The Water bureau will not provide this information.
Methods to submit the W-6 form
- By email to WaterService@portlandoregon.gov
- If you're unable to submit by email, please call 503-823-7368 and select option 5 for other options
Scheduling
The Water Service group will schedule installation for meter upsizes on existing service branches after you have paid all associated fees.
For water service lines, you can schedule the installation two business days after paying your fees.
- For 2” and smaller services please wait 2 business days after payment before contacting wbistateshed@portlandoregon.gov or 503-823-1526. Normal installation time is 3 weeks.
- For 3” and larger services and hydrants contact waterservice
s@portlandoregon.gov or 503-823-7368 (option 5) at least 4-7 weeks in advance of desired installation date to allow time for securing a PBOT Street Opening Permit (SOP) and scheduling installation.
Water fee schedule
Water development fee schedule