Documents
Displaying 1 - 20 of 1151
Printable Information
The daily Pre-Issuance List for Solar, Mechanical (stand-alone), and Residential Deferred Submittals and Revisions.
Posted
Printable Information
This is the list of all permits that are in stage one of permitting, called "intake." This report is updated regularly. For more information search Portland.gov for permit review process.
Posted
Printable Information
The daily Pre-Issuance List for residential and sign permits.
Posted
Printable Information
The daily pre-issuance list for commercial permits.
Posted
Download PDF fileFrom Excess to Access 1015.95 KB
Download PDF fileFrom Excess to Access 1015.95 KB
Printable Information
Your leftover new and reclaimed lumber, fixtures, appliances, doors, windows, and more can help homeowners with low incomes repair their homes. Learn more about this partnership between the City of Portland and the ReBuilding Center.
Posted
Printable Information
The purpose of this administrative rule is to provide guidance on implementing Chapter 24.31 of the Portland City Code (PCC), which governs transient lodging facilities within the City of Portland. The adopted interim rule is effective Jan. 1, 2025, for a period no greater than 180 days.
Posted
Download PDF fileList of FIR Contractors 167.67 KB
Download PDF fileList of FIR Contractors 167.67 KB
Printable Information
List of registered contractors in the Field Issuance Remodel (FIR) Program.
Posted
Printable Information
City of Portland map with names and phone numbers of residential inspectors and where they work.
Posted
Printable Information
Information for homeowners who want to increase livable space in their single family homes by converting an attic, basement or garage or who want to legalize existing space that was converted without permits. Search Portland.gov for more information. Also known as Brochure 9. Updated December 2024.
Posted
Download PDF fileBOD 24-02: Demolition 832.29 KB
Download PDF fileBOD 24-02: Demolition 832.29 KB
Building Official Determination 24-02: answers the questions: Are there any exceptions to the requirement demolition permits for structures with four or fewer residential units to be finaled before a building permit for new construction is issued on the same site? Leave excavations and foundation?
Posted
Printable form
I agree that any costs to obtain site evaluations, site permits, SD permits, site development permits and other onsite wastewater treatment program services provided by the Department of Environmental Quality (DEQ) on the property not satisfied by the Authorized Representative are my responsibility.
Posted
Printable Information
Revised: 4/17/24 Document updated to reflect new bureau name: 8/9/24
Posted
Printable form
This checklist provides an outline of land division application requirements.
Posted
This document provides an overview of the requirements for protecting and maintaining streams, springs, seeps and wetlands that are not located in an established environmental zone. Published 08/31/2018.
Posted
Printable Information
Learn about tracts and easements in this Land Division Information Guide.
Posted
Printable Information
Learn more about when the land division tree preservation requirements apply. Read about exemptions and trees within adjacent rights-of-way. Get information about minimum tree preservation standards, tree preservation approval criteria, submittal requirements and more.
Posted
Posted
Printable Information
This document highlights and summarizes data from a survey conducted June 11 through June 25, 2024, with customers who applied for building and related permits between March 1, 2023, and May 31, 2024.
Posted
See something we could improve on this page? Give website feedback.