Connection Instructions
HEARING REGISTRATION LINK
AGENDA
1. (1:30-1:45)
2. (1:45-2:45)
BRIEFING – North Park Blocks Extension
CITY CONTACT: Gary Datka, Portland Parks & Recreation, 971-288-9230
CITY CONTACT: Benjamin Nielsen, Portland Permitting & Development, 503-865-6519 Benjamin.Nielsen@portlandoregon.gov
3. (2:55-4:25)
EA 25-006951 DA – Broadway Corridor Parcel 4A
APPLICANT: Mark Schmidt | Holst Architecture
SITE: North half of Block 4 (tax lot R709061) at SE corner of NW 9th and NW Johnson
CITY CONTACT: Staci Monroe, PPD, 503-865-6516 staci.monroe@portlandoregon.gov
New 14-story affordable housing development consisting of 229 affordable units with a ground floor program providing an Early Childhood Education Center, Workforce Development center, Property management offices, loading, building utility and amenities. In addition to the required Design Review the proposal would also require a Central City Master Plan Amendment to relocate the loading off of NW 9th instead of NW Irving.
4. (4:35-6:05)
EA 25-013501 DA – Sellwood Bluff Multi-Dwelling Residential
APPLICANT: Kyle Andersen, GBD Architects
SITE: 5515 SE Milwaukie Ave
CITY CONTACT: Ben Nielsen, PPD, 503-865-6519 benjamin.nielsen@portlandoregon.gov
Design Advice Request for a new 7-story, 243 unit, multi-dwelling residential building at 5515 SE Milwaukie Ave. The southern half of the building is 65’-0” tall, and the northern half is approx. 85’-6” tall. The ground floor includes dwelling units with entry porches and planters facing SE Milwaukie Ave and SE Ellis St, with a lobby entry near the center of the building. Parking is provided at the ground level behind these units. The building includes a variety of roof forms and cornice lines strive to break up the massing and create a variety of scale on the elevations. Potential Modifications may be requested to the building setback, landscaping, additional pedestrian connection, required outdoor area, and required common area development standards. River Review may also be required.
LU 24-068824 DZM, RR, AD – Centennial Mills- RESCHEDULED TO A NEW DATE TBD
APPLICANT: Kurt Schultz, SERA Design and Architecture
SITE: 1362 NW NAITO PKWY
CITY CONTACT: Grace Jeffreys, PP&D, 503-865-6521 grace.jeffreys@portlandregon.gov
Type III Design Review hearing for a proposed three building project on the historic Centennial Mills site along the Willamette River in the Pearl Subdistrict of the Central City Plan District. The buildings range from 5 to 6 stories and have basement parking. The project also includes development of the greenway park and trail along the river. The project is mixed use residential with 281 apartment units, retail spaces along Naito, and 174 parking stalls.
Additional reviews include three Modification Reviews (including to size of parking stalls and bike parking spaces) a River Review, and an Adjustment Review (vehicular access along Naito)
Please Keep in mind
- The agenda is subject to change.
- Agenda items may be rescheduled.
- Times are estimates only and agenda item times may change.
- Projects are reviewed in the order listed with a 10 minute break between agenda items.
- All continuances and reschedules are requested by the applicant, unless otherwise noted.
Portland Permitting and Development is committed to providing equal access to information and hearings. To request an accommodation or alternative format of communication, please contact us no later than five business days prior to the hearing at 503-823-7300 (TTY 503-823-6868). Note that Zoom automated captions are used for hearings and may not be as accurate as live captioning; A closed-caption transcript of the meeting may be requested by contacting the PP&D Hearings Clerk at PPDHearingsClerk@portlandoregon.gov.