See something we could improve on this page? Give website feedback.
Get the right forms
For two or more carts (food cart pod)
| Requirement | Form |
|---|---|
Complete the Building Permit Application (this form is used for all food cart pod projects, even if there are no buildings). When we review your application, we will determine which type of permit applies to your project. |
|
Pay System Development Charges (SDCs)
|
Electrical work
A licensed electrician must obtain electrical permits and do the electrical work.
Mechanical work: heating, cooling, and ventilation
Property owners, their representatives, and tenants can do mechanical work themselves in certain situations. However, any contractor must be licensed with the State of Oregon.
Get commercial mechanical permits.
Are you increasing any heating or cooling systems?
When we review your application, we may give you an Energy Efficiency Compliance Form to confirm how you'll meet air barrier and system commissioning requirements.
Plumbing work: water and sanitary sewer services
A licensed plumber must obtain plumbing permits and do the plumbing work.
Does your project increase the number of plumbing fixtures on the project site?
Projects that increase the number of plumbing fixtures (like sinks, water fountains, toilets, spigots) will need the Commercial Meter Sizing Worksheet.
Are you adding, removing, or altering a driveway that connects to the public right-of-way?
Projects that include driveways that connect to the public right-of-way will need a permit for this work. This might include driveways that will no longer be used.
Changing how a building will be used? Repurposing a building?
You'll need a commercial building permit for a change of occupancy. Visit our pages on changing a commercial space.
Will your project dig up the ground?
Use this checklist if your project will dig up ground. You might need to include extra information on your site plan. You might also need inspections to check your work before, during, and after construction.
Will your project affect the sidewalk or streets?
The public right-of-way is shared space that includes streets, sidewalks, planting strips, road shoulders, and alleys.
You will need a permit to prune or remove any tree (or its roots) in the public right-of-way. For more information:
Get help
If you have questions about completing any of these forms, schedule a 15-minute appointment with Commercial Permitting Services.
