A food cart is a mobile unit where food is prepared and sold. The term "food cart" includes all mobile food units such as food trucks, trailers, and vending carts. Vending carts must be on wheels and are typically built on trailers or trucks. Get permits for your food cart or pod.

Get your custom project guide

Finalize your permit

Find out what happens after inspections and how to close out your project.

After your inspections, you can get results in three different ways:

Some common reasons that work doesn’t pass inspection:

  • Incomplete work
  • Code violation
  • The inspector couldn’t access the work

After you’ve made the changes, schedule another inspection using the same method you used before. There’s a reinspection fee after the first reinspection of a single issue.

If you need a re-inspection

If your inspection wasn’t approved, you’ll need to schedule a re-inspection after making the required corrections.

  • Use the same three-digit inspection code.
  • Wait until after 5 p.m. to schedule the re-inspection if you're doing it on the same day the inspector entered the results.
  • You won’t be able to reschedule until the inspector has entered the original inspection results.

You are allowed a certain number of inspections based on the valuation of your work. If you need more inspections than your allotted amount, you’ll have to buy them.

Final phase requirements and inspections

Before scheduling a Final 299 or 999 inspection, complete the following:

Schedule final inspections:

  • 199 - Final Electrical (all devices installed and operational)
  • 399 - Final Plumbing (all fixtures in place and working)
  • 699 - Final Mechanical (HVAC systems complete and functional)
  • 299 - Final Building (Address posted, smoke/CO detectors, handrails, egress, required finishes, decks, etc.)
  • 999 - Final Permit (closes the permit officially)

All permits need the “999 Final Permit” inspection. Your permit will not be approved and closed until you get this inspection. Without the “999 Final Permit” inspection, the permit is still “under inspection.” If a permit is without an approved inspection for more than 180 days, it will expire.