Program Guide: BES installed stormwater retrofits for existing impervious area

Label: Information
As part of the private property stormwater retrofit program, the Bureau of Environmental Services (BES) partners with private property owners to implement rain gardens, mini-drywells, and downspout disconnection.

Purpose

As a part of the private property stormwater retrofit program, the Bureau of Environmental Services (BES) partners with private property owners to implement rain gardens, mini-drywells and downspout disconnection. This program guide provides information on how the rain gardens, mini-drywells and downspout disconnection will be implemented between BES (having local authority for water quality and environmental regulations) and Portland Permitting and Development (PP&D) (having local authority over building and plumbing code).

Applicability

Under the terms of this program guide, PP&D building, site development, and trade permits will not be required for installation of stormwater facilities that meet the program guide specifications. Zoning permits may be required as discussed in this program guide. Other stormwater management systems not covered by the terms of this program guide, such as planters, swales, basins, or large diameter concrete drywells, will require permits to be obtained through PP&D.

Background

The management of stormwater from roofs and other impervious surfaces is a key factor in maintaining and improving the environmental quality of Portland. New development and redevelopment must meet the stormwater requirements and design criteria in the City's Stormwater Management Manual (SWMM). Runoff from impervious surfaces must meet specific standards for discharge to either an on-site stormwater management system or an off-site storm system as approved by PP&D.

Historically, in some portions of the city, stormwater drainage was routed from building and other impervious surfaces directly into the existing combined, storm and/or sanitary sewer systems. As the city has grown, these sewer systems have become overtaxed and are prone to local sewer backups, system overflows into the Willamette River and Columbia Slough, and pollutant transport into surface water bodies. As part of the plan to alleviate system capacity problems and support surface water body pollution reduction efforts, BES implements a stormwater retrofit program in targeted sewer areas. As a part of this stormwater retrofit program, BES partners with private property owners to install rain gardens, mini-drywells and downspout disconnections on private property.

Stormwater Retrofit Program

For eligible properties in areas with identified system need, BES will directly manage the implementation of rain gardens, mini-drywells and downspout disconnections, provided the rain gardens, mini-drywells and disconnected downspouts meet the provisions of this program guide. 

  1. Surface Systems
    1. Rain gardens and downspout disconnection can be installed at existing residential, multifamily or commercial structures to manage up to a total of 5,000 square feet of roof and other impervious area.
    2. Rain gardens that manage more than 5,000 square feet, other stormwater management systems not covered by this program guide, and any stormwater management system that manages runoff from private parking lots will be designed as per the current SWMM and permitted and reviewed through PP&D.
    3. The City review and inspection requirements for surface systems such as rain gardens and downspout disconnections are identified in Table 1.

      Table 1 – Surface Systems
      Stormwater Facility Inspectors
      Rain gardens and associated rain drains, and downspout disconnection managing no more than 5,000 square feet of impervious areaBES1
      Rain gardens managing more than 5,000 square feet of impervious area or that manage runoff from private parking lotsPP&D2
      1BES Stormwater Retrofit Program staff, no permit required.
      2PP&D staff will inspect as part of the standard process for permitting stormwater retrofits.
    4. For commercial properties that meet the program guidelines for implementation, a site plan will be submitted to PP&D planning and zoning staff to clarify any zoning requirements for landscaping and screening. If there are any zoning requirements, a zoning permit will be required to ensure that landscaping and screening standards are met.
  2. Surface System Standards
    Where downspouts are disconnected from the sewer so that stormwater is managed with downspout disconnection(s) or rain garden(s), the following standards must be met:
    1. Disconnected downspouts will be designed to provide adequate area for the water to drain and infiltrate, equal or greater than a 10% ratio of landscape area to roof area (i.e., 500 square feet of roof would need to drain to at least 50 square feet of landscape area) and meet applicable guidelines as outlined in the BES Downspout Disconnection How to Guide.
    2. Rain gardens should be sized to drain within 30 hours after rainfall ceases per the guidance outlined in the SWMM. A minimum of one simple pit infiltration test will be done per project site. Depending on infiltration rates, the rain garden will be sized as per Table 2.

      Table 2 – Rain Garden Sizing per Infiltration Rates
      Infiltration RateSizing Factor
      4 inches or greater per hour6%
      2 inches to less than 4 inches per hour10%
      1.5 inches to less than 2 inches per hour12%
      1 inch to less than 1.5 inches per hour15%
      0.5 inches to less than 1 inch per hour21%
    3. Rain gardens that include an overflow to mini-drywells may be used in areas where site restrictions do not allow for full sizing of a rain garden.
      1. A mini-drywell is a hard plastic chamber manufactured specifically for underground stormwater management. Mini-drywells are placed 1-foot below finished grade and have a 1-foot gravel lens on the sides.
      2. Rain gardens that overflow to a mini-drywell should be constructed with an atrium grate overflow from within the rain garden to the mini-drywell.
      3. The atrium grate overflow must be at an elevation below that of the rain garden escape route.
      4. Rain drains must daylight directly into the rain garden or be piped directly to the mini-drywell.
      5. The center of the mini-drywell must be located at least 5 feet from any property lines along parcels and 8 feet from any basement, crawl or slab foundation, and follow required setbacks as outlined in the current SWMM.
    4. Each facility will be designed with a safe escape route, such as to a driveway, sidewalk, street, parking lot or additional landscape area on the subject property.
    5. Water runoff from the roof may be conveyed to the point of discharge in one of the following manners:
      1. A gutter-grade downspout extension above ground, with or without splash blocks (Gutter-grade materials include aluminum, steel, copper, vinyl and select plastics. Materials such as corrugated black plastic (ADS), roll-out-hose, PVC, dryer hose, swivel or open-trough materials are not considered durable enough to be gutter-grade); or
      2. A downspout extension buried below ground, daylighting into the surface vegetation or other above ground facility, and:
        1. Where located within the 2-feet and 6-feet building foundation setback distance required prior to discharge as defined in #6 below, the pipe must be watertight.
        2. Where located completely below a patio or walkway, the pipe must be composed of cast iron or Schedule 40 ABS, which complies with Sections 701 and 1101 of the Oregon Plumbing Specialty Code and can be positioned at any depth.
      3. A rock-filled drainage channel lined with waterproof sheeting (e.g., 30-millimeter ethylene propylene diene terpolymer (EPDM)) within the 2-feet or 6-feet setback to the building.
    6. A layer of river rock, flagstone(s) or boulder(s) will be installed at the piped point of discharge from the downspout into the rain garden for erosion control and pipe protection. Plastic splash blocks are not allowed.
    7. Each point of discharge must be at least:
      1. 2 feet from any onsite building foundations without a basement,
      2. 6 feet from any onsite building foundations with a basement,
      3. 10 feet from a neighboring building; and
      4. 5 feet from a property line; and
      5. No setback required for property lines adjacent to the right-of-way.
    8. The point of discharge shall be at a location where the property slopes away from the building.
    9. Water must not discharge onto a neighboring property.
    10. Rain gardens will follow the current SWMM setbacks from slope and retaining walls (2025 SWMM Table 2-1 or current SWMM).
    11. Rain gardens will be constructed to a finished depth of between 12 and 18 inches with maximum side slopes of 3 horizontal to 1 vertical and a minimum bottom width of 2 feet. Side slopes of 2 horizontal to 1 vertical or greater may be allowed if erosion control protections are installed to cover 80 percent of the sloped area, such as vegetative cover or large boulders. Percentage of vegetative cover is determined by size of plants at full size or within two planting seasons of establishment, not at time of planting.
    12. Native soils may be amended with compost, soil or sand to improve growing conditions for vegetation. Rain gardens may be topped with mulch to enhance soil moisture, prevent weeds and control erosion; mulch should only be applied above the high-water line and should not be overapplied.
    13. For rain gardens with a ground disturbance of over 500 square feet, erosion control measures will be installed specific to the site and project conditions such as:
      1. Temporary sediment control and prevention of sediment leaving the site;
      2. Gravel or wood ramp construction access entrances;
      3. Pollution prevention activities during construction;
      4. Soil stabilization, including exposed stockpiles and soil disposal; and
      5. Preventing sediment from reaching storm drain and sewer systems.
    14. Rain gardens will be planted with vegetation that meets the vegetation cover standards required by the SWMM and to provide long-term erosion control.
  3. Subsurface Systems and Standards

    Where downspouts are disconnected from the sewer so that stormwater is managed with subsurface systems, the following standards must be met:

    1. Mini-drywells and soakage trenches can be installed at existing residential structures to manage up to 500 square feet of roof per mini-drywell. 
    2. No more than two mini-drywells can be installed in series per catchment area, up to a maximum of 1,000 square feet managed per catchment. A total project catchment area is not to exceed 5,000 square feet managed per project site.
    3. Soakage trenches can be installed at existing residential structures to manage up to 5,000 square feet. The minimum sizing of a soakage trench (footprint) is 25 square feet per 500 square feet of impervious area managed with the following dimensions:
      1. 18 inch depth of rock gallery,
      2. 12 inches of soil cover, and
      3. 2.5 feet minimum trench width.
    4. A minimum of one simple auger infiltration test performed at the depth of the proposed system will be done per project site for any subsurface system installation. A minimum tested infiltration rate of 2 inches per hour is required to ensure adequate sizing and full onsite disposal.
    5. Mini drywell and soakage trench installations will follow setback and sizing requirements as detailed by the simplified approach in the current SWMM.
      1. 8 feet to center of mini-drywell,
      2. 10 feet to center of soakage trench,
      3. 10 feet from neighboring buildings,
      4. 5 feet from property lines and;
      5. No setback required for property lines adjacent to the right of way.
    6. A minimum of 5 feet of vertical separation is required between the bottom of the subsurface facility and seasonal high groundwater.
    7. Subsurface systems will follow the current SWMM setbacks from slopes and retaining walls (2025 SWMM Tables 3-5 and 3-13 or as defined in the current SWMM).
    8. Stormwater runoff from the roof may be conveyed to the point of discharge using cast iron or Schedule 40 ABS pipe, which complies with Sections 701 and 1101 of the Oregon Plumbing Specialty Code.
    9. Direct burial 14 gauge green tracer wire will be installed in the trench from the standpipe to the subsurface system.
  4. Universal Requirements:
    1. To complete the stormwater management system(s), the previous rain drain standpipe from the downspout to the sewer shall be permanently capped or plugged with a rubber cap secured by a hose clamp or a wing nut test plug.
    2. Once complete, the property owner will own the stormwater systems and disconnected downspout(s) and be responsible for ensuring the new system is properly operated and maintained. An operations and maintenance agreement will be recorded against the property's title and deed to describe the required operations and maintenance for the rain gardens, drywells and downspout disconnections, as applicable.
    3. Bureau of Environmental Services publications describe the standards for rain gardens and other stormwater management facilities. More detailed requirements are contained in BES stormwater retrofit publications. Contact BES at 503-823-7740 or visit Environmental Services for information.