informational alert
Portland is a Sanctuary City

BCG 17-11: Drywell Location

Document
Printable information
Building Code Guide 17-11: Drywell Location answers the question: When a drywell is an approved method of stormwater management, can the drywell be located closer than 5’ to a property line and/or closer than 10’ from a building without a plumbing code appeal?
Updated
Back to top