Change of Use or Change of Occupancy

Service
A permit is required to document a change of use or change of occupancy classification of a building, even where no alterations are planned or required by the code. Learn more about change of use or change of occupancy. Includes information for small business owners.
On this Page

What is it?

Before you buy, rent, or lease a site for your business

Please contact us. We can help you find out if:

  • Your proposed use is allowed at the location.
  • Any building or zoning requirements.
  • Any fees charged to offset impact on the City’s infrastructure

Are permits required?

A permit is required to document a change of use or occupancy classification of a building, even where no alterations are planned or required by the code.

Every building is given an occupancy classification when it is built. Each classification has different building code requirements. The requirements relate to the type of hazard or use in the building. 

In a change of use or occupancy, everything is subject to the City zoning code. For example, an old house turning into an office building must follow life safety code requirements (for example, emergency exits) required for a new office building.

Research existing permitted occupancy classifications of a building.

Change of Use 

A change of use happens when a building or a part of a building is used for something different than before.

For example, if a tenant space was used as an office and is now going to be used as a small café, that's a change of use.

Change of Occupancy

Where the change of use moves the space into a different building code occupancy classification, the change of use is also a change of occupancy.

Using the same example, it is a change of occupancy for the space that was used as an office to be used as a child care center. Whether a building is changing occupancy or just changing use, the space will need to address any requirements related to the new use.

Another less obvious example of a change of occupancy is when a restaurant offers seating for less than 50 people and wants to increase the number of seats to 50 or more.


Costs

Permit fees are based on the value of your project. For an estimate of permit fees, please use the online fee estimator, or review the PP&D Fee Schedules.

Systems Development Charges (SDCs)

In addition to building permit fees, the project may be subject to Systems Development Charges. 

SDC fees help offset the impact the project will have on the City’s infrastructure of streets, water, storm and sanitary sewer systems, and parks and recreation facilities. 

Depending on how much the business or project will impact infrastructure, these fees may be significant. 

Contact us to determine what systems development charges may apply to the project.


Time it takes to get a permit

The time it takes to get a permit can vary. 

A simple change of use or occupancy requiring no type of waiver or appeal may go through the permitting system in the standard timeframe, with goals of approximately four weeks for the first review. We need more time to review responses to requests for corrections (or “checksheets”).

If you need special zoning approvals or if there is a complicated building history, it may take several months to get a permit. 

Keep the process simple by sending us a clear building code summary (in the Prepare application requirements section) showing any deficiencies and how they will be addressed. Respond to requests from staff for information as quickly and comprehensively as possible.


Steps to get your permit

Research

Code considerations by scope of work
Scope of workCode considerations
Change of use or occupancy of a buildingCurrent code requirements must be met, including addressing accessibility for new work and removing existing barriers, potential seismic upgrades, potential addition of sprinkler systems, and others.
Change of use or occupancy of a building in certain locationsMay require parking, bike parking, pedestrian amenities and landscaping depending on use and location of property within certain zones.
Alterations with a value over a certain amount specified in the zoning codeMay require upgrades to elements of the site including bike parking, pedestrian connections, pedestrian amenities, landscaping and screening depending on use and location of property within certain zones.
Alterations to exteriorMay require Design Review or Historic Resource Review (land use review) in certain locations or for designated historic buildings.
Change that causes an increase of customers, traffic and/or use of resourcesSystems Development Charges (SDCs) may be assessed.

Accessibility requirements

If the change of use or occupancy involves any remodeling, all new work must meet current accessibility requirements. In addition, state law requires that up to 25% of the value of the total construction costs be spent removing any existing architectural barriers to improve accessibility for disabled persons. Accessibility improvements must be prioritized in the following order:

  1. parking (if there is on-site parking)
  2. accessible route to the entry
  3. accessible entry
  4. restroom improvements

Seismic upgrade requirements

The City’s seismic regulations arrange the building code occupancies into categories, based on relative hazard. The standard for improvements will depend on what the new use or occupancy will be, how much the occupant load will increase and what portion of the building will be changed. Refer to Portland City Code 24.85 for the specific rules.

Zoning code requirements

The zoning code spells out the allowed uses for a property. Building code use and occupancy classifications address the protection of the people using the building. Zoning use classifications focus on the intensity of the use of a property and its impact on surrounding properties. The property’s zone and the use of the property determine specific zoning code requirements. For example:

  • In zones that have a parking requirement, a retail store usually must provide more parking spaces than a warehouse.
  • Changing the use or occupancy of a commercial building to another type of commercial use or occupancy may require additional vehicle and bicycle parking.
  • Changing a house or duplex to a commercial use usually requires improvements to pedestrian facilities and bicycle parking and can also require vehicle parking.

Examples of residential to commercial conversion include changing a house in a non-residential zone to an office use. This also includes changing a house or duplex in a non-residential zone to a short-term vacation rental.  In addition, in cases where the zoning code use classification is not changing, but the value of the work exceeds a predetermined, annually adjusted amount, similar improvements to landscaping, bike parking, pedestrian facilities, and screening may be required. In some areas of the city, changes to the exterior of the building may need design review or historic resource review. For information on any property where you want to change the use, please call the General Inquiries phone number.

Work out of your home without changing the use or occupancy

If you intend to live in your home while operating a small business there, you may not need to get a building permit to change the use or occupancy. If you use your home as your place of work and either one employee does not live in the home, OR up to eight customers per day come to your home, you may get a Home Occupation permit.

If you can’t meet the code requirements - filing appeals and land use reviews

Building Code Appeals: The various construction code requirements that Portland Permitting & Development enforces may be appealed. When you file an appeal, the appeal must clearly show how your proposed alternative provides an equivalent level of fire, life safety, structural, energy conservation or accessibility before it can be approved. 

Land Use Reviews: The zoning code allows for a variety of reviews for a project that can’t meet certain requirements of the zoning code. Land use reviews take longer than building code appeals since public notice is required.

Small Business Empowerment Program

The Small Business Empowerment Program assists Black, Indigenous, people of color business owners and business owners with disabilities recognized by the ADA who have experienced barriers in the review process. Learn more about the Small Business Empowerment Program.

Prepare application requirements

Complete the building permit application

Site plan

Scaled drawings (1" = 10'0", 1/4" = 1'0" or 1/8" = 1'0") are required to show:

  • the size of the building and its location in relation to the property lines and streets relative elevation dimensions to show grade changes on the lot
  • any other structures on the property, paved driveways and parking, and any landscaping
  • include a north arrow on the plan to show its orientation

Floor plan

Scaled drawings (1/4" = 1'0" or 1/8" = 1'0") are required for each level, including basements and storage attics. 

Floor plans must show:

  • the proposed use of each room and the overall room dimensions
  • window sizes and how the windows open
  • the size of exit doors, the direction of door swing, steps at doors, and any glass panels in doors
  • stairways, both inside and outside the building, and their landings

Stair details

  • rise and run of all steps
  • location and height of handrails
  • headroom at the stairs
    • Both handrail height and headroom are measured straight up from the nosing of the stair treads. This information may be provided with clear notes on the floor plans, or separate details.

Cross-section of the building

Cross-section of the building must be provided except where information concerning ceiling heights, insulation, etc., can be shown elsewhere. In addition, the cross section must show the relationship between the grade outside and the interior floor levels.

Building Code Summary

Building Code Summary of the existing structure, showing that it meets all criteria of new construction, and if there are any deficiencies, how these are being remedied, such as corrective construction or an approved building code appeal. See the Building Code Summary Worksheet for information: 

Title 24.85 Seismic Trigger Analysis diagrams of the building showing the baseline occupant load and area summary in 2004 as compared to the current proposed occupant load and mix of uses. 

Who can do the work

A licensed architect must prepare the plans if:

  • the building is over 4,000 square feet; or
  • the overall lowest floor finish to the overall highest overhead finish is over 20 feet; or
  • alterations or repairs will be made that involve structural parts of the building; or
  • there are changes of occupancy; or
  • in circumstances where it is determined by the building official that the work is of a highly technical nature or
  • there may be potential risk to life and/or safety of the structure.

You may find it valuable to hire an architect or a designer to help you with your plans whether or not an architect is required by law. It is important that your architect or designer is familiar with change of occupancy code requirements as well as your type of building and business.

Submit a complete permit application packet

Get permit

Pay fees. We will notify you to pay fees before we issue your permit.

Print your permit. We will notify you when we have issued your permit. Go to DevHub to print the permit, inspection card, and approved plan set and have it on site for our inspector.

Display your permit. Place your permit in a visible location on the project site.

Begin construction.

Schedule Inspections

Inspections are required for a permit to change the use or occupancy, even if no work is required. This confirms the building meets all requirements for the new use or occupancy classification. 

The permit expires if 180 days pass without an approved inspection. We may grant a permit extension

If we inspect and approve the job, you’ll get a new Certificate of Occupancy for your records. Get more information about requesting inspections.

Need help? Schedule a 15-minute appointment

If you have questions about change of use or occupancy, please schedule a free 15-minute virtual meeting with a construction, zoning or development expert.