Project Update - Community Open House #2
Thank you to everyone who attended our second community house on Thursday, June 20, 2024.
If you missed the second open house, you can:
We will share the final draft design for the community's feedback at a third open house meeting in Feburary 2025 (date coming soon!).
Stay Informed and Involved!
We want to keep you in the know! North Park Blocks project news and updates will be provided on this page. Enter your name and contact information on the North Park Blocks Project Contact List and we will also include you in an email update every time we post a project update.
The City of Portland ensures meaningful access to City programs, services, and activities to comply with Civil Rights Title VI and ADA Title II laws and reasonably provides: translation, interpretation, modifications, accommodations, alternative formats, auxiliary aids, and services. To request these services, contact 503-823-2525, or for Relay Service or TTY: 711.
503-823-2525 (Translation and Interpretation) | Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या | 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad | Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas
Project Advisory Committee (PAC)
Amy Adams, Andrew Plambeck, Angie Garner-Sinjeokov, Bill Truncali, Catherine Garvin, Chris Freeman, Christine Chin Ryan, Christopher Espersen, Erik Swanson, Keith Jones, Laquida Landford, Paul Park, Scott Strickland, Shei'Maka (BeUtee) As-Salaam.
Project Overview
The North Park Blocks were dedicated to the City in 1869 and is one of the oldest parks in Portland. Currently, the blocks cover NW Park Avenue from SW Ankeny Street to NW Glisan Street.
The project will expand the North Park Blocks further north, with a focus on two sites/three blocks detailed below. It will result in a design for three additional park blocks and construction of improvements to the “PNCA Block” – the first block north of the current Park Blocks.
Site 1: PNCA Block
- This is an approximately 30,000 square foot parcel between NW Glisan and Hoyt Streets.
- It is managed by Portland Parks & Recreation and is currently leased to Willamette University’s Pacific Northwest College of Art (PNCA) for parking and display space for Lee Kelly’s sculpture, Memory 99.
- When complete, this park will be the catalyst block between the historic North Park Blocks and the future Broadway Corridor and Green Loop developments.
- Site 1 will be designed and constructed as part of this project.
Site 2: Broadway Corridor Park Parcels
- This a 2-acre site spanning two full blocks from NW Hoyt to NW Johnson Street.
- This park site will support the future development of the Broadway Corridor neighborhood and the Green Loop Corridor.
- In 2019, Prosper Portland completed a five-year master planning process for the Broadway Corridor, which included a multi-bureau development plan for the parcels encompassing the former United States Postal Service (USPS) downtown distribution center.
- In accordance with the Broadway Corridor plan, Portland Parks & Recreation will develop a 30% complete design and engineering package for the park parcel which includes this two-block section of the Green Loop.
- Construction will occur at a later phase of development (timeline TBD).
The goals of the project include:
- provide a cohesive, signature park that balances the needs of the neighborhood with those of the greater region
- offer compelling recreational amenities as well as areas for respite and contemplation in an urban park setting,
- increase the urban tree canopy, using a mix of tree species and sizes adapted to our changing climate and urban context, and
- engage the community in a transparent and equitable process to ensure community participation in a meaningful way.
The designs for the new park blocks may include amenities such as gathering and picnic spaces, flexible recreational spaces and courts, skate spots, and overhead shade structures. It is anticipated that the regional multi-use Green Loop corridor will connect to a future bridge abutment within the most northern park blocks. These new parks will be centered in a dense, urban, mixed-use development within the central city.
The specific elements will be determined through the planning and community engagement process, with consideration of who lives, works, and plays near the park today and who may in the future.
Project Background
The 2019 Broadway Corridor plan included these new Park Blocks as part of the required open space. The Plan also developed the conceptual route of a public, off-street bicycle and pedestrian multi-use path known as the Green Loop that is envisioned to connect the North Park Blocks to the Broadway Bridge and continue on to the Lloyd District on the east side of the Willamette River.
In 2022, the City of Portland committed to an Intergovernmental Agreement (IGA) between Prosper Portland, Portland Parks & Recreation, and the Portland Bureau of Transportation in order to create the Broadway Corridor and Green Loop design and design/construct the PNCA block.
Project Schedule
Design Concept and Community Engagement
Fall 2023 - Winter 2023/24 - Project Set-Up, Contracting, Project Advisory Committee Recruitment
Winter 2023/24 - Fall 2024 - Community Engagement and Planning/Design Process
Project Advisory Committee Meeting Notes
Community Engagement Meeting #1 - February 29, 2024
Community Engagement Meeting #2 - June 20, 2024
Community Engagement Meeting #3 - Fall 2024 (Date TBD)
Construction Documents, Permitting, Construction, and Completion
Winter 2024/25 - Winter 2025/26 - Construction Documents, Permitting and Contracting
Spring 2026 – Summer 2027 - Construction of "PNCA" Block
Fall 2027 - Anticipated Opening Date