News

Displaying 1 - 3 of 3

Investing in our future

This year, after finishing design and getting critical permits, the Water Bureau took the next big step and began construction of the Bull Run Filtration Projects.

Blog post


Preparing for the future: Enhancing our system’s resilience to wildfire with filtration

At the Water Bureau we’re always looking to the future and proactive ways to ensure our drinking water stays safe and plentiful. The new filtration facility is a key step to enhance our supply resilience to wildfire and extreme weather events.

Blog post


Midway through Bull Run Filtration design

The Portland Water Bureau is midway through design of the planned water filtration facility and pipelines and on track to begin delivering filtered Bull Run water in September 2027.

Blog post