Construction
Powellhurst Place
Rental
Open
Spring 2024
Northwest Housing Alternatives' Powellhurst Place development will create 65 units for low-income families and those exiting homelessness in the Powellhurst-Gilbert neighborhood.

Signalized School Route Crossings
Transportation
Under Construction
In Construction
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
Alder 9
Rental
Under Construction
Summer 2025
Related Northwest and Centro Cultural are partnering to develop 159 units of affordable housing in Portland’s Central Eastside serving families and seniors exiting homelessness.

Grand Avenue Riser Stabilization Project
Sewer and Stormwater
Active
Construction is anticipated to begin in April of 2025 and take up to a year to complete.
Environmental Services is constructing a project to stabilize soils at six maintenance hole risers located along Grand Avenue between NE Davis Street and SE Market Street. Crews will inject a material into the ground that will stabilize the soil and prevent more settlement.
NE Sacramento-Knott Neighborhood Greenway: NE 122nd Ave - NE 162nd Ave
Transportation
Engineering And Design
Construction planned for 2026
A new neighborhood greenway on NE Sacramento and other local streets between 122nd and 162nd. This project will reduce speeds and add wayfinding signs and pavement markings to connect the Parkrose Heights, Russell, and Wilkes neighborhoods

Parkrose Neighborhood Greenway
Transportation
Closeout
Construction Spring 2024
The Portland Bureau of Transportation (PBOT) created the Parkrose Neighborhood Greenway to establish low-stress neighborhood streets that are great places to walk, bike, and roll. The greenway connects the Parkrose Neighborhood on NE 115th Ave and on NE Skidmore Street.

N Delaware Neighborhood Greenway: N Sumner St to N Terry streets
Transportation
Open While Under Construction
Under construction in Fall 2024
The Portland Bureau of Transportation (PBOT) will create the N Delaware Greenway to establish low-stress neighborhood streets that are great places to walk, bike, roll, and play.

South Macadam Avenue water main replacement
Water
In Planning
Project Dates Pending
The Water Bureau is investing in reliable water supply in South Portland. We will replace 980 feet of water main (pipe) and two hydrants on South Macadam Avenue between South Bancroft Street and South Lane Street.

N Going and Greeley Sewer Project
Sewer and Stormwater
Active
This project is finalizing the design and will construct in two phases. Phase One as soon as mid-summer 2025 and Phase Two in the fall of 2026.
Environmental Services is finalizing the design of a project to install new pipes, and repair and replace aging public sewer pipes along N Going, Greeley, Humboldt, and Delaware Street at Madrona Park. Replacing and repairing the aging and damaged sewer pipes will protect public health.
Garden Park Estates
Rental
Under Construction
Winter 2026
Innovative Housing, Inc. will renovate and expand the existing Garden Park Estates, creating and preserving 117 units for low-income households in Southeast Portland’s Powellhurst-Gilbert neighborhood.

Red Electric Trail
Parks
In Planning
Design work begins Fall 2022
This project will create design and construction drawings to build a western segment of the Red Electric Trail, from SW Shattuck Road to SW Cameron Road. The trail will eventually connect to PBOT's recently constructed bridge within the eastern edge of the trail.
Tanner Trunk Sewer Project
Sewer and Stormwater
Active
Construction is complete.
Environmental Services has completed a project to replace 800 feet of large-diameter brick sewer pipes located in Highway 26 south of Washington Park. These repairs were necessary to maintain reliable sewer service and protect public health and the environment.
W Burnside Street at St. Clair Avenue Pedestrian Crossing
Transportation
Engineering And Design
Fall 2025
This project will add a pedestrian crossing with a signal on W Burnside Street at St. Clair Avenue.

HollywoodHUB
Rental
Under Construction
Early 2027
BRIDGE Housing will develop hollywoodHUB to add 222 units of affordable, transit-oriented housing for families and individuals in the Hollywood neighborhood.

Tistilal Village
Rental
Open
December 2024
Tistilal Village, owned by NAYA Family Center, will be redeveloped as 57 units of affordable housing with culturally specific services for Native American families in Portsmouth.

North Bradford Sewer Project
Sewer and Stormwater
Active
Construction is currently expected to begin as soon as March 17, 2025. Work will be completed in phases with periods of inactivity from time to time ranging from a few days to a few weeks. It will take up to five months to complete all work.
Environmental Services is designing a project to abandon a deteriorated sewer pipe under North Bradford Street between Burlington and Richmond Avenues and reroute all private connections to adjacent streets. Taking these actions now will help prevent sewage releases and improve future maintenance.
Cesar Apartments
Rental
Partially Open While Under Construction
June 2025
Home Forward has deployed Metro Housing Bond funds to acquire this 47-unit building to convert into Permanent Supportive Housing for those exiting homelessness. The building can be converted with minimal changes, and is expected to house PSH residents beginning in June 2025.

North River Sewer Project
Sewer and Stormwater
Active
Construction is currently expected to begin as soon as March 31, 2025. Work will be completed in phases with periods of inactivity from time to time ranging from a few days to a few weeks. It will take up to five months to complete all work.
Environmental Services is designing a project to replace deteriorating sewer pipe under North River Street between Albina and Interstate avenues. Taking these actions now reduce the possibility of costly breaks, leaks, blockages and sewage releases to buildings, streets, streams, and rivers.
Mason/Skidmore Neighborhood Greenway Project
Transportation
Under Construction
Coming in Spring 2025
The Mason/Skidmore Greenway will be a new east-west neighborhood greenway connecting to existing north-south greenways at NE 37th Avenue, NE Cully Blvd, and NE 77th Avenue.
Safety improvements near Cleveland High School (SE 26th Ave and Powell Blvd)
Transportation
Under Construction
October 2022 - TBD
Short-term and long-term safety improvements by the Portland Bureau of Transportation (PBOT) near and around Cleveland High School at SE 26th Avenue and Powell Boulevard. Working in tandem with partners at the Oregon Department of Transportation (ODOT), TriMet, and Portland Public Schools.