View and download documents related to the Federal Energy Regulatory Commission (FERC) relicensing process for the Portland Hydroelectric Project (PHP).
Draft License Application
CUI-CEII (report filed with FERC as privileged)
CUI_CEII P-2821 DLA Exhibit F Appendix A (report filed with FERC as privileged)
CUI-Privileged P-2821 DLA Exhibit E Special Status Species Figures (report filed with FERC as privileged)
Initial Study Report (ISR)
CR-01 Archaeological Resources Survey (report filed with FERC as privileged)
Study progress reporting
Study Plan Determination
Revised Study Plan
Proposed Study Plan
Relicensing Section 106 consultation
Scoping resources
Relicensing Notice of Intent (NOI) and Pre-Application Document (PAD)
Updated Dec. 11, 2023
- Foreword
- Introduction and Background
- Process Plan, Schedule, and Consultation
- Project Location, Facilities, and Operations
- Description of Existing Environment and Resource Impacts
- Preliminary Issues and Studies
- Relevant Comprehensive Plans
- Summary of Contacts
- References
- Appendices