From Dec. 13-19, the Homelessness and Urban Camping Impact Reduction Program:

  • Received 1853 new campsite reports, including 734 reports of people living in vehicles
  • Received reports about 246 active campsites, accounting for duplicate reports about the same locations
  • Assessed approximately 416 campsites, engaging with people living there, collecting garbage and biohazardous materials, and coordinating with service providers
  • Cleaned 19 campsites, removing only identified garbage and biohazardous materials
  • Removed 11 campsites that posed a risk to health and safety, safely storing campers' personal property 

Summary

  • Campsite reports received: 1853
  • Active campsites reported: 246
  • Campsite assessments: 416
  • Campsites cleaned: 19
  • Campsites removed: 11

Due to COVID-19, the Impact Reduction Team has revised its campsite removal protocols

See all campsite locations reported last week.

See all campsite locations reported during the last 12 weeks.

A map shows the geographic sections of Portland: Northwest, Southwest, Southeast, Northeast and North.

North Portland

The Impact Reduction Team cleaned the following sites:

  • N Failing and N Interstate
  • N Monroe and N Mississippi

The Impact Reduction Team cleaned and removed the following sites:

  • I-5 near N Tillamook and N Flint
  • BES Pollution Control Lab
  • N Columbia Blvd and N Columbia Way Loop

Based on health and safety criteria, the following locations have been posted for removal:

  • Peninsula Crossing Trail N Fessenden to Columbia (to be re-posted in early January)

Northeast Portland

The Impact Reduction Team cleaned the following sites:

  • NE 3rd and NE Hancock 
  • NE 33rd and NE Sunderland

The Impact Reduction Team cleaned and removed the following sites:

  • Peace Park and NE Lloyd
  • NE Everett Grand to MLK
  • NE 102 to NE 106 and NE Wasco (near Gateway Discovery Park) (a)

Based on health and safety criteria, the following locations have been posted for removal:

  • NE 16th and I-84 Eastbound
  • NE 42nd and Lombard

Southeast Portland

The Impact Reduction Team cleaned the following sites:

  • SE  9th and SE Yamhill
  • SE 8th and SE Clay
  • SE 82nd and SE Clinton
  • I-205 Multi-Use Path and Powell
  • SE Knapp (x2)
  • Near 4403 SE 9th

The Impact Reduction Team cleaned and removed the following sites:

  • SE 73rd and SE Harold
  • SE 40th and SE Belmont (a)

Based on health and safety criteria, the following locations have been posted for removal:

  • SE Division St under SE Grand/MLK
  • SE 19th and SE Division 
  • SE 79th between SE Tibbetts and SE Franklin
  • SE 60th and SE Powell
  • SE 6th and SE Ivon
  • Near 1515 SE Water
  • SE Oak between SE Cezar Chavez and SE 37th
  • SE 3rd between SE Ask and SE Ankeny 
  • SE Ash from SE 2nd to SE 3rd 

Southwest Portland 

The Impact Reduction Team cleaned the following sites:

  • SW 1st and SW Washington
  • SW Montgomery from SW 12th to SW 13th 
  • S Caruthers Pedestrian Tunnel

The Impact Reduction Team cleaned and removed the following sites:

  • SW 18th and SW Mill
  • Tunnel by S Grover St
  • W Burnside and SW 14th

Based on health and safety criteria, the following locations have been posted for removal:

  • S Harbor and S Harrison
  • SW 1th from SW Clay to SW Mill

Northwest Portland

The Impact Reduction Team cleaned the following sites:

  • NW 23rd and NW Vaughn
  • NW 6th and NW Davis
  • near 210 NW Broadway

The Impact Reduction Team cleaned and removed the following sites:

  • NW 16th and NW Raleigh

Based on health and safety criteria, the following locations have been posted for removal:

  • NW Vaughn onramp to I-405
  • NW 2nd and NW Glisan