Construcción
Hazel Heights
Rental
Open
Winter 2018
Hazel Heights is Central City Concern’s 153-unit affordable housing development in Hazelwood.
Hawthorne East Apartments
Rental
Open
Fall 2016
At Hawthorne East in inner Southeast Portland, Northwest Housing Alternatives has preserved 70 affordable homes for seniors and adults with special needs.
Gladstone Square / Multnomah Manor
Rental
Open
Winter 2018
Home Forward renovated Gladstone Square and Multnomah Manor, two family-focused properties in Northeast and Southeast Portland, to preserve affordable housing and prevent the displacement of low-income households.
Carolyn Gardens
Rental
Open
Summer 2018
Our Just Future renovated Carolyn Gardens to preserve 12 units of affordable family housing in Hazelwood.
Orchards of 82nd
Rental
Open
Spring 2019
Rose CDC’s Orchards of 82nd, a 48-unit housing project and multicultural community space, addresses gentrification and displacement in Southeast Portland’s Jade District.
East Burnside
Rental
Open
Spring 2018
The Portland Housing Bureau purchased the 51-unit East Burnside Apartments after completion and is operating the building, located in the Hazelwood neighborhood, as regulated affordable housing.
72Foster
Rental
Open
Spring 2019
REACH CDC developed 72Foster to bring 101 units of affordable intergenerational housing to Southeast Portland.
Louisa Flowers
Rental
Open
Fall 2019
Home Forward’s mixed-use, 240-unit Louisa Flowers project, located in the amenity-rich Lloyd District, is the largest affordable housing building completed in Portland in five decades.
Mt. Scott Community Center Seismic Retrofit and Expansion Project
Parks
In Planning
Completion expected in 2025
Portland Parks & Recreation (PP&R) is preparing to rehabilitate and expand Mt. Scott Community Center (MSCC) to better serve current and future generations of Portlanders. The existing Mt. Scott pool and gymnasium will remain as is, along with the popular indoor skating rink.
The Ellington
Rental
Open
Fall 2018
The Portland Housing Bureau purchased and renovated the Ellington, converting its 263 market-rate units to dedicated affordable housing for families in the Madison South neighborhood.
Magnolia II
Rental
Open
Winter 2020
Magnolia II by Innovative Housing, Inc. adds 50 units of affordable housing to the Eliot neighborhood, with priority given to displaced or longtime residents of North/Northeast Portland through the City’s Preference Policy.
Bull Run Filtration Construction Activity
Water
Engineering And Design
2019-2028
The Portland Water Bureau is building a new water filtration facility and pipelines that will be key components of a more resilient water system. The filtration facility and pipelines are needed to meet federal and state drinking water regulations and will be in operation by Sept. 30, 2027.
Washington Park South Entry
Parks
Engineering And Design
Expected Grand Opening May 2024
Construction began February 2023 and is anticipated to continue until April 2024. During this time visitors to Washington Park should expect changing traffic patterns, short delays, and an excellent experience in the Park.
Sellwood Sewer Extension Project
Sewer and Stormwater
Active
Construction for this project is anticipated to begin in April 2024 and take up to two years to complete.
Environmental Services is designing a sewer project to extend the public sewer system throughout the Sellwood-Moreland neighborhoods. This work is part of the City’s effort to provide property owners a way to directly and independently connect to the sewer system to meet current plumbing code.
NE 122nd Ave RFFA Crossing Improvements Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave RFFA Crossing Improvements project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2024
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.
70s Neighborhood Greenway: SE Flavel to NE Sacramento
Transportation
Under Construction
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction TBD
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
NE Cornfoot Road Corridor Improvements (47th Avenue to Alderwood Road)
Transportation
Engineering And Design
Construction will begin in spring of 2024
The Portland Bureau of Transportation (PBOT) will be repaving NE Cornfoot Road from Airtrans Way to Alderwood Road. Upgrade streetlights and install guardrails. A second project phase in 2026 will add a multi-use path on the north side for people walking and biking.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
¿Ves algo que podríamos mejorar en esta página? Dar retroalimentación sobre el sitio web .