78 de proyectos encontrados
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.

SW Main-Taylor Sewer Project

Sewer and Stormwater
Active
Construction is expected to be completed in May.
Environmental Services has nearly completed a project to repair 10,765 feet, or two miles, of aging public sewer pipes in downtown Portland. Having provided 100 to 150 years of service, pipes require repairs to reduce risks of basement flooding and sewage releases to downtown buildings and streets.
Construction is anticipated to occur in the spring of 2024, perhaps in May..
Environmental Services will construct a sewer service lateral repair in SW Washington Street. The repair, now planned for the spring of 2024, will help prevent backups into buildings and streets.
Construction is almost complete and is in the final stages of restoration.
Environmental Services constructed a project that installed and upsized public sewer pipes, as well as constructed green street planters, within the Ladd’s Addition neighborhood. These improvements increase sewer capacity, relieve sewer backups, and reduce street flooding.
The project is currently in design. Construction is anticipated to begin in the summer of 2024 and take up to six months to complete.
Environmental Services is designing a project to replace approximately 450 feet of public sewer pipe and install a sanitary lift station on S Terwilliger Boulevard just north of S Northgate Avenue. Unstable ground conditions pose a risk of the pipe failing. This project will address this.
Construction completed Spring 2024
The Portland Bureau of Transportation (PBOT) updated the street design of NE 148th Avenue from NE 146th Drive to NE Halsey Street. PBOT modified how space is allocated on NE 148th Avenue to reduce speeding and improve the street crossing at NE Sacramento Street.