informational alert
Portland is a Sanctuary City

Add Bulk Fuel Terminal Capacity Reduction Regulations Code to reduce Critical Energy Infrastructure Hub fuel storage by 2036 in support of hazard mitigation (add Code Chapter 17.112)

Label: Ordinance
Amended by Council

The City of Portland ordains.

Section 1. The Council finds:

  1. The City has authority to adopt regulations to protect and promote public health.
  2. The State of Oregon and the greater Pacific Northwest are vulnerable to powerful subduction zone earthquakes that occur periodically along the Juan de Fuqua and North American plates.
  3. In the past, both the Huu-ay-aht First Nation peoples and the Makah tribe shared stories of lost land and peoples as a result of these earthquakes and tsunamis, which scientific research has matched with Japanese tsunami records and on-the-ground geologic field research to reconstruct the Cascadia earthquake of 1700. This research shows that subduction zone earthquakes have occurred along the Pacific Northwest with relative regularity over the last 10,000 years, and if averages from past events are predictive, the region could be overdue for another powerful subduction zone earthquake.
  4. Fuels stored in areas subject to natural hazards, such as liquefaction, wildfire and landslides, pose risks to safety, public health, and livability, including mobility of people, freight, and other commercial vehicles.
  5. The Critical Energy Infrastructure (CEI) Hub in northwest Portland consists of eleven (11) bulk fuel terminals and the area is subject to multiple natural hazards, including liquefiable soils, wildfire and landslides.
  6. The CEI Hub, which consists of Oregon's primary liquid fuel storage and distribution facilities, receives 90 percent of the state's liquid fuel supply either via pipeline or marine vessel. Most of the fuel storage tanks within the CEI Hub were built before seismic design requirements in Oregon's building codes were adopted in 1993.
  7. The facilities that comprise the CEI Hub are vulnerable to failure in the event of subduction zone earthquake. A 2012 Oregon Department of Geology and Mineral Industries (DOGAMI) Earthquake Risk Study for Oregon's Critical Energy Infrastructure Hub report states that a magnitude 8 or 9 Cascadia Subduction Zone earthquake would impact the CEI Hub with: ground shaking; liquefaction; lateral spreading; landslides; and bearing capacity failures. The study also notes that, at the time, only three existing storage tanks were known to have addressed liquefaction vulnerabilities.
  8. The Portland Bureau of Emergency Management's Mitigation Action Plan (2021) identifies how natural hazard events like floods, landslides, and earthquakes might affect the City of Portland. The Portland area has experienced numerous earthquakes in the past, ranging from Magnitude 4.5 to 9.0. Portland is expected to experience seismic events in the future.
  9. Most of Portland's industrial districts, especially those areas with river access, are located in areas with a high probability of soil liquefaction, as documented by the 2018 DOGAMI Earthquake Regional Impact Analysis, during an earthquake. Fuel storage and associated transloading infrastructure pose considerable risks in the event of a major earthquake as documented by the Portland Bureau of Emergency Management's 2016 Critical Energy Infrastructure Hub Study; the 2012 DOGAMI Earthquake Risk Study for Oregon's Critical Energy Infrastructure Hub report; the 2019 Portland State University Critical Energy Infrastructure Hub Fuel Tank Seismic Assessment, and the 2022 Multnomah County/City of Portland Impacts of a Cascadia Subduction Zone Earthquake on the CEI Hub.
  10. The Portland Bureau of Emergency Management's 2021 Mitigation Action Plan identifies how natural hazard events like floods, landslides, and earthquakes might affect the City of Portland. The Portland area has experienced numerous earthquakes in the past, ranging from Magnitude 4.5 to 9.0. The plan defines mitigation as "actions to reduce potential hazard effects or risk."
  11. Tribal communities in Oregon have expressed the importance of protecting the river, a life sustaining and sacred water. They have shared their support for efforts to reduce risks associated with the storage of fuel in natural hazard areas near the river and the related threats to human health, cultural heritage, and environmental quality.
  12. Regulating and reducing the quantity of fuel storage capacity in a natural hazard area will mitigate the risk to the surrounding community, industrial district, the Willamette River, and Portland as a whole.
  13. The Bulk Fuel Terminals (BFT) Capacity Reduction Regulations mitigate risk by advancing the City's understanding of fuel storage conditions and reducing fuel storage capacity in the CEI Hub. The regulations balance risk reduction from fuel storage in a natural hazard area with the need to allow for the continued supply of Oregon's fuel. These regulations in conjunctions with other city and state regulatory requirements can help reduce risk from the terminals and support increased safety and resilience for the community and environment.
  14. The BFT Capacity Reduction Regulations feature:
    1. Inventory requirements to establish existing storage capacity, and understand material storage conditions and trends in usage and needs;
    2. Storage tank capacity reductions by December 1, 2036;
    3. Inventory verification processes, including public notification and opportunity for comment;
    4. Process and fines for violations;
    5. Establishment of a CEI Hub Mitigation Improvement Sub-Fund for receipt of any violation penalties for use toward impact mitigation investments; and
    6. Establishment of administrative fees to cover staff costs of implementation. Administrative fees are required for the processing and verification of the required inventories and for a possible appeal of an inventory's verification. The fees are based on an estimate of the number of staff hours required to complete the work and the billing rates of the staff assigned to complete the work.
  15. On June 3, 2026, a draft version of the Title 17 BFT Capacity Reduction Regulations report was released for public review and public comments were accepted through June 30, 2026. BPS received over fifty (50) written public comments submitted through the Map App.
  16. On August 17, 2026, the Bulk Fuel Terminal Capacity Reduction Regulations—Amendments to City Code Title 17, dated August 2026, was released for public review.
  17. On September 16, 2026, the Finance and Governance Committee of the Whole held a hearing on the Bulk Fuel Terminal Capacity Reduction Regulations—Amendments to City Code Title 17, dated August 2026, and invited public testimony.
  18. The City Council held a hearing on the Bulk Fuel Terminal Capacity Reduction Regulations—Amendments to City Code Title 17, dated August 2026, on October 21, 2026, and invited public testimony.
  19. The City Council finds that large bulk fuel terminals at the CEI Hub represent a risk to people, property and the natural environment that the City Council finds as a compelling reason to limit future risk by requiring documentation of fuel storage tank status, materials stored, and fill levels to have as complete a picture as possible of BFT operations and reducing the future fuel storage tank capacity at existing terminals. Reducing fuel storage capacity at BFTs in a moderate- to high-risk area will mitigate the risk to the community, environment and economy.
  20. The Council recognizes that there is a need for an actual reduction in demand for liquid fuel. Therefore, it is incumbent on the City to do what it can to reduce demand. Accordingly, Council expresses our commitment to work with the PCEF committee and other stakeholders to ensure that in the next Climate Investment Plan we bring our investments in transportation more in line with the 40% of emissions coming from the transportation sector, and increase the percent of Portland Clean Energy Fund dollars spent on transportation measures to promote transit, biking, walking, transition to electric cars, and the reduction of diesel emissions.
  21. Bulk Fuel Terminal Capacity Reduction Regulations—Amendments to City Code Title 17, dated August 2026, are not intended to implement the Comprehensive Plan, apply regardless of whether there is a pending land use application, and are consistent with the City's interest and authority in protecting public health and safety.

NOW, THEREFORE, the Council directs:

  1. Add City Code Chapter 17.112 as shown in Exhibit A.
  2. The City Administrator is authorized to implement procedures and administrative rules as necessary to implement these regulations.
  3. The Bureau of Planning and Sustainability will provide a report to City Council in 2028, 2031, and 2036 on the status of Oregon DEQ Risk Mitigation Implementation Plans (RMIPs), updated fuel demand projections and the capacity reduction program.
  4. The City Administrator shall present a report to Council no later than September 30, 2027, outlining the City's public health and natural hazards risk reduction plan for the CEI Hub. The City Administrator will present an interim update to Council on progress toward this deadline no later than March 31, 2027.
    1. This report must include, at a minimum, prevention, mitigation, and response measures from the Bureau of Planning and Sustainability, Portland Permitting and Development, Portland Bureau of Emergency Management, and Portland Fire and Rescue, such as:
      1. Evacuation plans from Linnton and other affected areas of Northwest Portland;
      2. Evacuation plans from North Portland west of the railroad cut, including at a minimum plans for seismically resilient bridges across the railroad cut;
      3. A proposal for Industrial Firefighting Capacity that can access the broader CEI Hub / Linnton area without the use of infrastructure which is likely to be unusable in the case of a major natural disaster (e.g. bridges across the Willamette River);
      4. A proposal for Fire & Rescue capacity for North Portland west of the railroad cut that can access the area without the use of infrastructure likely to be unusable in the case of a major natural disaster (e.g. sufficient capacity for the area at Fire Station 22);
      5. A proposal for emergency supplies and resources (e.g. BEECN, NETs) needed for all areas that may be affected by various disaster scenarios involving the CEI Hub.
  5.  City Council recognizes that the risk posed by the CEI Hub to Portland communities will not be fully mitigated by this proposal by 2036. Council commits to continued engagement with CEI Hub terminal operators, the Oregon Department of Energy, the Oregon Department of Environmental Quality, and community stakeholders, and directs that the status of this continued engagement be included in each of the Bureau of Planning and Sustainability's annual reports to Council, alongside updates on RMIP status and fuel demand projections. Council further commits to continue working to reduce the total fuel stored at the CEI Hub and reduce risk to Portland over the coming decades, beyond the requirements established by this ordinance. Council will continue stakeholder engagement after 2036. 
  6.  The City Administrator shall submit to Council an initial draft available for public comment no later than June 30, 2027 and an updated draft to City Council by September 1, 2027, recommendations for replacement approaches to the fuel reduction program based on the data that the bulk fuel terminals report to the City by March 31, 2027. 

Section 2. If any section, subsection, sentence, clause, phrase, diagram, designation, or drawing contained in this Ordinance, or the plan, map or code it adopts or amends, is held to be deficient, invalid or unconstitutional, that shall not affect the validity of the remaining portions. The Council declares that it would have adopted the plan, map, or code and each section, subsection, sentence, clause, phrase, diagram, designation, and drawing thereof, regardless of the fact that any one or more sections, subsections, sentences, clauses, phrases, diagrams, designations, or drawings contained in this Ordinance, may be found to be deficient, invalid or unconstitutional.

Impact Statement

Purpose of proposed legislation and background information

The purpose of the proposed regulations is to support risk reduction and management in the CEI Hub by requiring bulk fuel terminals to reduce their storage capacity by at least 20 percent by December 1, 2036. The CEI Hub is a six-mile stretch of land in northwest Portland located along the Willamette River. It contains facilities that store and distribute fuels as part of a supply chain critical to Oregon's fuel infrastructure, with more than 90 percent of the state's liquid fuel supply stored at and passing through the CEI Hub via pipeline, barge, or rail. Numerous studies have found that the concentration of bulk fuel terminals in the CEI Hub presents significant risks, primarily due to the CEI Hub's location on land with a high risk of liquefaction. In the event of a major earthquake, particularly a Cascadia Subduction Zone (CSZ) event, storage tanks in the CEI Hub are likely to fail, releasing fuel and other hazardous materials. Such a disaster would pose serious threats to human health and to the environment, including waterways, air quality, and adjacent natural areas. The fuel storage reduction percentage specified in these regulations is based on the City's understanding of existing storage capacity across the 11 terminals in the CEI Hub and how fuel demand is projected to change over time.

Financial and budgetary impacts

This project does not amend the budget, change staffing levels, reclassify staff, or authorize new spending or other financial obligations (IGAs, contracts, etc.) and therefore there are no financial or budgetary impacts to the City. The amendments will result in additional workload for BPS staff to process and verify the inventories of bulk fuel terminal storage capacity. Staff estimates that processing and verifying each inventory will cost $10,000. The amendments include establishment of a fee to cover the estimated costs associated with the increased staff work.

Economic and real estate development impacts

How was the proposed legislation shared with those potentially impacted? How much time did they have to provide input?

  • The project included outreach to a broad range of stakeholders, including Bulk Fuel Terminal operators, fuel industry organizations, the Working Waterfront Coalition, the Portland Metro Chamber, public agencies, Tribal governments, community and neighborhood organizations, environmental groups, labor representatives, and members of the public.
  • Beginning in Spring 2025, the project team began connecting with wide variety of stakeholders, including Bulk Fuel Terminal operators and related fuel industry organizations. Many of these stakeholders participated in multiple rounds of public input, including concept development discussions in Summer 2025, providing comments on alternatives in the Discussion Draft in September 2025, and providing testimony to the Planning Commission in December 2025 and January 2026. 
  • The concept of a storage capacity reduction program emerged from community feedback during the Discussion Draft phase of the CEI Hub Policy Project but was not developed into draft Title 17 regulations until Spring 2026. At that time, BPS staff re-engaged with a broad range of stakeholders, including Bulk Fuel Terminal operators and related fuel industry organizations, to review the proposed implementation framework. The draft regulations were available for public comment in June 2026, and the City provided information sessions and an online comment portal to support stakeholder review and feedback.
  • The engagement included small group meetings, one-one-one meetings and email exchanges in response to specific questions.
  • Appendix A of the Title 33 Amendments Recommended Draft and the Community Engagement section in the Title 17 Bulk Fuel Terminal Capacity Reduction Regulations report include a detailed summary of the public engagement activities.

What feedback was shared? How did it shape the proposed legislation?

  • Strong community support for a storage capacity reduction requirement, but stressing need for the reduction to be greater than 20 percent and to begin sooner than 2036. BPS balanced these requests with concerns about maintaining adequate fuel supply and operational flexibility. Based on the available fuel demand analysis, the proposed regulations retain the 20 percent reduction by 2036.
  • Several stakeholders questioned whether sufficient operational data existed to support establishing a 20 percent reduction requirement. In response, the proposed regulations were revised to require Bulk Fuel Terminal operators to report three years (2024–2026) of throughput data as part of the baseline inventory requirements (Section 17.112.070.A.3.c).
  • Strong concerns from the Port of Portland and other stakeholders that the Title 17 reduction requirement could constrain aviation fuel supplies. In response, the proposed regulations exempt in-service storage tanks used exclusively for aviation fuel from the reduction requirement (Section 17.112.060.C).
  • Strong community concerns about the near- and long-term risks to the community and environment from not reducing fuel storage at the CEI Hub. This testimony reinforced support for including a fuel storage capacity reduction requirement as part of the proposed regulations while balancing those objectives with the need to maintain projected fuel supply.
  • Strong concerns from state agencies, the Port of Portland, other Oregon cities and business groups about potential widespread economic impacts from the proposed amendments and need for further analysis on economic impacts. Since the Planning Commission recommendation, the City commissioned an independent economic impact analysis from ECOnorthwest (ECO) to independently review the Parametrix fuel demand model and to provide an additional economic assessment to understand how fuel prices might impact Oregon's economy. ECO produced two memos: 1) a review of the fuel demand model; and 2) an analysis of the impact of incremental fuel price increases on Oregon's economy. The findings of the memos identify uncertainty in key assumptions. BPS has recognized that uncertainty and has used more conservative assumptions as a hedge against that uncertainty. Given the available data, ECOnorthwest finds that a potential outcome is that the proposed regulations will not impact the price of fuel. In addition, they note that storage capacity is not the sole factor in determining fuel supply or price impacts. There are other factors that impact fuel prices and there remains uncertainty, especially due to the lack of available data, about what, if any, impact the regulations may have on fuel prices.
  • NW Natural raised concerns that the reduction requirements would not be feasible for its regulated utility operations. In response, the proposed regulations exempt regulated public utilities from the storage capacity reduction requirements (Section 17.112.060.A).

What types of business and/or development projects might be affected and how could business and/or development activity by impacted?

  • The proposed legislation primarily affects existing Bulk Fuel Terminal uses by requiring a 20 percent reduction in in-service fuel storage capacity by 2036. Existing bulk fuel terminals may need to modify future capital investment plans, take fuel storage tanks out of service, or adjust terminal operations to comply with the new regulations. However, the proposed regulations are intended to allow existing terminals to continue operating while providing operational flexibility. The reduction requirement applies only to in-service fuel storage capacity and includes exemptions for regulated public utilities, breakout tanks, aviation fuel storage, and additional storage capacity approved through a Title 33 Fuel Storage Tank Capacity Transfer Review or Aviation Fuel Storage Expansion Review. The regulations do not apply broadly to other industrial uses and do not change underlying industrial zoning or Comprehensive Plan land use designations. Other industrial and commercial uses can continue to develop under existing zoning and development standards and are not expected to be directly impacted.

How does this action influence the timeline and cost of doing business or real estate development in Portland as compared to peer cities?

  • One concern raised by fuel industry representatives and the broader business community was whether requiring a 20 percent reduction in in-service fuel storage capacity could constrain fuel supplies and indirectly increase the cost of doing business in Portland. To evaluate this issue, the City reviewed multiple sources of information on existing and future fuel demand, including historical fuel consumption trends from the U.S. Energy Information Administration (EIA), fuel demand forecasts prepared by the EIA and the Oregon Department of Energy (ODOE), and project-specific Oregon fuel demand modeling prepared by Parametrix, all of which are described in the Economic Impact Analysis section of the CEI Hub Policy Project Recommended Draft and the Title 17 Bulk Fuel Terminal Capacity Reduction Regulations Draft. Collectively, these analyses indicate that petroleum fuel consumption has remained relatively flat or declined over recent decades and is projected to decline over the long term. Building on these national and statewide forecasts, the Parametrix model evaluated whether the CEI Hub would continue to have sufficient storage capacity to meet projected fuel demand following the proposed 20 percent reduction in in-service fuel storage capacity. The model indicates that, after the required reduction, projected fuel demand remains within the CEI Hub's estimated storage and annual throughput capacity through the planning horizon, with estimated utilization increasing from approximately 81 percent today to approximately 96 percent in 2036. Aviation fuel is the primary exception to the overall declining demand trend, with demand projected to increase over time. As a result, the proposed regulations exempt aviation fuel storage from the reduction requirement to help accommodate those projected needs. Based on the available information, the City does not expect the proposed reduction in in-service fuel storage capacity to constrain projected fuel supply or materially affect the overall cost or timeline of business in Portland relative to peer cities. 
  • NW Natural, whose Portland facility primarily serves as a peak-demand natural gas facility during periods of high winter demand, raised concerns that a mandatory storage capacity reduction would not be compatible with the operation of its facility, which relies on a single large liquefied natural gas (LNG) storage tank. In response, the proposed regulations exempt regulated public utilities from the storage capacity reduction requirements.
  • Existing Bulk Fuel Terminal operators may incur compliance costs associated with reducing in-service fuel storage capacity, taking fuel storage tanks out of service, and modifying future investment plans. Additional operational costs are also possible if reduced storage capacity requires more frequent fuel replenishment or other changes to terminal operations. However, the extent of any such costs is difficult to evaluate because information on key operational constraints is not publicly available. The proposal does not change industrial zoning, reduce the supply of industrial land, or change development standards applicable to most commercial and industrial businesses.

How would the proposed legislation impact business competitiveness and job growth, affordability, costs of goods, and/or household income?

  • One concern raised by fuel industry representatives and the broader business community was that requiring a 20 percent reduction in in-service fuel storage capacity could reduce fuel supply, increase fuel prices, and thereby affect business competitiveness, the cost of goods, and household expenses. The City does not expect those outcomes based on the available information. To evaluate this issue, the City reviewed historical fuel consumption trends from the U.S. Energy Information Administration (EIA), fuel demand forecasts prepared by the EIA and the Oregon Department of Energy (ODOE), and project-specific Oregon fuel demand modeling prepared by Parametrix, all of which are described in the Economic Impact Analysis section of the Title 33 Amendments Recommended Draft and the Title 17 Bulk Fuel Terminal Capacity Reduction Regulations report. Collectively, these analyses indicate that petroleum fuel consumption has remained relatively flat or declined over recent decades and is projected to decline over the long term. Building on these national and statewide forecasts, the Parametrix model projects that overall Oregon liquid fuel demand remains relatively stable over approximately the next decade before declining through 2050, indicating that the CEI Hub's existing storage capacity is expected to remain sufficient to meet projected fuel demand without additional fuel storage capacity. Aviation fuel is the primary exception to this trend, but the proposed Title 33 regulations include a limited allowance for aviation fuel storage capacity expansions to address projected increases in aviation fuel demand and the Title 17 regulations exempt aviation fuel storage from the reduction requirement. The Parametrix model shows that even after implementation of the proposed 20 percent reduction in in-service fuel storage capacity, the CEI Hub is expected to retain sufficient storage to meet projected Oregon fuel demand through to 2050. Based on the available information, the City does not expect the proposed reduction in in-service fuel storage capacity to constrain projected fuel supply or materially affect business competitiveness, affordability, costs of goods, or household income through fuel price increases.
  • The independent review by ECONW concluded that the Parametrix analysis provides a necessary starting point for evaluating future storage needs while also identifying uncertainties that prevent definitive conclusions about potential fuel price impacts. Specifically, the review found that storage capacity alone is unlikely to determine future fuel prices. Instead, price impacts would more likely depend on operational and market factors, such as the costs associated with increasing throughput and potential risk premiums associated with reduced operational flexibility, for which sufficient data were not available. As a result, the available analyses do not indicate that the proposed storage capacity reductions would necessarily result in higher fuel prices, although they also cannot rule out that possibility if operational constraints prove to be more limiting than assumed. 
  • Historically, employment in bulk fuel terminal uses has been relatively stable, accounting for approximately 1,300 jobs, or about 0.3 percent of Portland's total employment. The proposed regulations do not change industrial zoning or reduce the City's industrial land supply. As a result, the proposed legislation is not expected to materially affect Portland's long-term job growth.
  • The regulations are also intended to reduce long-term economic risk associated with the concentration of fuel storage in a seismically vulnerable area. A 2022 study by ECOnorthwest found that a major Cascadia Subduction Zone earthquake could result in substantial fuel releases, environmental damage, disruptions to regional fuel supply, and societal costs estimated in the hundreds of millions to billions of dollars. While those avoided costs cannot be quantified as direct economic benefits of the proposed regulations, reducing exposure to catastrophic losses is an important policy objective underlying the proposal.

How might this proposed legislation impact real estate development project feasibility and housing production?

  • The proposed legislation is not expected to impact housing production or the feasibility of residential or mixed-use development projects because it applies only to existing Bulk Fuel Terminal useslocated on industrially zoned land. The proposal does not amend residential zoning or increase development requirements for housing, nor does it change underlying industrial zoning or reduce Portland's supply of industrial land.

How might potential adverse impacts from this proposed legislation be mitigated?

  • The proposed legislation was developed to reduce seismic and environmental risk while preserving the reliability of critical fuel infrastructure. To mitigate potential operational impacts, the capacity reduction requirement includes several exemptions and allowances.
  1. The reduction requirement does not apply to in-service storage tanks that exclusively store aviation fuel as of January 1, 2027. This exemption was included in response to testimony regarding projected growth in aviation fuel demand.
  2. The reduction requirement does not apply to regulated public utilities or to tanks used exclusively as surge or breakout tanks associated with interstate pipelines that are regulated by the Federal Pipeline and Hazardous Materials Safety Administration.
  3. Any additional storage capacity approved through a Title 33 Fuel Storage Tank Capacity Transfer Review or Aviation Fuel Storage Expansion Review is exempt from the reduction requirement.
  4. The regulations limit only the total amount of in-service fuel storage capacity at each terminal. They do not dictate the number or configuration of storage tanks, allowing terminal operators to reconfigure existing storage capacity into different sized tanks over time to respond to market needs.
  5. The ordinance requires periodic reports to City Council in 2028, 2031, and 2036 on implementation of the program, including updates on fuel demand projections and other relevant information. These reports provide opportunities to evaluate changing conditions and consider whether adjustments to the program are warranted.
  • While the proposed regulations reduce in-service fuel storage capacity, they do not regulate fuel throughput or fuel volumes. Bulk fuel terminals therefore retain flexibility to manage fuel inventories and throughput in response to changing operational needs and market conditions.

Community impacts and community involvement

Community Impacts: The regulations will impact communities located near the CEI Hub and will impact bulk fuel terminals in the CEI Hub. The benefits accrue to both the communities located near and the terminals located in the CEI Hub by reducing the risks associated with a major disaster in the area. The fuel storage reduction percentage specified in these regulations is based on the City's understanding of existing storage capacity across the 11 terminals in the CEI Hub and how fuel demand is projected to change over time. The City engaged Parametrix Consulting to project fuel demand overtime. The modelling found that fuel demand will remain relatively stable in the near-term before declining in the long term. The capacity reduction timeline included in the regulations has been calibrated so that projected fuel demand can continue to be accommodated even under the proposed reduction. In this way, an potential negative impacts of a reduction in fuel storage capacity have been mitigated.

Community Involvement: The draft BFT Capacity Reduction Regulations were published in early June 2026, and staff engaged the community as follows:

  • Two online information sessions for the public to learn more and ask questions. One will be scheduled during the workday and the other in the evening.
  • An online Map App with project information, portal to provide written comments, and opportunity to view the written comments of others. 
  • A project website provided an overview of the draft BFT Capacity Reduction Regulations and links to extensive background information.
  • A focused informational meeting with community and environmental organizations that had been engaged in the CEI Hub Policy Project community outreach events.
  • Presentations to groups as invited and available.
  • A project email to a list of community and other interested parties. The email provided an additional opportunity to ask questions of staff or provide written comments.

Staff expect that City Council will hear testimony from community and neighborhood organizations, industry and industry-related business organizations, individuals who live in proximity to the CEI Hub, environmental organizations, and others.

100% renewable goal

This project does not increase or decrease the City's total energy use, nor does it increase or decrease the City's renewable energy use.

Economic and real estate development analysis

Analysis provided by Prosper Portland

Prosper Portland staff has reviewed the Economic and Real Estate Development Impact Analysis submitted for this action and finds that it satisfies the requirements set forth in City Council Resolution 37664. The analysis is sufficiently detailed and complete to be considered a final statement for purposes of this action.

Document history

Document number: 2026-312

Agenda Council action
Time certain
City Council
Continued
Oral record is closed.
Written record will close October 1, 2026 at 12:00 pm.
Continued to October 1, 2026 at 2:00 pm time certain.
Time certain
City Council
Continued as amended
Motion to amend the ordinance and Exhibit A as shown in Green/Pirtle-Guiney/Kanal/Clark/Koyama Lane 2: Moved by Green and seconded by Koyama Lane.

Councilor Clark requested to divide the question to vote on Amendment 2 separately from Amendments 1, 3, 4, and 5.

Vote called on Amendment 2-Remove Aviation Fuel Exemption: (Aye (6): Green, Avalos, Kanal, Pirtle-Guiney, Koyama Lane, Morillo; Nay (6): Clark, Zimmerman, Smith, Ryan, Novick, Dunphy). Motion failed to pass.

Vote called on Amendments 1-Directive for alternative approaches, 3-Inventory and Reporting Requirements, 4-Penalties, and 5-Continued engagement: (Aye (10): Clark, Green, Avalos, Smith, Kanal, Pirtle-Guiney, Koyama Lane, Morillo, Novick, Dunphy; Nay (2): Zimmerman, Ryan)

Motion to amend the ordinance as shown in Novick 1: Moved by Novick and seconded by Clark. Vote not called.

Item continued as amended to October 7, 2026 at 10:00 am time certain.
Time certain
City Council
Passed to second reading as amended
Motion to amend the ordinance as shown in Novick 1: Moved by Novick and seconded by Clark. Motion withdrawn.

Motion to amend the ordinance as shown in Novick 4: Moved by Novick and seconded by Clark. (Aye (8): Clark, Green, Zimmerman, Kanal, Pirtle-Guiney, Ryan, Morillo, Novick; Nay (4): Avalos, Smith, Koyama Lane, Dunphy)

Motion to amend the ordinance as shown in Kanal 1: Moved by Kanal and seconded by Clark. Motion withdrawn.

Motion to amend the ordinance as shown in Kanal 2: Moved by Kanal and seconded by Clark. (Aye (10): Clark, Green, Zimmerman, Avalos, Kanal, Pirtle-Guiney, Koyama Lane, Morillo, Novick, Dunphy; Nay (2): Smith, Ryan)

Passed to second reading as amended November 5, 2026 at 2:00 pm time certain
View written testimony

Document number

2026-312

Introduced by

Contact

Tom Armstrong

Supervising Planner, Planning and Sustainability

Agenda type

Time certain

Date and time information

Meeting date
Requested start time
02:00 pm
Amount of time requested
30 minutes
Confirmed time certain
Changes City Code