53 projects found
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.

70s Greenway: Cully Connector

Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Fall 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.

Irving Park Stormwater Project

Sewer and Stormwater
Active
Nature patch work was completed in February 2021. Construction of the rain gardens and green street planters is expected to be complete by the end of March 2024.
Environmental Services and Portland Parks & Recreation are collaborating on a project to build nature patches and rain gardens to manage stormwater in Irving Park. The project will help prevent nearby flooding, sewer basement backups, and sewage overflows into the Willamette River during storms.

South Portland-Burlingame Sewer Project

Sewer and Stormwater
Active
Construction began in June 2023 and will take up to a year and a half to complete.
Environmental Services is constructing a project in the South Portland and South Burlingame neighborhoods that will repair approximately 7,108 linear feet of aging public sewer pipes, that are on average 90 years old. This will help protect public health and the Willamette River Watershed.

Cully Neighborhood Street Improvement Project

Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
Construction: Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland by paving gravel streets, adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
Design has been completed. Construction is expected to begin in April or May of 2024 and should take about six months to complete.
Environmental Services, in partnership with the Portland Water Bureau, has completed design on a project to upgrade infrastructure in NW Portland. This project will increase system capacity, reduce the risk of sewer discharges, and improve earthquake resilience for our critical infrastructure.

Hillsdale Middle Sewer Project

Sewer and Stormwater
Active
Construction is anticipated to begin in Summer 2024 and will last a year.
Environmental Services is in the design phase of the Hillsdale Middle Sewer Project. This project will repair or replace approximately 11,897 feet of aging public sewer pipes throughout the neighborhood. Taking these actions now will help protect public health and the environment.

NE 6th Drive Pump Station Project

Sewer and Stormwater
Active
The project is starting construction and will take about two years to complete.
Environmental Services is constructing a project to expand and remodel the 44-year-old NE 6th Drive Pump Station in the East Columbia neighborhood. The upgrades will modernize equipment, increase system capacity, and protect public health and the environment.