Construction
Transportation
Construction July 2020 - January 2021
Under construction
The Springwater Connector project will connect the north-south 70s and 80s Neighborhood Greenways with the Springwater Corridor Trail.
Transportation
Construction in 2021
Engineering and design
PBOT is constructing a pedestrian and bicycle crossing on SW Naito Parkway at SW Whitaker Street.

Transportation
Construction 2023
In planning
The 60s Greenway in Cully will add a new northern segment to the recently completed 70s Greenway that currently ends at NE Klickitat Street.
Transportation
Construction planned for 2022
Engineering and design
This project will provide safe routes to several Title 1 schools and access to transit in a neighborhood with very poor sidewalk coverage by adding sidewalk and constructing a greenway.

Transportation
Construction in phases Spring 2018 to Summer 2021
Under construction
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.

Transportation
Construction Fall-Winter 2021
Engineering and design
The Portland Bureau of Transportation is constructing a new earthquake-ready bridge to fill the gap between the Holman Neighborhood Greenway and the upcoming 47th Ave protected bikeway, while providing better access for freight, walking, and biking.

Transportation
Construction late 2020 and early 2021
Engineering and design
The Portland Bureau of Transportation (PBOT) will make improvements to NE 55th and NE 57th Avenues and NE Killingsworth Street through this Local Improvement District.
Transportation
Construction August 2020 - May 2021
Under construction
This project will add a walkway on NE 60th Avenue between NE Prescott Street/Cully Boulevard and NE Lombard Street (formerly known as NE Portland Highway).

Construction planned to begin 2022
Engineering and design
The Portland Bureau of Transportation (PBOT) will construct safety improvements such as crossing improvements, sidewalk infill, upgraded curb ramps, buffered bike lanes, widened multi-use paths, and more along NE Halsey Street.

Water
November 2023 to February 2025
In planning
The Water Bureau will construct a new 175,000-gallon water storage tank in Forest Park. The new tank is part of a broader effort to increase the amount of water available on Portland's west side for firefighting and earthquake preparedness.

Spring 2021 to Summer 2022
Engineering and design
The Water Bureau is planning to replace 4,800 feet—just under a mile—of an aging water main (pipe) along SE Lambert and 19th Ave. The existing main was installed in 1927, and has had six breaks in the last ten years. This new pipe will make your water service more reliable and improve water quality.

Transportation
Construction Spring 2021 (tentative)
Engineering and design
This project will install a new traffic signal on SE 52nd Avenue at SE Woodstock Street.
Transportation
Construction 2020-2021
Under construction
This project upgrades a number of street crossings throughout South and Southwest Portland.

Construction Summer 2021
Engineering and design
The Portland Bureau of Transportation (PBOT) is constructing bike lanes on SW 35th Avenue by reorganizing the road. The project is funded by Fixing Our Streets and is identified in the Southwest in Motion plan.

Transportation
Construction Fall 2021
Engineering and design
This project includes two areas of sidewalk infill where sections of the sidewalk network are missing. Corners in both areas within the project improvements will be brought up to current ADA standards.
Ongoing
Active
On September 4, 2019 City Council heard a Report from Procurement on the Regular Agenda to accept the Guaranteed Maximum Price of $978,978 from McKinstry to implement Phase 1 of the ESPC and enter into the Design-Build Contract for Phase 1 work.

Transportation
Construction Fall 2019 to Fall 2020
Under construction
NE 47th Avenue from north of Columbia Boulevard to south of Cornfoot Road was one of Portland’s most deteriorated road segments. The Portland Bureau of Transportation (PBOT) is completely reconstructing the road, adding multiuse paths on both sides of the street for pedestrians and people biking.

Parks
Expected opening date: Fall 2022
In planning
Thanks to funding from System Development Charges, Parklane Park will be expanded from 5 acres to 25 acres.

Transportation
Construction planned for Spring 2021
Under construction
The Portland Bureau of Transportation (PBOT) will enhance the NW Johnson Neighborhood Greenway and NW Marshall Neighborhood Greenway to create low-stress neighborhood streets that are great places to walk, bike, roll, and play.

Transportation
Construction will begin in 2021
In planning
The Portland Bureau of Transportation (PBOT) will construct signalized crossings at SE Davis Street and SE Clinton Street on SE 122nd Avenue.