98 projects found
Construction completed in spring/summer 2025.
The Portland Bureau of Transportation (PBOT) will be improving the walkability of NE Alameda St by installing ~250 ft of sidewalk, redesigning the intersection of NE 77th Ave, installing 8 new ramps, and marking new crosswalks as part of PBOT's Safe Routes to School.
Construction to be completed in winter/spring 2025.
Design and implement a safe crossing for bicyclists and pedestrians at SE 52nd Ave to make connections to the existing Gladstone Neighborhood Greenway.

SW 19th Bike Lanes- SW Barbur Blvd to SW Spring Garden St

Transportation
Engineering And Design
Construction date TBD
This PBOT project will restripe the road on SW 19th Ave from SW Spring Garden St to SW Barbur Blvd to install bike lanes on both sides of SW 19th Ave.
Construction set to be completed in summer 2024.
Design and implement a neighborhood greenway along SW Ridge Drive and SW Wilbard Street between SW 35th Drive and SW Taylors Ferry Road. Project by the Portland Bureau of Transportation (PBOT).

SE 89th Avenue & Taylor Street Local Improvement District

Transportation
Engineering And Design
Late 2024
This Local Improvement District (LID) will construct street and sidewalk improvements on portions of SE Taylor Street and SE 89th Avenue next to Berrydale Park.

NW Reed Drive Local Improvement District

Transportation
Engineering And Design
Summer 2024
This Local Improvement District (LID) will construct street improvements on NW Reed Drive west of NW 83rd Place to the western terminus of the right-of-way.
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.

NE Killingsworth Safer Crossings Project

Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.

Rosa Parks & Greeley: Crossing & Signal, N

Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.