Construction
NE 102nd Avenue Corridor Safety Project: NE Weidler to NE Sandy
Transportation
Under Construction
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
NE 122nd Ave RFFA Crossing Improvements Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave RFFA Crossing Improvements project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
70s Neighborhood Greenway: SE Flavel to NE Sacramento
Transportation
Under Construction
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2025
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.
East Glisan Street Update: NE 102nd to 162nd Avenues
Transportation
Under Construction
Construction in phases Spring 2018 to Summer 2024
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.
Brentwood-Darlington Multimodal Improvements
Transportation
Under Construction
Construction 2024-2025
A Portland Bureau of Transportation (PBOT) project improving access to several Title 1 schools. Includes new sidewalks and crosswalks on SE Duke and Flavel streets, a neighborhood greenway on Knapp/Ogden streets, and a new signalized crossing of SE 82nd Avenue.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
NE Cornfoot Road Corridor Improvements (47th Avenue to Alderwood Road)
Transportation
Engineering And Design
Construction will begin in spring of 2024
The Portland Bureau of Transportation (PBOT) will be repaving NE Cornfoot Road from Airtrans Way to Alderwood Road. Upgrade streetlights and install guardrails. A second project phase in 2026 will add a multi-use path on the north side for people walking and biking.
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction in fall of 2024
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
2022 Traffic Signals Superbundle
Transportation
Under Construction
Construction begins spring 2023
New traffic signals at: SW Naito Parkway & SW Whitaker St, SE 52nd Ave & SE Woodstock St, NE MLK Blvd & NE Going St, E Burnside St & SE 16th Ave, SE Washington St & SE 86th Ave, SE 148th Ave & SE Main St, NE Glisan St & NE 113th Ave, plus street lighting on NE Glisan St from NE 82nd-162nd
SE Washington St Sidewalk Infill Project- SE 80th Ave to SE 82nd Ave
Transportation
Engineering And Design
Construction scheduled for fall 2024.
The Portland Bureau of Transportation (PBOT) is installing new curbs ramps, sidewalk along the south side of SE Washington St from SE 80th Ave to SE 82nd Ave and installing a new sump. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).
Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Multimodal Missing Links
Transportation
Active
The Portland Bureau of Transportation (PBOT) is building immediate connections and safety improvements in Portland's pedestrian, bicycle, transit, and traffic calming networks.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
NE Tillamook-Hancock Neighborhood Greenway Enhancement Project (Phase II): NE 28th to NE 62nd avenues
Transportation
Under Construction
Construction in phases beginning in 2021
The Portland Bureau of Transportation (PBOT) is constructing a series of design changes on the Tillamook-Hancock Neighborhood Greenway between NE 28th and NE 62nd avenues. Phase 1 from N Flint to NE 28th was completed in 2019.
NE 60th Avenue and Halsey Street Area Improvement Project
Transportation
Engineering And Design
Construction late 2024
Crews and contractors with the Portland Bureau of Transportation (PBOT) will repave, add traffic signals and turn lanes, widen sidewalks, and build bike improvements along NE 60th Avenue and Halsey Street. This will improve traffic flow and make it safer for pedestrians and people biking or driving.
NW/SW 20th Ave Neighborhood Greenway: Raleigh to Jefferson
Transportation
Under Construction
Phase 2 construction completion awaiting building construction to finish.
This project will improve conditions pedestrians and people biking by reducing vehicle speeding, reducing auto traffic volumes, upgrading crossings of busy streets, and creating new connections to existing bicycle and pedestrian infrastructure on or near SW and NW 20th Ave.
70s Greenway: Cully Connector
Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
SE Foster-Woodstock Couplet
Transportation
Engineering And Design
Construction 2024
This project comprises Phase Two of the Lents Town Center Improvements. It will address long-deferred roadway maintenance needs as well as provide safety improvements for all modes of transportation.
Jade and Montavilla Multimodal Improvements Project
Transportation
Engineering And Design
Construction 2024
The Portland Bureau of Transportation (PBOT) will construct improvements on key pedestrian and bicycle routes in the Jade District and Montavilla neighborhood, connecting various neighborhood hubs in Southeast Portland.
See something we could improve on this page? Give website feedback.