Construction
Willamette River Crossing construction updates
Capital Improvement Project
Engineering And Design
2016 through 2030
Timing has changed for implementation of the final phases of design and construction for the Willamette River Crossing project.
Bull Run Filtration Construction Activity
Water
Engineering And Design
2019-2028
The Portland Water Bureau is building a new water filtration facility and pipelines that will be key components of a more resilient water system. The filtration facility and pipelines are needed to meet federal and state drinking water regulations and will be in operation by Sept. 30, 2027.
Fulton Pump Mains Replacement
Capital Improvement Project
Engineering And Design
Fall 2024 to Fall 2025
The Water Bureau will install 3,350 feet of water main (pipe) in southwest Portland. The pipes are aging and pass underneath the I-5 freeway and SW Barbur Boulevard, where a failure of these older pipes could cause major problems. This project will benefit over 42,000 people served by the main.
North Jantzen Avenue water main construction
Water System Improvement Construction
Engineering And Design
Winter 2022 to Summer 2024
We will replace approximately 2,200 feet of water main (pipe) with earthquake-resilient pipe. We will also replace five existing fire hydrants and install one new fire hydrant. This project will bring existing water services and backflow devices at several properties up to current City code.