41 projects found
Study completion expected Spring 2024
A feasibility study is underway which will produce market, financial, and operational analyses to determine a sustainable operating plan for IFCC – a plan that is in alignment with the community’s vision.

Red Electric Trail

Parks
In Planning
Design work begins Fall 2022
This project will create design and construction drawings to build a western segment of the Red Electric Trail, from SW Shattuck Road to SW Cameron Road. The trail will eventually connect to PBOT's recently constructed bridge within the eastern edge of the trail.

Inverness System Planning Project

Sewer and Stormwater
In Planning
This project is in the planning phase. Planning and analysis will continue through the summer of 2024.
The Inverness pump station and force main system (The Inverness System) is nearing the end of its service life, and is in need of repair or replacement. This project will choose a preferred solution for repair and/or replacement that protects public health and the environment.

Kenton Priority Outfalls Plan

Sewer and Stormwater
In Planning
Planning work is expected to continue through early 2024.
Environmental Services is developing the Kenton Priority Outfalls Plan. This planning effort will protect public health and the environment by identifying ways to reduce pollutants in stormwater entering the Columbia Slough.