Construction
Jade and Montavilla Multimodal Improvements Project
Transportation
Engineering And Design
Construction 2024
The Portland Bureau of Transportation (PBOT) will construct improvements on key pedestrian and bicycle routes in the Jade District and Montavilla neighborhood, connecting various neighborhood hubs in Southeast Portland.
NE 97th Avenue and Couch/Davis Street Local Improvement District
Transportation
Engineering And Design
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.
SW Fourth Avenue Improvement Project
Transportation
Engineering And Design
Construction 2024-2025
Crews and contractors with the Portland Bureau of Transportation (PBOT) will reconstruct and repave SW Fourth Avenue between Lincoln and W Burnside streets. Includes safer crosswalks, upgraded ADA curb ramps, new protected bikeway, better street lighting, and a business access and transit lane.
Lair Hill Neighborhood Traffic Access Management Project
Transportation
Engineering And Design
Implementation Test Winter 2019 to Summer 2020
This nine-month pilot project reduced cut-through traffic in the Lair Hill area south of downtown, keeping regional car traffic heading east on the Ross Island Bridge on safer routes. The project limited through-traffic on narrow residential streets from Dec. 16, 2019 through Sept. 1, 2020.
Cully Neighborhood Street Improvement Project
Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
Tryon-Stephens Neighborhood Street Improvement Project- SW Capitol Hill Rd
Transportation
Engineering And Design
Construction: Late Winter/Early Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland as part of SW Tryon Stephens Transportation Infrastructure Charge (LTIC) by paving gravel streets, adding sidewalks or walkways, or a combination.
SW Galeburn: SW Capitol Highway to SW 41st Ave Street Improvement Project
Transportation
Engineering And Design
Construction: Spring 2025
SW Galeburn Street Improvement Project will include paving gravel streets, installing stormwater facilities, and adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
NE 148th Avenue: NE 146th Drive (north of NE Sacramento Street) to NE Halsey Safety Project
Transportation
Closeout
Construction completed Spring 2024
The Portland Bureau of Transportation (PBOT) updated the street design of NE 148th Avenue from NE 146th Drive to NE Halsey Street. PBOT modified how space is allocated on NE 148th Avenue to reduce speeding and improve the street crossing at NE Sacramento Street.
N Suttle Road Local Improvement District
Transportation
Under Construction
Spring 2023 to Summer 2024
The Portland Bureau of Transportation (PBOT) and the Bureau of Environmental Services (BES) are constructing street, sidewalk, stormwater and sanitary sewer improvements on N Suttle Road.
82nd Avenue Critical Fixes: Beech and Ash Crossings
Transportation
Under Construction
Construction 2023 - 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian safety improvements to 82nd Avenue at NE Beech Street and at SE Ash Street.
82nd Avenue Critical Fixes: Street Lighting
Transportation
Under Construction
Construction begins June 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
N Willamette Boulevard Active Transportation Corridor Project
Transportation
Engineering And Design
Design 2023-2024; Construction 2025-2026
N Willamette Blvd is an essential corridor for people traveling throughout the North Portland peninsula. PBOT is excited to have the opportunity to make a major investment to build a world-class biking, walking, and rolling corridor in North Portland.
SW Capitol Highway Street Lighting
Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on SW Capitol Highway and 49th from SW Barbur to Stephenson.
SE Holgate Blvd. Crossing Improvements
Transportation
Engineering And Design
Construction Summer 2024
PBOT will be making crossing improvements along SE Holgate Boulevard at 62nd, 87th, 115th and 125th.
SE Holgate Blvd. Crossings: 103rd, 108th & 112-117th
Transportation
Engineering And Design
Construction Fall 2023
PBOT will be making crossing improvements along SE Holgate Boulevard at SE 103rd and 108th Pl, and sidewalk infill along the south side of Holgate from 112th-117th.
NE 42nd Ave Infill: Killingsworth to Holman
Transportation
Engineering And Design
Construction late summer of fall of 2024
PBOT will be constructing sidewalks and ADA ramps on the east side of 42nd Avenue between NE Killingsworth Street and Holman Street.
NE 46th Avenue & Bryant Street Local Improvement District
Transportation
Partially Open While Under Construction
2024-25
The Portland Bureau of Transportation (PBOT) is constructing Local Improvement District street improvements on NE 42nd Avenue, 46th Avenue, & Bryant Street. Phase 1 includes a new traffic signal, curb ramps, crosswalks, sidewalks, street lighting, and trees. Phase 2 includes additional improvements.
122nd Avenue Crossings (near NE Davis and SE Clinton streets)
Transportation
Engineering And Design
Construction will begin in summer of 2024
The Portland Bureau of Transportation (PBOT) will build new crossings with signals along NE 122nd Avenue near the intersections with Davis and Clinton streets.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.