Construction
Errol Heights Street Improvement Project
Transportation
Engineering And Design
Utility relocations begin March 2022. Construction begins late spring 2022..
The Errol Heights Street Improvement Project will pave the neighborhood’s gravel streets, add sidewalks to the two main east-west routes through the neighborhood, add street lights, address drainage issues, and improve water quality in Johnson Creek.

SW Capitol Highway - Multnomah Village to West Portland Project
Transportation
Under Construction
Construction from June 2021 to December 2022
Sidewalks, bike lanes, stormwater management, and water system upgrades along SW Capitol Highway between SW Multnomah Boulevard and SW Taylors Ferry Road and some nearby streets.
Outer Division Safety Project (SE 80th to 174th avenues)
Transportation
Under Construction
Construction in 2021
New pedestrian crossings with signals, safer intersections, street lighting, protected bike lanes, raised center medians, and landscaping coming to outer SE Division Street in 2021 and 2022.

4M Neighborhood Greenway: SE 130th Avenue to SE 174th Avenue
Transportation
Engineering And Design
Construction to start back up in spring of 2022
The 4M Neighborhood Greenway will be constructed on SE Mill St., SE Millmain Dr., and SE Main St. between SE 130th Ave. and SE 174th Ave. It will create new opportunities for people to walk, bike, and roll on streets running parallel to the high-traffic SE Stark and SE Division corridors.

N Lombard Main Street Repair Project
Transportation
Under Construction
Construction: September 2021 - August 2022
The Portland Bureau of Transportation (PBOT) is reconstructing the pavement and curb ramps on N Lombard Street from N Richmond Avenue to N St Louis Avenue through the heart of downtown St. Johns.

SE 162nd Ave Safety and Access to Transit Project: SE Stark Street to SE Powell Boulevard
Transportation
Engineering And Design
Construction to begin Summer 2022
The Portland Bureau of Transportation (PBOT) will be improving safety for people walking, taking transit, biking, and driving on SE 162nd Ave between SE Stark/Alder St and SE Powell Blvd. The safe crossings are being constructed as part of a partnership between TriMet and the City of Portland.

East Portland Access to Employment and Education: 4M, 100s, and 150s Neighborhood Greenways
Transportation
Under Construction
Construction December 2020-July 2022
This project will build sidewalks, street crossings, bikeway facilities, paved paths, and other safety improvements in multiple neighborhoods of East Portland. It includes the 150s Neighborhood Greenway, a portion of the 4M Neighborhood Greenway, and the 100s Neighborhood Greenway.

NE 122nd Ave Multimodal Safety and Access Improvement Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave Multimodal Safety and Access Improvement Project will provide four new enhanced crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.

70s Neighborhood Greenway: NE Sacramento to SE Flavel
Transportation
Engineering And Design
Construction summer 2022
The Portland Bureau of Transportation (PBOT) is constructing a new neighborhood greenway route between NE Sacramento and SE Flavel around the 70s avenues.

NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2023
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.

SW Naito Parkway at SW Whitaker Street Crossing
Transportation
Engineering And Design
Construction in spring of 2022
PBOT is constructing a pedestrian and bicycle crossing on SW Naito Parkway at SW Whitaker Street.

Brentwood-Darlington Multimodal Improvements
Transportation
Engineering And Design
Construction 2023-2024
This project will provide safe routes to several Title 1 schools and access to transit in a neighborhood with very poor sidewalk coverage by adding sidewalk and constructing a greenway.

East Glisan Street Update: NE 102nd to 162nd Avenues
Transportation
Under Construction
Construction in phases Spring 2018 to Fall 2022
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.

NE Cornfoot Road Corridor Improvements: NE 47th Avenue to NE Alderwood Road
Transportation
Engineering And Design
Construction Spring of 2022
This project will make improvements to NE Cornfoot Road from Airtrans to NE Alderwood Road.

NE 42nd Ave Bridge over NE Lombard
Transportation
Engineering And Design
Construction fall of 2022
The Portland Bureau of Transportation is constructing a new earthquake-ready bridge to fill the gap between the Holman Neighborhood Greenway and the upcoming 47th Ave protected bikeway, while providing better access for freight, walking, and biking.

NE Halsey Street Safety and Access to Transit Project: NE 68th Ave to NE 92nd Ave
Transportation
Engineering And Design
Construction planned to begin 2023
The Portland Bureau of Transportation (PBOT) will construct safety improvements such as crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more along NE Halsey Street.

60s Greenway: North of NE Klickitat Street
Transportation
In Planning
Construction 2023 or 2024
PBOT will add a new northern segment to the recently completed 70s Greenway that currently ends at NE Klickitat Street.
SE 52nd & SE Woodstock Traffic Signal
Transportation
Engineering And Design
Construction winter 2022
This project will install a new traffic signal on SE 52nd Avenue at SE Woodstock Street.
SW 35th Avenue Bike Lane Project: SW 35th Drive to SW Arnold Street
Transportation
Engineering And Design
Construction planned for 2022
The Portland Bureau of Transportation (PBOT) is constructing bike lanes on SW 35th Avenue by reorganizing the road. The project is funded by Fixing Our Streets and is identified in the Southwest in Motion plan.

OR99W/SW Barbur Blvd Area Sidewalk Infill Project
Transportation
Engineering And Design
Construction Spring 2022
This project includes two areas of sidewalk infill where sections of the sidewalk network are missing. Corners in both areas within the project improvements will be brought up to current ADA standards.
See something we could improve on this page? Give website feedback.