Construction
Willamette River Crossing construction updates
Capital Improvement Project
Engineering And Design
2016 through 2030
Timing has changed for implementation of the final phases of design and construction for the Willamette River Crossing project.
Southwest Quail Post Road LID
Water System Improvement Construction
Active
2020 to 2039
The Water Bureau will build new connections between the Quail Park subdivision's privately owned water system and the City's existing public water system. We will also replace the Quail Park water system when it reaches the end of its useful life, or by 2039 (whichever comes first).
South Macadam Avenue water main replacement
Water
In Planning
Spring 2024 to winter 2025
The Water Bureau is investing in reliable water supply in South Portland. We will replace 980 feet of water main (pipe) and two hydrants on South Macadam Avenue between South Bancroft Street and South Lane Street.
Fulton Pump Mains Replacement
Capital Improvement Project
Engineering And Design
Project Dates Pending
The Water Bureau will install 3,350 feet of water main (pipe) in southwest Portland. The pipes are aging and pass underneath the I-5 freeway and SW Barbur Boulevard, where a failure of these older pipes could cause major problems. This project will benefit over 42,000 people served by the main.