Construction
Willamette River Crossing construction updates
Capital Improvement Project
Engineering And Design
2016 through 2030
Timing has changed for implementation of the final phases of design and construction for the Willamette River Crossing project.
NE 122nd Ave RFFA Crossing Improvements Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave RFFA Crossing Improvements project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
SE Washington St Sidewalk Infill Project- SE 80th Ave to SE 82nd Ave
Transportation
Engineering And Design
Construction scheduled for fall 2024.
The Portland Bureau of Transportation (PBOT) is installing new curbs ramps, sidewalk along the south side of SE Washington St from SE 80th Ave to SE 82nd Ave and installing a new sump. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).
Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
NE 60th Avenue and Halsey Street Area Improvement Project
Transportation
Engineering And Design
Construction late 2024
Crews and contractors with the Portland Bureau of Transportation (PBOT) will repave, add traffic signals and turn lanes, widen sidewalks, and build bike improvements along NE 60th Avenue and Halsey Street. This will improve traffic flow and make it safer for pedestrians and people biking or driving.
SE Foster-Woodstock Couplet
Transportation
Engineering And Design
Construction 2024
This project comprises Phase Two of the Lents Town Center Improvements. It will address long-deferred roadway maintenance needs as well as provide safety improvements for all modes of transportation.
Jade and Montavilla Multimodal Improvements Project
Transportation
Engineering And Design
Construction 2024
The Portland Bureau of Transportation (PBOT) will construct improvements on key pedestrian and bicycle routes in the Jade District and Montavilla neighborhood, connecting various neighborhood hubs in Southeast Portland.
NE 97th Avenue and Couch/Davis Street Local Improvement District
Transportation
Engineering And Design
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.
SE Holgate Blvd. Crossing Improvements
Transportation
Engineering And Design
Construction Summer 2024
PBOT will be making crossing improvements along SE Holgate Boulevard at 62nd, 87th, 115th and 125th.
SE Holgate Blvd. Crossings: 103rd, 108th & 112-117th
Transportation
Engineering And Design
Construction Fall 2023
PBOT will be making crossing improvements along SE Holgate Boulevard at SE 103rd and 108th Pl, and sidewalk infill along the south side of Holgate from 112th-117th.
122nd Avenue Crossings (near NE Davis and SE Clinton streets)
Transportation
Engineering And Design
Construction will begin in summer of 2024
The Portland Bureau of Transportation (PBOT) will build new crossings with signals along NE 122nd Avenue near the intersections with Davis and Clinton streets.
60s Neighborhood Greenway: Mt. Tabor to Springwater Corridor Trail
Transportation
Engineering And Design
Construction planned to begin Summer 2024
The Portland Bureau of Transportation will create the 60s Neighborhood Greenway to establish low-stress neighborhood streets that are great places to walk, bike, roll, and play. This north-south greenway will connect destinations in the South Tabor, Mt. Scott-Arletta, Foster-Powell neighborhoods.
SE Gladstone St - SE Center St: SE 52nd Ave Crossing Improvement Project
Transportation
Engineering And Design
Construction to be completed in winter/spring 2025.
Design and implement a safe crossing for bicyclists and pedestrians at SE 52nd Ave to make connections to the existing Gladstone Neighborhood Greenway.
SE 89th Avenue & Taylor Street Local Improvement District
Transportation
Engineering And Design
Late 2024
This Local Improvement District (LID) will construct street and sidewalk improvements on portions of SE Taylor Street and SE 89th Avenue next to Berrydale Park.
82nd Avenue Critical Fixes: Glisan and Davis Signal Improvements
Transportation
Engineering And Design
Construction 2025-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including rebuilding signals at NE 82nd Avenue at Glisan and Davis streets.
SE Steele Street Pathway Project
Transportation
Engineering And Design
Construction expected in 2024
Crews contracted by PBOT will construct a walking space between SE 92nd Avenue and the Interstate 205 multi-use path along SE Steele Street and update two corner curb ramps on the east side of the intersection.
82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.
SE 14th and Bybee Crossing
Transportation
Engineering And Design
Late Summer 2024
Portland Bureau of Transportation (PBOT) will rebuild the southeast corner ADA ramp of SE 14th Avenue and Bybee Boulevard, realign the northbound travel lanes on SE 13th Avenue, and daylight parking to improve the crossing experience for people walking and biking.
See something we could improve on this page? Give website feedback.