82nd Avenue Critical Fixes: Street Lighting
Transportation
Under Construction
Construction begins June 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
NE 105th and Marx Pump Station Project
Sewer and Stormwater
Active
The project is in the design phase. Construction is anticipated to begin in fall 2025 and it will take about 18 months to complete.
Environmental Services is designing a project to upgrade and expand the aging pump station located at NE Marx Street and 105th Avenue in the Parkrose neighborhood. The project will modernize equipment, increase system capacity, and help protect public health and the environment.
Citywide Sump Repair and Replacement
Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.
NE 42nd Ave Infill: Killingsworth to Holman
Transportation
Engineering And Design
Construction late summer of fall of 2024
PBOT will be constructing sidewalks and ADA ramps on the east side of 42nd Avenue between NE Killingsworth Street and Holman Street.
NE 46th Avenue & Bryant Street Local Improvement District
Transportation
Partially Open While Under Construction
2024-25
The Portland Bureau of Transportation (PBOT) is constructing Local Improvement District street improvements on NE 42nd Avenue, 46th Avenue, & Bryant Street. Phase 1 includes a new traffic signal, curb ramps, crosswalks, sidewalks, street lighting, and trees. Phase 2 includes additional improvements.
NE 43rd and NE Irving Green Street and Sewer Project
Sewer and Stormwater
Active
Project design continues. Construction is anticipated to begin in June of 2024 and take up to six months to complete.
Environmental Services is designing a project in the Laurelhurst and North Tabor neighborhoods to repair sewer pipes and construct green street planters to manage stormwater runoff from streets and roofs. This project will relieve basement sewer backup risk and reduce street flooding in the area.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
Dekum Court
Rental
Under Construction
Winter 2025
Home Forward will add 147 new affordable units and redevelop 40 existing homes at its family-focused Dekum Court property in Concordia.
Sandy Boulevard Sewer and Stormwater Project
Sewer and Stormwater
Active
Construction is currently expected to begin January 2025 and take up to two years to complete.
Environmental Services is designing a project to install and upsize public sewer pipes within the Kerns neighborhood and a small portion of the Buckman neighborhood. These improvements will increase sewer capacity, relieve sewer backups, and reduce street flooding.
Signalized School Route Crossings
Transportation
Under Construction
In Construction
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
Grand Avenue Riser Stabilization Project
Sewer and Stormwater
Active
Project design is nearly complete. Construction is anticipated to begin in June of 2024 and will take up to five months to complete.
Environmental Services is designing a project to stabilize soils at maintenance hole risers located along Grand Avenue. Soils are settling, requiring layers of asphalt to provide safe driving surfaces. This project will design a solution to stabilize soils and prevent settlement.
Killingsworth Street Repaving and Safety Improvements
Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Mejoras de seguridad y repavimentación de la calle Killingsworth
Transportación
Ingeniería Y Diseño
–
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard
NE Sacramento-Knott Neighborhood Greenway: NE 122nd Ave - NE 162nd Ave
Transportation
Engineering And Design
Construction planned for 2024
A new neighborhood greenway on NE Sacramento and other local streets between 122nd and 162nd. This project will reduce speeds and add wayfinding signs and pavement markings to connect the Parkrose Heights, Russell, and Wilkes neighborhoods
Parkrose Neighborhood Greenway
Transportation
Open While Under Construction
Construction Spring 2024
The Portland Bureau of Transportation (PBOT) will create the Parkrose Neighborhood Greenway to establish low-stress neighborhood streets that are great places to walk, bike, and roll. The greenway will connect the Parkrose Neighborhood on NE 115th Ave and on NE Skidmore Street.
North River Sewer Repair Project
Sewer and Stormwater
Active
Construction is expected to start September 2024 and take about 6 months to complete.
Environmental Services is designing a project to replace deteriorating sewer pipe under North River Street between Albina and Interstate avenues. Taking these actions now reduce the possibility of costly breaks, leaks, blockages and sewage releases to buildings, streets, streams, and rivers.
Inverness System Planning Project
Sewer and Stormwater
In Planning
This project is in the planning phase. Planning and analysis will continue through the summer of 2024.
The Inverness pump station and force main system (The Inverness System) is nearing the end of its service life, and is in need of repair or replacement. This project will choose a preferred solution for repair and/or replacement that protects public health and the environment.